Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP200900045 Review Comments 2009-07-29
Application #:SDP200900045 Short Review Coma -rants Project Name: Old Trail Phase VIII (Block 2) - Final Final — Non- residential — Administrative Final — Residential — Administrative Date Completed:07/16/2009 Reviewer:Eryn Brennan ARB Review Status:Requested Changes Reviews Comments: Awaiting revised plans - see comments below. The ARB provided comments at the May 18, 2009 meeting and determined that the building form and landscaping for the south elevation could be reviewed administratively. Emailed the applicant on June 4, 2009 and requested the following changes to the landscape plan: Add the following note to Sheet 4 Landscape Plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." The 4 Viburnum planted in front of the south elevation of the wing closest to the EC will reach a mature height of only 8' -10', which is not sufficient to screen the approximately 20' of blank wall on each bay flanking the central bay with windows. Revise the plantings in front of the south elevation to show trees that have a taller mature height. In the southeast corner of the Phase 1 block, 1 QP and 11 IG are shown on the plan, but do not correspond to any plantings shown on the plan in that area. Either eliminate 1 QP and 11 IG or show to what plants these labels correspond. On the south corner of the south elevation the landscape plan states that there are 5 FG, but only 4 are shown. Also, the plan states that 9 VP are planted in front of the south elevation, but only 4 are shown. Revise the drawing so that the number of plantings corresponds to the label identifying the plantings. The ARB determined at the May 18, 2009 meeting that staff could review the building form and landscaping for the south elevation administratively. Emailed the applicant on June 4, 2009 and requested the following changes to the landscape plan. Date Completed:06/26/2009 Reviewer:Elizabeth Marotta CommDev- Current Development Review Status:Pending Reviews Comments: On hold until preliminary is approved... Preliminary approved 7/8/09 Date Completed:07/22/2009 Reviewer:James Barber Fire Rescue Review Status:No Objection Reviews Comments: Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to field inspectionandverification. Date Completed:07/29/2009 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments: Based on plans revised July 7, 2009. Date Completed:07/24/2009 Reviewer:Max Greene CommDev- Current Development Review Status:No Objection Reviews Comments: Road bonds will be calculated prior to final plat approval. Page: 1.00 County of Albemarle Printed On: Friday, July 31, 2009 1 I F i "111111'„ o ®a tg IRG1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 July 1, 2009 Scott Collins Collins Engineering 800 E. Jefferson Street Charlottesville, VA 22902 RE: Old Trail Village, Blocks 1 & 2 Shared Parking Analysis Dear Mr. Collins: You have provided a parking analysis that supports the provision of 449 parking spaces to serve Blocks 1 & 2 in Old Trail Village. Proposed Block 1 uses include 78 residential units, 20,898 square feet of gross leasable area of restaurant /retail, 20,898 square feet of gross leasable area for office and 7,216 square feet for an athletic facility. Proposed Block 2 includes 10,500 square feet of gross leasable area of office space as well as a facility for the elderly consisting of 40 assisted living beds and 78 congregate care dwelling units and 40 employees. I agree with the conclusion of your Parking Analysis, dated May 5, 2009, that a shared parking arrangement utilizing 449 parking spaces to serve the proposed uses is reasonable. This is based primarily on the difference in peak demand for parking between the office use and the residential, restaurant/ retail & athletic facility uses described below. I also found it to be significant that this is a reduction of 20.5% which is less than the 35% allowed by the ordinance in section 4.12.10.d. The basis for this approval is further explained as follows: 1. The zoning ordinance requires 392 spaces for Block 1 (assuming the shopping center standard for developments containing between 200,001 and 600,000 gross leasable area) and 173 spaces for Block 2 based on section 4.12.6. Block 1 Uses Required Spaces 78 Dwelling Units 156 20,898 s.f. Restaurant/ Retail- 4.5/1000 s.f.94 20,898 s.f. Office- 1/200 net s.f.84 7216 s.f. Athletic Facility- 1/125 s.f.58 Total 392 Scott Collins July 1, 2009 Page 2 Block 2 Uses Required Spaces 10,500 s.f. Office- 1/200 net s.f.42 78 Congregate Care Units- 1 /unit 78 40 Assisted living beds- 1/3 beds 13 40 Employees-1 /emp.40 Total Required 173 Total required spaces per zoning ordinance for Block 1 & 2 = 565 Total provided spaces on Blocks 1 & 2.449 Deficit 116 Percentage of reduction 20.5% This calculation does not include a reduction of required parking based on sharing between staff and congregate care residential units. 2. Your analysis, based on ULI figures, indicates that Block 1 will experience an overall maximum parking demand of 424 spaces and that Block 2 will require 107 spaces. This results in a deficit of 82 spaces with the provision of 449 spaces. The percentage of this reduction is 15 %. 3. It is recognized that the residential, restaurant/retail and athletic facility all share a peak demand around 6 P.M. (Block 1) However, this is off set by the office use that experiences a different peak time. 4. As Old Trail Village has been developed as a pedestrian friendly neighborhood, it is anticipated that many of the patrons of the village and residents of the neighborhood will consider walking, as well as other modes, as a reasonable mode of transportation. 5. The pool in Block 3 is not adjacent to Blocks 1 & 2. It is not factored into this determination. At this time, the additional parking that would be provided by Block 3 will not be necessary, but it is recognized that there are future shared parking opportunities in Block 3. In the event that parking issues become evident in Old Trail Village later, available parking opportunities within Block 3 may be explored during the course of future development. Please cont_ you have questions. Sin • - i 1 j, Ronald L. Higgins, AICP Chief of Zoning CALg," l4" II o . County of Albemarle Department of Community Development Memorandum To:Scott Collins (scoff @collins - engineering.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date:July 30, 2009 Subject: SDP2009 -045- Old Trail Block 2- Final Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and Block 2 for review and approval from the County Attorney as specified in section 4.12.8 e). The final site plan will not be signed until this instrument has been received and approved. If the site plan is not signed within 6 months, we will acquire this instrument through other means. 2. Shared Parking Agreement] On sheet S -1 the note stating that Phase II will remain as a level grass field for parking for Block 1 is not acceptable. Since Block 1 and 2 are sharing parking, and Block 1 needs the parking that is shown in Phase II, the parking must be built otherwise the percentage of shared parking will exceed the percentage that was approved. 3. 32.6.6 (j)] On the lighting plan, provide the LLF in the chart. The LLF needs to be 1.0. Revise the photometric plan if LLF used was less than 1.0. 4. 32.6.6 (j)] On the lighting plan, provide the lumens for the light fixtures in the chart. 5. 32.6.6 (j)] On the lighting plan, provide the mounting height for the fixtures in the chart. 6. 32.6.6 (j)] Show the light fixtures on the landscape and site plan to ensure that there are no conflicts with the landscaping or utilities. 7. 32.7.9.8 (c)(3)] Provide screening per this section for the dumpsters, loading area and generator. 8. Shared Parking Agreement] The parking information on sheet T -2 does not match the approved letter from Ron Higgins date 7/1/2009. Revised to be the correct information. 9. The percentage of Affordable total units does not appear to be correct in the chart on sheet T -2. Please check the numbers and confirm. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 1 SAM -7S7 r I County of Albemarle Department of Community Development Memorandum To:Scott Collins (scott @collins - engineering.com) From: Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date:July 31, 2009 Subject: SDP2009 -045- Old Trail Block 2- Final Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and V4, Block 2 for review and approval from the County Attorney as specified in section 4.12.8 t-_e). The final site plan will not be signed until this instrument has been received and T*. S 1, et approved. If the site plan is not signed within 6 months, we will acquire this instrument f through other means. Ad 2. Shared Parking Agreement] On sheet S -1 the note stating that Phase II will remain as a level grass field for parking for Block 1 is not acceptable. Since Block 1 and 2 are sharing parking, and Block 1 needs the parking that is shown in Phase II, the parking must be built otherwise the gercentagp of shared parking will exc d t e ee centage that was approved. -et I elc i U." Np'f r, ed. , , 32.6.6 (j)] On the lighting pla the LLF In the chart. The LLF needs to be 1.0. evise the photometric plan if LLF used was less than 1.0. 32.6.6 (j)] On the lighting plan, provide the lumens for the light fixtures in the chart. 32.6.6 (j)] On the lighting plan, provide the mounting height for the fixtures in the chart. 6!" [32.6.6 (j)] Show the light fixtures on the landscape and site plan to ensure that there are no conflicts with the landscaping or utilities. 32.7.9.8 (c)(3)] Provide screening per this section for the dumpsters, loading area and it i ,,,,, generator. Shared Parking Agreement] The parking information on sheet T -2 does not match the 0 , 0 ,.k(ot -approved letter from Ron Higgins date 7/1/2009. Revised to be the correct information.A The percentage of Affordable total units does not appear to be correct in the chart on sheet T -2. Please check the numbers and confirm. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. NU; 6' ¢ I Q Ji 46 Ctivre e.((r'"V Sjc 1 soe zrigzsg Albemarle County 04 -7s Service Authrity Serving Conserving August 29, 2011 Collins Engineering Attn: Mr. Scott Collins, P.E. 200 Garrett Street, Suite K Charlottesville, Virginia 22902 Re: Old Trail Village Block 2 Dear Mr. Collins: The plan, entitled "Old Trail Phase VIII Block 2 Final Site Plan, Erosion Control & Stormwater Management Plan" dated July 7, 2009, last revised August 14, 2011, is hereby approved for construction. One set of the approved plan is enclosed for your records. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority ACSA) and does not relieve the contractor from responsibility for his work as it relates to the plan and specifications. The ACSA requires that a copy of the approved construction plan be on the job site. The contractor is responsible for marking up a copy of the approved construction plan showing as -built information and providing this data to your client at the completion of utility installation. The final as -built plan shall be submitted in a format of one paper copy and one mylar copy. A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project, materials, test methods and schedule, in order to expedite construction. Please have the proper party call me at 977 -4511 to schedule the meeting. This approval is valid for a period of 18 months from this date. If construction is not in progress at the end of this time period, the approval shall be void. The pressure for water may exceed 80 psi at some meter locations. 168 Spotnap Road • Charlottesville, VA 22911 Tel (434) 977-4511 Fax (434) 979 -0698 www.serviceauthority.org If you have any questions or if we can be of assistance, please give us a call at (434) 977 -4511. Sincerely, Jeremy M. Lynn, P.E. Senior Civil Engineer JML /dbh cc: Beights Development Corporation State Health Department Va. DEQ I" , Current Development, Bill Fritz Bldg Codes & Zoning Services Soil Erosion Inspector 050601 Ol dTrai !VillageB!k2EngineerLtr082911 AAL 1'1111 - P8i.tW r IkG \P County of Albemarle Department of Community Development Memorandum To:Scott Collins (scott @collins- engineering.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date:July 31, 2009 Revl: September 15, 2009 Subject: SDP2009 -045- Old Trail Block 2- Final Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and Block 2 for review and approval from the County Attorney as specified in section 4.12.8 P'e). The final site plan will not be signed until this instrument has been received and approved. If the site plan is not signed within 6 months, we will acquire this instrument through other means. Revl: The instrument needs to be submitted to the county for review and approval 1 from the County Attorney. Shared Parking Agreement] On sheet S -1 the note stating that Phase II will remain as aak,tx level grass field for parking for Block 1 is not acceptable. Since Block 1 and 2 are sharing I parking, and Block 1 needs the parking that is shown in Phase II, the parking must be built otherwise the percentage of shared parking will exceed the percentage that was approved. Revl: In your response letter you state that "the parking between Block 1, phase 1 and Block 2, phase 1 is more than adequate for the initial phases of these two blocks ", if this is the case you need to break out the parking per phase in the required parking chart to show how it is being met. It appears that the parking for Phase 2 in Block 2 is needed, since the temporary parking lot was located there. Could you just put the building in Phase 2 and include the parking in Phase 1? 1 Shared Parking Agreement] The parking information on sheet T -2 does not match the approved letter from Ron Higgins date 7/1/2009. Revised to be the correct information. Revl: This still is not correct. See attached approval letter. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 2 SDP -2009 -00045 Old Trail Pb -se 8 block2 -final Page 1 of 1 Megan Yaniglos From: DeNunzio, Joel D., P.E. [ Joe I.DeNunzio ©VDOT.virginia.gov] Sent: Thursday, October 15, 2009 2:03 PM To:Megan Yaniglos Cc:Amy Pflaum Subject: SDP - 2009 -00045 Old Trail Phase 8 block2 -final SDP - 2009 -00045 Old Trail Phase 8 block2 -final Megan, I have reviewed the above site plan and have the following comments: 1. Entrance profiles in accordance with the CG -11 standard need to be shown on the plan 2. Street trees should not be within 30 feet of any corners in accordance with VDOT's Road Design Manual appendix B 3. Sight distances for a 25 mph road are 280 feet. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 -293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov 10/16/2009