Loading...
HomeMy WebLinkAboutSDP200800083 Plan - Other (not approved)r EXISTING ASPHALT PARKIN& EXI5TINCP GHLWH EXISTING PLAY AREA EXI5TNO iHNAG I Ili I i I EXIS 1xLx NOR1fH 1 V 1 1CZJL.L b E m LIMITS OF WORK ri - 9 Legend A101 A101 No Scale r O 5LIX-STONE WALK I I A102 AIO2 FOUNDATION DRAINAGE TYP, RUN TO DAYLIGHT BELOW SOUTH OF NEK TERRACE) EDGE OF GEMETARY Q PLOT, TYPICAL t CREATE SWALE BEHIND WALL TO DIRECT RUNOFF AROUND WALL NOTE: ALIGN BACK OF COLUMBARIA WALL WEDGE R OF GEMETARY PLOT AS T0 1 ,TQSHOWN. }. c W-01111 BENCH (1), BOXWOOD HEDZSO 4 ) TREES BY OWNER (ALIGN WAGE WEDGE OF COLUMBARIA WALL BENCHES BY OKN1Wk--J AS SHOW" 000 O6 Enlarged Plan 0 Columbaria BENGH(I), BOXWOOD HEDGE 4 (4) TREES 5% OWNER (ALIGN BOXWOOD HEDGE WEDGE OF GOLUMBARIA WALL AS SHOW (SEE OPP051 TE FOR APPROX. RETURNS) Al A102 Scale: 1/8" Iq 18 Al O A102 Al O A102 Q 2'-8"12' -0" 4" BLUESTONE GAP t EIOKHmF COLUI WARIA i BLUE5TONE BASE; JOINT TO ALIGN WITH WALK JOINT /GAP JOINTS a , , tvT _ 7 7 Ib AIO A102 Scale: 1/2" = 1' -0" 1/2 "0 STEEL BAR, CENTER ON I" X 2" UPRIGHT 1 1/2 "0 5TL PIPE 10 I" X 2" BAR STOCK b" I' -0" EQ. EO.Al O 2" CLEAR] b" EIOKHmF COLUI WARIA i BLUE5TONE BASE; JOINT TO ALIGN WITH WALK JOINT /GAP JOINTS a , , tvT _ 7 7 Ib AIO A102 Scale: 1/2" = 1' -0" 1/2 "0 STEEL BAR, CENTER ON I" X 2" UPRIGHT 1 1/2 "0 5TL PIPE 10 I" X 2" BAR STOCK b" I' -0" EQ. EO.Al O 2" CLEAR] b" L 12 16 Section Ramp A101 A102 Scale: 112" = V -0" A102 EO Aim 1 -1/2" BLUESTONE 2" 5ETTINS BED 4" CONCRETE SLAB W/HWF 6X6 611 GRAV //!EO. ins 4" BLUESTONE GAP 2' - 011 t 6" FIELDSTONE 6ROUTED 50LID COLUMBARIA, BY OWNER FACE OF FIELDSTONE ti Q BEYOND m 5 1/4" BLUESTONE FRONT, AL 16N WFAGE OF L 12 16 Section Ramp A101 A102 Scale: 112" = V -0" A102 EO Aim 1 -1/2" BLUESTONE 2" 5ETTINS BED 4" CONCRETE SLAB W/HWF 6X6 611 GRAV //!EO. ins 0 EO. I' -4" I EDGE Op CEMETARY A1102 PLOT, TYPICAL t BLUE5TONE RAMP HANDRAIL W GREATS 5WALE BEHIND - WALL TO DIRECT RUNOFF AROUND WALL G OLUMBARIA 1 . 108 NICHE5 (2) UNI FIELD STONE PIERS BLUESTONE GAP TYPO-EACH III-O all — Tit 18 Section thru Coluan NOTE: MATCH OPPOSITE 510E FOR 01MEN51ON5 4 DETAILS L EXI5TIN6 HVAG 11 EXISTING PATH 8 -O 8 -O I - EO. EO. -q 8--O oil A102 A105 — — — BOXWpOD HEDGE BY OK4NER) WOOD P05T 4 CHAIN FENCE„ TYP SEE I b /AIO5 EDGE (OF CEMETARY PLOT, TYPICAL t 08 Enlarged Plan ' Entry 19 Section thruFieldS@ Col umbaria AIOJ A102 Scale: 1/8" = V -0" 4" BLUESTONE GAP 2' - 011 t 6" FIELDSTONE b" GMU H/GELLS 6ROUTED 50LID COLUMBARIA, BY OWNER FACE OF FIELDSTONE ti t-Idl Q BEYOND m 5 1/4" BLUESTONE FRONT, AL 16N WFAGE OF I I Ww I BLUESTONE GAP 1 I 11 - ^N1 '/11 r-IQ 2" SETTING BED r b" CONCRETE DRAINAGE BD FILTER FABRIC REINF. MA50NRY WALL , e o I' - CONTIN. BELOW ROCK WALL BEYOND H / BLUESTONE GAP I 11 U DRAINAGE BO FILTER FABRIC, 1 -1/2" STEEL HANDRAIL REINF. MA50NRY WALL 1 -1/2" BLUESTONE GROUT 50LID 2m 5ETTING BED CONTIN. BELOW b" 6RAVE.LTRANSITION STEEL EDGE 4 ADS TO STORM DRAIN 1% MIN SLOPE CONCRETE FOOTER — 0 .4052 "0.. 0 0 0 0 5) *4 CONT. bill 21_11 611 31_yll 0 EO. I' -4" I EDGE Op CEMETARY A1102 PLOT, TYPICAL t BLUE5TONE RAMP HANDRAIL W GREATS 5WALE BEHIND - WALL TO DIRECT RUNOFF AROUND WALL G OLUMBARIA 1 . 108 NICHE5 (2) UNI FIELD STONE PIERS BLUESTONE GAP TYPO-EACH III-O all — Tit 18 Section thru Coluan NOTE: MATCH OPPOSITE 510E FOR 01MEN51ON5 4 DETAILS L EXI5TIN6 HVAG 11 EXISTING PATH 8 -O 8 -O I - EO. EO. -q 8--O oil A102 A105 — — — BOXWpOD HEDGE BY OK4NER) WOOD P05T 4 CHAIN FENCE„ TYP SEE I b /AIO5 EDGE (OF CEMETARY PLOT, TYPICAL t 08 Enlarged Plan ' Entry 19 Section thruFieldS @ Col umbaria AIOJ A102 Scale: 1/8" = V -0" 15 d Z Q Q Section thru Wall @Ramp A102 Scale: 3/4 = 1' -0" I111 EQ. 54" EQ. Plan Section GMU b" FIEL05TONE DRILL 2 -1/2" HOLE (F.V) IN BLUESTONE TO RELIEVE HANDRAIL UPRIGHT 4 I" X 2" STL STOCK UPRIGHT 1/2" BLUESTONE JOINT, TYP, SEE PLAN FOR LOCATIONS BLUESTONE RAMP thru Wall @ Ramp Scale: 3/4 = 1' - 0 " 11 I1_4" BLUESTONE GAP b" FIEL05TONE 8" CMU H/CELLS GROUTED 50LID V I m GRAPHIC SCALE Scale: 1/8" =1' - 0" 8' 4 0 8' 16' Scale: 1/2" = 1' - 0" 2' 1' 0 2' 4' Scale: 3/4 " =1' - 0" 11-411 811 0 V - 411 21 - 811 1 1/4" BLUESTONE HALK 2" SETTING BED b" CONCRETE Olivet Presbyterian Church Charlottesville, Virginia tt TRAN51TION 4 A05 TO STORM — DRAIN 1% MIN SLOPE NC CONCRETE BASE FOR wRrm FOOTER = GOLUMBARIA *4 O 52" O. C. Q 0 0 0 0 5) *4 CONT. 5' -b" A10 X102 Scale: 3/4" = T -0" EDGE OF GEMETARY PLOT, TYPICAL t Q .. ....... A10 A102 Scale: 3/4" = 1' - 0" 4 BLUESTONE GAP I 1 b" FIELDSTONE _ GMU WITH CELLS 1. Al GROUTED SOLID HORIZONTAL WALL TIES FILTER FABRIC AND DRAINAGE BD 4 TO STORM DRAIN 1% SLOPE MIN. • 4 • 52" O.G. 5) *4 CONT__L L REINF. GONG. FTC. 21_A M Working Drawings WORKING DRAWINGS 31 JULY 2009 ArC nt's PmIW Nunbw: 2806 Train &Partners A r c h i t e c t s 1218 East Market Street Chariottesville, Virginia 22902 434.293.2965vox 295.5122(ax www.trainarchitects.com Enlarged Plans & Site Details Drawing: JEM Checking: TRK Rev 01:0000 -00 -00 Rev 02: 0000 -00 -00 Rev 03:0000 -00 -00 A1.02 4" BLUESTONE GAP t 6" FIELDSTONE b" GMU H/GELLS 6ROUTED 50LID COLUMBARIA, BY OWNER FACE OF FIELDSTONE ti t-Idl Q BEYOND m 5 1/4" BLUESTONE FRONT, AL 16N WFAGE OF BLUESTONE GAP 1 1/4" BLUESTONE WALK r-IQ 2" SETTING BED r b" CONCRETE DRAINAGE BD FILTER FABRIC REINF. MA50NRY WALL , GROUT 50LID CONTIN. BELOW 15 d Z Q Q Section thru Wall @Ramp A102 Scale: 3/4 = 1' -0" I111 EQ. 54" EQ. Plan Section GMU b" FIEL05TONE DRILL 2 -1/2" HOLE (F.V) IN BLUESTONE TO RELIEVE HANDRAIL UPRIGHT 4 I" X 2" STL STOCK UPRIGHT 1/2" BLUESTONE JOINT, TYP, SEE PLAN FOR LOCATIONS BLUESTONE RAMP thru Wall @ Ramp Scale: 3/4 = 1' - 0 " 11 I1_4" BLUESTONE GAP b" FIEL05TONE 8" CMU H/CELLS GROUTED 50LID V I m GRAPHIC SCALE Scale: 1/8" =1' - 0" 8' 4 0 8' 16' Scale: 1/2" = 1' - 0" 2' 1' 0 2' 4' Scale: 3/4 " =1' - 0" 11-411 811 0 V - 411 21 - 811 1 1/4" BLUESTONE HALK 2" SETTING BED b" CONCRETE Olivet Presbyterian Church Charlottesville, Virginia tt TRAN51TION 4 A05 TO STORM — DRAIN 1% MIN SLOPE NC CONCRETE BASE FOR wRrm FOOTER = GOLUMBARIA *4 O 52" O. C. Q 0 0 0 0 5) *4 CONT. 5' -b" A10 X102 Scale: 3/4" = T -0" EDGE OF GEMETARY PLOT, TYPICAL t Q .. ....... A10 A102 Scale: 3/4" = 1' - 0" 4 BLUESTONE GAP I 1 b" FIELDSTONE _ GMU WITH CELLS 1. Al GROUTED SOLID HORIZONTAL WALL TIES FILTER FABRIC AND DRAINAGE BD 4 TO STORM DRAIN 1% SLOPE MIN. • 4 • 52" O.G. 5) *4 CONT__L L REINF. GONG. FTC. 21_A M Working Drawings WORKING DRAWINGS 31 JULY 2009 ArC nt's PmIW Nunbw: 2806 Train &Partners A r c h i t e c t s 1218 East Market Street Chariottesville, Virginia 22902 434.293.2965vox 295.5122(ax www.trainarchitects.com Enlarged Plans & Site Details Drawing: JEM Checking: TRK Rev 01:0000 -00 -00 Rev 02: 0000 -00 -00 Rev 03:0000 -00 -00 A1.02 FIELDSTONE PIER WBLUESTONE GAP SW Elevation @Gate Entry Stair Scale: 1/2" = 1' -0" 865 08 NE Elevation @Gate Entry Stair 10 J A1031 Scale 1/2" = 1' -0" 2' -0" 4 d1 EXISTING SHALE BOXWOOD HEDGE BY OWNER) — 0 A103 A105 4 I FV Ib N j A105 A105 FV M r Q 4 Enlarged Plan @Gated Entry Scale: 1/8" = V -0" ATE BY (OWNER, INSTALLED BY CONTRZACTOR CA5T IROhN PIVOT RIN6 BY OWNER, IN95TALLED BY 0ONTRA07 SET INTO MA50NRY' PIER, TYP BOTH SIDES LONG LE63 EYE 50REH SET INTO WA50NRY WORK, TYFP BOTH SIDES FIELDSTONE PIER W/BLUE5TONE GAP METAL HANDRAIL, PTD BLUESTONE STEP BLUESTONE PAVER d — SUBSTRATE, SEE 15/AI.05 BLUESTONE GAP FIELDSTONE PIER GATE BY OWNER, INSTALLED BY CONTRACTOR 1 -1/2 "0 5TL. 50H. 40, PT 1/2 5TL., F N, 1" x 2" SQUARE STEEL. M 50LID STEEL STOCK I' 2" BLUESTONE (6" X 1559 _ TYP ON IN 5ETTIN6 BED SLOPE EACH TREAD) n o Section @Gate Entry Stair 1 in 14 EXI5TING ASPHALT - 66.5 t F.V. Scale: 1/2" = V -0" 13 16 Elevation New Gate & Fence A l nTl n n TYPICAL P05T — AND CHAIN FENCE III 00140IRZTE FOOTINGIII I I (5) b" DIAMETER DPIII GRAVEL FILL III g" GMU (TYP) III III III III III III o9 Stair Foundation Plan A101 A103 Scale: 1/4" = 1' -0" 105 6" 7-0" 6" 51 -0 " A105 I tom" A105 Section @Fieldstone Pier BLUE5TONE GAP - FIELDSTONE PIER BLUESTONE (6" X 155"9 ON I" SETTING BED SLOPE EACH TREAD) 6" FIELD STONE GMU WITH CELLS GROUTED SOLID GRADE FILTER FABRIC AND DRAINAGE BD GRAVEL FILL 4 ADS TO STORM - DRAIN 1% SLOPE MIN. Stair Section Scale: 1/2" = 1' -0" 4" BLUE5TONE GAP, I PIECE, ANCHOR INTO PIER 6" FIELDSTONE 4 GMU WITH CELLS ROUTED 50LID HORIZONTAL WALL TIES • 16" O.G. t_ 1 -1/2" BLUESTONE 2" SETTING BED 4" CONCRETE 6" GRAVEL FILTER FABRIC, AND DRAINAGE BD 4 A05 TO STORM DRAIN 1% SLOPE MIN. REINF. GONG. FTC. 5) M4 GONT k AiosJ Scale: 3/4" = 1' -0" NOTE: 6C, SHOULD REVIEH INSTALLATION OF GATE W/OHNER i ARCHITECT PRIOR TO STARTING ALL STONE HORK; PIERS AND FLATS. 2" F.V. PIVOT PLATE 6RADE Q z f Q 4 Q GA5T IRONY PIVOT PLATE BY OWNER, INZTALLED BY I QCONTRA01TOR. PROVIDE 1-5/6"± DIAN4 -MTER HOLE IN iv BLUESTON!£ FOR PIVOT PLATE. SEE 14/AIM5, TYP BOTH SIDES CHAMFERED GAP 6" Xb" WOOD POST EYE 50REW CHAIN FENCE SET IN COMPACTED 501L WORKING DRAWINGS 31 JULY 2009 Architect's Project N=ber: 2906 Train &Partners A r c h i t e c t s 1218 East Market Street Chariottesville, Virginia 22902 434.293.2965vox 295.5122fax www.trainarchitects.com 1-7 Scale: 112" = 1' -o' s 4 CMU W/GELLS GROUTED SOLID 6" FIELDSTONE 1/2" BLUESTONE JOINT BELOW SEE PLANS FOR LOCATION5) DRILL 1- 5/6 "t, F.V. W/PIVOT PLATE) HOLE IN BLUE5TONE FOR GRAPHIC SCALEATETURN ATE ABOVE Scale: 1/8 " =1' - 0" N"%mmmm" 8' 4' 0 8' 16' Scale: 1/2" =1' - 0"p 14 Section Plan Detail Alo A103 Scale: 3/4" = 1' -0" 2' 1' 0 2' 4' Scale: 3/4 " =1' - 0" 11 -411 811 0 1' - 4 " 2-8 11 Working Drawings Olivet Presbyterian Church Charlottesville, Virginia Enlarged Plans & Site Details Drawing: JEM Checking: TRK Rev 01:0000 -00 -00 Rev 02:0000 -00 -00 Rev 03:0000 -00 -00 A1.03 6" TYP 6 TYP wII 12 EQA103,4'A103 BLUESTONE STEPS NEW &ATE` BLUESTONE PAVERS FIELD STONE PIERS WOOD P05T 4 CHAIN FENCE BOXWOOD HEDGE BY OWNER) — 0 A103 A105 4 I FV Ib N j A105 A105 FV M r Q 4 Enlarged Plan @Gated Entry Scale: 1/8" = V -0" ATE BY (OWNER, INSTALLED BY CONTRZACTOR CA5T IROhN PIVOT RIN6 BY OWNER, IN95TALLED BY 0ONTRA07 SET INTO MA50NRY' PIER, TYP BOTH SIDES LONG LE63 EYE 50REH SET INTO WA50NRY WORK, TYFP BOTH SIDES FIELDSTONE PIER W/BLUE5TONE GAP METAL HANDRAIL, PTD BLUESTONE STEP BLUESTONE PAVER d — SUBSTRATE, SEE 15/AI.05 BLUESTONE GAP FIELDSTONE PIER GATE BY OWNER, INSTALLED BY CONTRACTOR 1 -1/2 "0 5TL. 50H. 40, PT 1/2 5TL., F N, 1" x 2" SQUARE STEEL. M 50LID STEEL STOCK I' 2" BLUESTONE (6" X 1559 _ TYP ON IN 5ETTIN6 BED SLOPE EACH TREAD) n o Section @Gate Entry Stair 1 in 14 EXI5TING ASPHALT - 66.5 t F.V. Scale: 1/2" = V -0" 13 16 Elevation New Gate & Fence A l nTl nn TYPICAL P05T — AND CHAIN FENCE III 00140IRZTE FOOTINGIII I I (5) b" DIAMETER DPIII GRAVEL FILL III g" GMU (TYP) III III III III III III o9 Stair Foundation Plan A101 A103 Scale: 1/4" = 1' -0" 105 6" 7-0" 6" 51 -0 " A105 I tom" A105 Section @Fieldstone Pier BLUE5TONE GAP - FIELDSTONE PIER BLUESTONE (6" X 155"9 ON I" SETTING BED SLOPE EACH TREAD) 6" FIELD STONE GMU WITH CELLS GROUTED SOLID GRADE FILTER FABRIC AND DRAINAGE BD GRAVEL FILL 4 ADS TO STORM - DRAIN 1% SLOPE MIN. Stair Section Scale: 1/2" = 1' -0" 4" BLUE5TONE GAP, I PIECE, ANCHOR INTO PIER 6" FIELDSTONE 4 GMU WITH CELLS ROUTED 50LID HORIZONTAL WALL TIES • 16" O.G. t_ 1 -1/2" BLUESTONE 2" SETTING BED 4" CONCRETE 6" GRAVEL FILTER FABRIC, AND DRAINAGE BD 4 A05 TO STORM DRAIN 1% SLOPE MIN. REINF. GONG. FTC. 5) M4 GONT k AiosJ Scale: 3/4" = 1' -0" NOTE: 6C, SHOULD REVIEH INSTALLATION OF GATE W/OHNER i ARCHITECT PRIOR TO STARTING ALL STONE HORK; PIERS AND FLATS. 2" F.V. PIVOT PLATE 6RADE Q z f Q 4 Q GA5T IRONY PIVOT PLATE BY OWNER, INZTALLED BY I QCONTRA01TOR. PROVIDE 1-5/6"± DIAN4 -MTER HOLE IN iv BLUESTON!£ FOR PIVOT PLATE. SEE 14/AIM5, TYP BOTH SIDES CHAMFERED GAP 6" Xb" WOOD POST EYE 50REW CHAIN FENCE SET IN COMPACTED 501L WORKING DRAWINGS 31 JULY 2009 Architect's Project N=ber: 2906 Train &Partners A r c h i t e c t s 1218 East Market Street Chariottesville, Virginia 22902 434.293.2965vox 295.5122fax www.trainarchitects.com 1-7 Scale: 112" = 1' -o' s 4 CMU W/GELLS GROUTED SOLID 6" FIELDSTONE 1/2" BLUESTONE JOINT BELOW SEE PLANS FOR LOCATION5) DRILL 1- 5/6 "t, F.V. W/PIVOT PLATE) HOLE IN BLUE5TONE FOR GRAPHIC SCALEATETURN ATE ABOVE Scale: 1/8 " =1' - 0" N"%mmmm" 8' 4' 0 8' 16' Scale: 1/2" =1' - 0"p 14 Section Plan Detail Alo A103 Scale: 3/4" = 1' -0" 2' 1' 0 2' 4' Scale: 3/4 " =1' - 0" 11 -411 811 0 1' - 4 " 2-8 11 Working Drawings Olivet Presbyterian Church Charlottesville, Virginia Enlarged Plans & Site Details Drawing: JEM Checking: TRK Rev 01:0000 -00 -00 Rev 02:0000 -00 -00 Rev 03:0000 -00 -00 A1.03 6" TYP 6 TYP