HomeMy WebLinkAboutSDP200800096 Letter of Revision Letter of Revision 1 2009-09-09IRGII COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 9, 2009 Jennifer Whitaker, PE 695 Moores Creek Lane Charlottesville, VA 22902 -9016 RE: Moores Creek Nutrient Removal -Major SDP2008 -100 Dear Ms. Whitaker: This letter is to approve as a letter of revision: 1. Phasing of the above mentioned site plan major amendment, as shown and described in the revised plan and letter of explanation dated September 9, 2009 (reduced plan and original letter attached). This approval is viewed as your first Letter of Revision for the above - mentioned final site plan, entitled SDP2008 -100 Moores Creek Nutrient Removal- Major. Please be aware that you are only allowed three letters of revision before any future changes to the plan are required to be submitted in the form of a new site plan amendment (along with the proper fee) that shows the proposed changes and all previously approved conditions that are to remain. If you have any questions please feel free to contact me. Sincerely, Summer Frederick Senior Planner Cc: Matt Buswell; Hazen & Sawyer p,SEa & SfwF9 Cy4R Or TESV1U RIVANNA WATER & SEWER AUTHORITY 695 MOORES CREEK LANE • CHARLOTTESVILLE. VIRGINIA 22902 -9016 434) 977 -2970 • FAX: (434) 293 -8858 • WEBSITE: WWW.RIVANNA.ORG Ms. Summer Frederick Senior Planner Albemarle County 401 McIntire Road Charlottesville, VA 22902 -4596 Hand Delivered September 9, 2009 RE: Dear Ms. Frederick: RWSA Moores Creek WWTP Major Site Plan Amendment SDP2008 -100 Phasing Plan Adjustment The Rivanna Water and Sewer Authority is currently under construction of the Nutrient Removal Improvements at our Moores Creek Waste Water Treatment Plant. As approved in the site plan, the project includes the construction of several new structures, the rehabilitation of most plant facilities, extensive site work and the relocation of two existing engineering trailers. In the past several weeks, the trailers have been relocated and the building permits and inspection are near completion. In an effort to obtain final occupancy, the County zoning staff has requested that RWSA submit a revised phasing plan to you. It is my understanding that upon review and acceptance of the plan, a letter of revision may be issued. Once this is complete, the final occupancy permit can be completed. Please find attached, a proposed phasing plan for the Moores Creek Wastewater Treatment Plant, which specifically addressed the phasing of the trailer relocations in reference to the remainder of the plant construction. Thank you for your ongoing efforts to complete this important project. Please do not hesitate to contact me with any questions. Sincerely, Jennifer Whitaker, P.E. Chief Engineer Cc: Hazen & Sawyer S SERVING CHARLOTTESVILLE & ALBEMARLE COUNTY S