HomeMy WebLinkAboutSDP200800096 Letter of Revision Letter of Revision 1 2009-09-09IRGII
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
September 9, 2009
Jennifer Whitaker, PE
695 Moores Creek Lane
Charlottesville, VA 22902 -9016
RE: Moores Creek Nutrient Removal -Major SDP2008 -100
Dear Ms. Whitaker:
This letter is to approve as a letter of revision:
1. Phasing of the above mentioned site plan major amendment,
as shown and described in the revised plan and letter of explanation dated September 9,
2009 (reduced plan and original letter attached). This approval is viewed as your first
Letter of Revision for the above - mentioned final site plan, entitled SDP2008 -100 Moores
Creek Nutrient Removal- Major. Please be aware that you are only allowed three letters
of revision before any future changes to the plan are required to be submitted in the form
of a new site plan amendment (along with the proper fee) that shows the proposed
changes and all previously approved conditions that are to remain.
If you have any questions please feel free to contact me.
Sincerely,
Summer Frederick
Senior Planner
Cc: Matt Buswell; Hazen & Sawyer
p,SEa & SfwF9
Cy4R Or TESV1U
RIVANNA WATER & SEWER AUTHORITY
695 MOORES CREEK LANE • CHARLOTTESVILLE. VIRGINIA 22902 -9016
434) 977 -2970 • FAX: (434) 293 -8858 • WEBSITE: WWW.RIVANNA.ORG
Ms. Summer Frederick
Senior Planner
Albemarle County
401 McIntire Road
Charlottesville, VA 22902 -4596
Hand Delivered
September 9, 2009
RE:
Dear Ms. Frederick:
RWSA Moores Creek WWTP
Major Site Plan Amendment
SDP2008 -100
Phasing Plan Adjustment
The Rivanna Water and Sewer Authority is currently under construction of the Nutrient Removal
Improvements at our Moores Creek Waste Water Treatment Plant. As approved in the site plan, the project
includes the construction of several new structures, the rehabilitation of most plant facilities, extensive site
work and the relocation of two existing engineering trailers. In the past several weeks, the trailers have been
relocated and the building permits and inspection are near completion. In an effort to obtain final occupancy,
the County zoning staff has requested that RWSA submit a revised phasing plan to you. It is my
understanding that upon review and acceptance of the plan, a letter of revision may be issued. Once this is
complete, the final occupancy permit can be completed.
Please find attached, a proposed phasing plan for the Moores Creek Wastewater Treatment Plant, which
specifically addressed the phasing of the trailer relocations in reference to the remainder of the plant
construction. Thank you for your ongoing efforts to complete this important project. Please do not hesitate
to contact me with any questions.
Sincerely,
Jennifer Whitaker, P.E.
Chief Engineer
Cc: Hazen & Sawyer
S SERVING CHARLOTTESVILLE & ALBEMARLE COUNTY S