Loading...
HomeMy WebLinkAboutSDP200900043 Approval - County 2009-07-21MB ' mak COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 July 21, 2009 Michele C. Wright 102 Trout Lily Drive Covington, VA 24426 RE: SDP - 200900043 Red Lobster- Preliminary Dear Madam: The Department of Community Development hereby grants conditional approval to the above referenced preliminary site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on July 21, 2010. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division/agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: 1 Zoning & Current Development approval to include: 1. 32.5.6.p] COMMENT: Because trees and shrubs are to remain on the site, a Conservation Checklist is required to be completed and signed and provided on the landscape plan. I see that it has been added to the plans and is signed, but it must be completed as well. 2. 4.1.2.6] COMMENT: Thank you for providing mall parking figures. Please be aware that even though there is a note that the figures were provided by the landlord, we will hold it to whomever certifies the plans that the information is correct. We encourage you to confirm that the existing and proposed mall parking is correct. 3. 4.1.2.6] COMMENT: Please clarify the Required parking note provided on Sheet C1.2 in the Zoning /parking box. It references the required parking is to be determined ". I assume this is because the building plans have not been finalized, however we require this information before approval of the plan. If necessary, you can propose a number of parking spaces based on the maximum building square footage and then amend the final numbers prior to final site plan approval. 4. 4.2] COMMENT: The critical slopes waiver request is being administratively approved; documentation of this approval will be provided under a separate cover. 5. 32.5.6.a] COMMENT: Pursuant to providing a 10' reserved strip for land along Rio Road (See VDOT and Engineering comments for more), please also adjust the parking and building setback to be calculated from the edge of the 10' reservation. Please contact Elizabeth Marotta at 296 -5832 if you have questions or require additional information. Enyineerina approval to include: 1. Address comments dated July 8, 2009. (Attached) Please contact Phil Custer at 296 -5832 if you have questions or require additional information. Fire & Rescue approval 1. Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to field inspection and verification. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: 1. Address comments of June 16, 2009 letter. (Attached) Please contact Joel DeNunzio, PE at 293 -0011 if you have questions or require additional information. ARB approval: Please contact Eryn Brennan at 296 -5832 if you have questions or require additional information. Inspections Division approval: Please contact Jay Schlothauer at 296 -5832 if you have questions or require additional information. E911 approval: 1. The address will be given off of Rio Road East provided the existing access for Rio Road remains open. Please contact Andrew Slack at 296 -5832 if you have questions or require additional information. Sincerely, Elizabeth M. Marotta, Senior Planner Zoning & Current Development File: SDP - 200900043 Cc: Shopping Center Associates c/o Simon Debartollo Group GMRI, Inc. a Florida Corporation r : r4c541 cqOY+u2 WQS i 56td.Cet. 5 /27 /oef 3