Loading...
HomeMy WebLinkAboutSUB201600063 Checklist - Project Closeout (Administrative) 2016-04-07 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please corn a lete this form within 30 days of final action,place in folder and forward to CDA FOR QC and st• • lab•I. CDA will forward to the Imaging Center for digital closeout. SDP SUB # , +/16 —63 PROJEC ' TITL „ G, ,r F r AO FUL • , ME OF LEAD REVIEWER . ' -2 --G-- FINAL ACTION DATE: C!—7- I Cou View— Application,Page 2 Data Entered I s„ I Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse 1 chronological order(latest on top). i Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. I j on can 0 Save oca gApplicati (signature copy) Scan 0 Saved location ce 1,23-Applicant C n espondence(to/from,memos/emails) Scan 0 Saved locationtEr Complete t of printed Review Comments Scan 0 Saved location Approved lan/plat(signed, or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location 1 I lill 1 libli•rr a Arff au 'mum gry 9L[l40 n• me Action Letter) ssessments t, am i.e. u ies m—i.e. u fes •- + , •+ 1 - s a iscre ion co lies o `r ire a a a ed plans/plats may be placed in the file if it is referenced in the a -muesane ens - review ata later date. If such plans are included, they should be c unapproved an, a , • , ate clarifying why it was included. — 1 J Additional Information on this project: 1