Loading...
HomeMy WebLinkAboutSDP200900051 Approval - Agencies 2009-06-14nt,eF tr r9 IHGIN County of Albemarle Department of Community Development Memorandum To:Elizabeth Marotta, Current Development Project Planner From: Phil Custer, Current Development engineering review Date:14 June 2009 Rev. 1) 14 August 2009 Subject: South Plains Presbyterian Church Preliminary Site Plan (SDP- 2009 - 00051) The second submittal of the preliminary site plan for the South Plains Presbyterian Church has been reviewed. 1. The stormwater quality computations should be revised. On the plan, please show the drainage area from the point of analysis used in the Simple Method Spreadsheet. The point of analysis should be positioned at a reasonable location that would capture as much of the developed site runoff as possible, but not the entire property. In addition, using sheet flow as a stormwater quality measure is not appropriate for this site because water concentrates in the VDOT roadside ditch or the 12" culvert before reaching a vegetated buffer. A notable portion of the site drains to the roadside ditch on Route 22 and this should be shown graphically. Also, the three areas specified in the spreadsheet (4.66 acres in project area, 5.1.5 acres totaled in the pre - development column, and 4.80 acres totaled in the post- development column) should all be equal, but are not. Rev. 1) The conceptual stormwater management plan is adequate for preliminary approval, except for the note on the cover sheet stating that the water quality treatment is provided through the use of a vegetated buffer. When the WPO plan is submitted for ESC and SWM quality review please make sure to provide the following: a modified simple spreadsheet for each SWM facility for infiltration facilities, soil permeability tests (at least two per facility) an evaluation of the downstream channel confirming compliance with VESCH Minimum Standard 19 facilities meeting all standards specified in the latest edition of the design manual 3. The existi i g entrance to the parking lot should be improved at this time so that one safe connection to a public street is provided. The entrance should be located where shown on the approved S Rev. I) E gineering review notes that VDOT has consented to the phasing of the entrance upgrade. owever, it is still the position of county engineering that the existing condition of uncon ri lied access onto the public road should be corrected with this plan. The current arro gement of the parking lot meets no existing county or VDOT standard. If the plan were 114-0116 VI+ Vrefitivli itu ttvit't urvytt r P `I S r l V CV (. '- 1 IRGINI COUNTY OF ALBEMARLE Department of Community, Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 26, 2009 Mr. William H. Atwood Atwood Architects 250 W. Main Street Charlottesville, VA 22902 RE: SDP - 2009 -51 South Plains Presbyterian Church- Preliminary Approval Dear Sir: The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on August 26, 2010. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. As applicable, Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division/agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: 1 Current Development Plannin approval to include: 18.32.6] In addition to meeting all of the requirements of 32.5.6 (for preliminary site plan), the final site plan must meet all final site plan requirements. 32.5.6.c] Clearly label the limits of all Phase I work and these Limits must coordinate with those shown on the ARB plans. The landscape plan must include the plantings per Condition #10 of SP2008 -28. The installation of all proposed plantings must be included as part of Phase 1. 32.5.6.p/ SP2008 -28] License agreement for plantings required by condition #10 of SP 2008 -28 must be executed prior to final plan approval. 32.5.6.p] The Conservation Checklist must be completed and signed prior to final plan approval. Current Development Enaineerin2 approval to include: Approval of WPO Plan to include Erosion and Sediment Control and Stormwater Management Plans. Final site plan approval Please contact Phil Custer at 296 -5832 x3072 if you have questions or require additional information. Fire & Rescue approval Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval Please contact Joel DeNunzio at 293 -0011 ext. 120 if you have questions or require additional information. Architectural Review Board approval Please contact Eryn Brennan at 296 -5832 x3029 if you have questions or require additional information. ADDITIONAL DEPARTMENT/DIVISION /AGENCY approval to include: Thomas Jefferson Health Department Inspections Division- contact Jay Schlothauer at 296 -5832 x 3228 Please contact Elizabeth Marotta at 296 -5832 x 3432 if you have questions or require additional information. Sincerely, 47 Elizabeth M. Marotta, Senior Planner Zoning & Current Development File: SDP - 2009 -51 Cc: Ashley Cooper, AICP South Plains Church 2