DATE: May 15 2009
Frank Pohl
Timmons Group
919 2 Street S.E
Charlottesville, VA, 22902.
RE: SDP - 2009 -00044 ACVMF Major Site Plan Amendment.
Dear Sir,
The Site Review Committee has reviewed the development proposal referenced above. Preliminary
comments for the following divisions of the Department of Community Development and other agencies,
as applicable, are attached:
Albemarle County Division of Zoning & Current Development (Planner)
Albemarle County Division of Zoning & Current Development (Engineer)
Albemarle County Division of Planning (ARB Planner)
Albemarle County Division of Inspections (Building Official)
Virginia Department of Transportation (VDOT).
Albemarle County Service Authority (ACSA).
Albemarle County Geographic and Data Services (GDS)
Albemarle County Fire and Rescue
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that
could affect approval of the proposed project.
Please make the revisions that have been identified as necessary for preliminary approval by the Site
Review Committee. If you choose not to make the requested revisions, please submit in writing
justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17"
copy to the Department of Community Development including responses to each of the attached
comments of the Site Review Committee by Monday, June 29 2009. Failure to submit this information
by this date will result in suspension of the review schedule. Review will resume when revisions are
submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you
have questions or require additional information.
Sincerely,
all AIR41/11/
Gerald Gatobu, Principal Planner
County of Albemarle
Department of Community Development
Current Development
401 McIntire Road
Charlottesville, VA 22902 -4596
Phone: (434)296 -5832 Ext 3385
Fax: (434)972-4126
pF.4LQ
t IRGIIZ
County of Albemarle
Department of Community Development
Memorandum
To:Frank Pohl
From:Gerald Gatobu, Principal Planner
Division: Zoning and Current Development
Date:June 16, 2009
Subject: SDP2009 -00044 ACVMF Major Site Plan Amendment
The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of
the major site plan amendment referred to above once the following comments have been addressed: [Each
comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless
otherwise specified.]
32.5.6 The preliminary site plan shall contain the following information:
a. The name of the development; Please add SDP200900044, [site plan number] to the site plan for
current and future reference.
Zoning; descriptions of all variances, zoning proffers and bonus factors applicable to the site; there was
a special use permit approved SP1979 -057 approved 8/15/1979 for a wastewater lift station on this
tax map and parcel (60 -78A).
Owner, zoning, tax map and parcel number and present use of adjacent parcels; Please add the owner,
tax map and parcel number, and present use of adjacent parcels to the site plan.
Departing lot lines; Add departing lot lines to delineate adjacent properties
b. Written schedules or data as necessary to demonstrate that the site can accommodate the proposed use,
including:
Maximum number of employees; Add the maximum number of employees to be working at the
vehicle maintenance facility to the site plan.
n. Location and dimensions of all existing and proposed improvements including:
Outdoor lighting: Show /delineate proposed and existing outdoor lighting.
1
Service Authirity
TO: Gerald Gatobu
FROM: Gary Whelan, Civil Engineer
DATE: June 4, 2009
RE: Site Plan Technical Review for: Albemarle County Vehicle Maintenance Facility
SDP200900044
TM 60 -78A
The below checked items apply to this site.
X 1. This site plan is within the Authority's jurisdictional area for:
X A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
X 2. A 6 inch water line is located on site.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
X 4. An 8 inch sewer line is located on site.
5. An Industrial Waste Ordinance survey form must be completed.
X 6. No improvements or obstructions shall be placed within existing or future
easements.
7.and plans are currently under review.
8.and plans have been received and approved.
X 9. No plans are required.
10. Final and plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
13. City of Charlottesville approval for sewer.
Comments:
The site plan does not show or incorrectly shows:
meter locations water line size
waterline locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthoriy.org
Application #: j SDP200900044 v Short Review Comnrents
Project Name: Albemarle County Vehicle Maintenance Facility - Major Major Amendment
Date Completed:
Reviewer:
Review Status:
Reviews Comments:
Date Completed:06/09/2009
Reviewer:Andrew Slack E911
Review Status:No Objection
Reviews Comments: NO OBJECTION.
Date Completed:06/15/2009
Reviewer:Gerald Gatobu CommDev- Current Development
Review Status:Pending
Reviews Comments: Critical Slope Waiver Request from Frank Polh Timmons Group
Date Completed:06/10/2009
Reviewer:James Barber Fire Rescue
Review Status:No Objection
Reviews Comments: Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to field inspection
and verification.
Date Completed:06/03/2009
Reviewer:Margaret Maliszewski ARB
Review Status:No Objection
Reviews Comments: 'The proposed development is not expected to be visible from the Entrance Corridor. Therefore, ARB
review /approval is not required.
Page: 1.00 County of Albemarle Printed On: Tuesday, June 16, 2009
Application #:SDP200900044 Short Review Comri nts
Project Name: Albemarle County Vehicle Maintenance Facility - Major Major Amendment
Date Completed:06/09/2009
Reviewer:Andrew Slack E911
Review Status:No Objection
Reviews Comments: NO OBJECTION.
Date Completed:06/15/2009
Reviewer:Gerald Gatobu CommDev- Current Development
Review Status:No Objection
Reviews Comments: 1Critical Slope Waiver Request from Frank Polh- Timmons Group
Date Completed:06/10/2009
Reviewer:James Barber Fire Rescue
Review Status:No Objection
Reviews Comments: Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to field inspection
and verification.
Date Completed:07/02/2009
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments:
Date Completed:07/08/2009
Reviewer:Max Greene CommDev- Current Development
Review Status:Administrative Approval
Reviews Comments: Approved as submitted. No Bonds required for County Projects.
Date Completed:06/03/2009
Reviewer:Margaret Maliszewski ARB
Review Status:No Objection
Reviews Comments: The proposed development is not expected to be visible from the Entrance Corridor. Therefore, ARB
review /approval is not required.
Page: 1.00 County of Albemarle Printed On: Wednesday, July 08, 2009
of a
Ivlll? v,
erfm
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:Albemarle County Vehicle Maintenance Facility - Major Amendment
Plan preparer:Timmons Group fax 295 -8317]
Owner or rep.:County of Albemarle fax 975-9341]
Plan received date: 26 May 2009
Date of comments: 5 June 2009
Reviewer:Max Greene
The plans for Albemarle County Vehicle Maintenance Facility - Major Amendment submitted on
26 May 2009 have received Engineering review. The plans may be approved after the following
items from the Albemarle County Design Manual Check list have been adequately addressed:
A. Site and drainage plans (SDP200900044)
1. Existing site conditions requires the following information added:
a. Date and source of the topographic information: All topography should be at least
visually field verified by the designer within the last year [18- 32.6.6, 14 -302,
Policy for date]
b. Benchmark location, elevation and datum for topography. An existing utility or
other known position will suffice. [Policy]
2. Please have all edges of existing and proposed pavement labeled (where there is no
curbing)
3. Labels on all drainage structures provided (and should match the drainage computations
and profiles)
4. Please include typical sections for proposed channels with locations referenced from the
plan view sheets.
5. Drainage profiles: (applicable to site plans, road and drainage plans) [14 -311, 18 -32]
drainage profiles for each pipe, structure or channel must contain:
a. existing ground
b. proposed ground
c. any channel linings
d. a label on each structure to correspond with the computations
e. material and strength class or gage of each pipe
f. pipe slopes at 0.5% min. to 16% max. (per VDOT stnds for anchors over 16 %)
g. all invert elevations for each structure (with positive flow drop between inverts).
h. scour outlet protection at all outlets, corresponding to computations
i. There are no excessive outlet velocities (> 15fps)
j. All proposed systems are designed within open channel full flow capacities.
k. ditch linings specified per plans meet velocity requirements
1. headwaters < 1.5 x culvert height, and 18" below shoulder elevation of streets.
m. dimensions and stone sizes for all outfalls
n. limits of all areas and sub -areas draining to proposed structures, and existing
structures or channels which will be impacted
Engineering Review Comments
Page 2 of 3
o. acreage of each drainage area as used in computations
p. hydrologic coefficient for each drainage area as used in the computations
q. time of concentration for each drainage area as used in the computations
r. destination structure labeled for each drainage area
B. Stormwater Management and Mitigation Plan (WPO200900025)
1. Cross - section details of each facility including;
a. embankments (between 3 and 25 ft in height)
b. top width 8ft min., 10' for heights 15' to 20', 12' for dams over 20', heights
measured from the outside toe
c. upstream face slope 2:1 or flatter, labeled
d. downstream slope 3:1 or flatter, labeled
e. 10yr and 100yr high water elevations labeled with 1 ft freeboard for 100yr storm
with emergency spillway or 2 ft freeboard without emergency spillway
f. an impervious core
g. a cutoff trench of minimum 4' wide, 4' deep and 1:1 sloped sides
h. principle spillway
i. riser crest 1' below emergency spillway if present
j. riser crest stays within weir flow control during the 10yr storm
k. trash racks over all inlets and controls to prevent clogging
1. trash rack over riser crest is not flat (no DI -7's)
m. riser size and materials labeled
n. barrel size, strength, material, inverts and slope labeled
o. all orifices, weirs or other control devices labeled with dimensions and inverts
p. control orifices not more than 25% of riser perimeter at any point (does not affect
riser structural integrity, 25% is a target)
q. riser base size and dimensions labeled
r. access to riser is provided (riser should be in dam, not free - standing)
s. emergency spillway dimensioned and labeled
t. invert labeled
u. dimensions in control section
v. dimensions in channel section provided if different than control section
w. linings labeled and shown where applicable
x. spillway over native soils, and /or sufficient armoring provided
y. sediment forebays provided for all retention basins, constructed wetlands, and
basin biofilters at all inlets
z. sized to 0.25" of runoff per impervious acre (can be included in WQV)
aa. direct vehicle access provided
i. access graded to 10' width and less than 20% grade
ii. minimum 10' wide permanent easement over access
iii. Albemarle County
iv. gravel surface or better for grades over 10%
2. Please provide as -built data for existing pond and drainage structure and facilities
3. Existing ponds and drainage structures and facilities will be brought up to current
standards.
C. Erosion Control Plan (WPO200900025)
Narrative:
1. Please state the acres to be disturbed in the narrative. Even though no fee is being charged
the County is required to keep a total acreage of annual disturbed area.
Engineering Review Comments
Page 3 of 3
2. Existing site conditions will follow the State Erosion and Sediment Control Handbook
requirements for descriptions. [VESCH page VI -2 and VI -24] The existing basin has
major erosion that will need to be repaired with this plan.
3. Please provide a soils description in the narrative and show the soil boundaries on the plan
sheet.
4. Stormwater runoff consideration appears to be missing from the narrative.
5. Sediment basin "design computations" are missing from the narrative.
6. The existing basin is in bad repair and has significant erosion from the existing outlet
structure. MS -19 analysis is required.
Plan sheet:
1. Show dust control symbol (DC).
2. Show Temporary Seeding (TC).
3. Show Permanent Seeding (PS).
4. Show existing soils boundaries.
5. Basin construction details are required.
Once these comments have been addressed. please submit 2 copies of the revised plans, calculations, and
narratives to Current Development Engineering. Due to the required additions and information required,
additional comments and /or corrections may be required.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Max Greene at 434 -296 -5832 ext. 3283 or email mgreene@albemarle.org to
schedule an appointment.