Loading...
HomeMy WebLinkAboutSDP200900033 Review Comments 2009-05-20ALof6 s vi 9; V. " r 7RGINw' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 May 20, 2009 To: Scott Collins; Collins Engineering via email: scott@collins-engineering.com CC: Kirsten Munz; Collins Engineering via email: kirstenPcollins- engineering.com RE: SDP2009 -33 University Village Retirement Community (Phase 1) - Final Dear Sir: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Planning (E911) Albemarle County Division of Planning (Architectural Review Board) Albemarle County Division of Planning (Historic Preservation) Albemarle County Division of Planning (Water Protection) Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Health Virginia Department of Transportation Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11” x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by June 1, 2009. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Summer Frederick Senior Planner Zoning & Current Development Application #:SDP200900033 1Short Review Comr ntS Project Name:University Village Retirement Community (Phase 1) -Final j Final - Residential - Commission Date Completed:05/11/2009 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments: THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF THREE (3) POTENTIAL ROAD NAMES TO REPLACE "UNIVERSITY VILLAGE ROAD" AND "UNIVERSITY VILLAGE CIRCLE." Date Completed:05/04/2009 Reviewer:James Barber Fire Rescue Review Status:Requested Changes Reviews Comments: f Please indicate the location of fire hydrants. A hydrant must be located within 400 feet of all portions of a structure by way of a prepared travel way. Please indicate estimated (calculated) fire flow. Date Completed:05/04/2009 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Based on plans dated April 27, 2009. The building code only requires one barrier -free parking space for this phase (15 attached condominium units). This one space must be van - accessible and must be located in one of the garage buildings. Page: 1.00 County of Albemarle Printed On: Wednesday, May 20, 2009 j y g'"Trdbi 111747 Serv Auth‘rity TO: Summer Frederick FROM: Gary Whelan, Civil Engineer DATE: May 11, 2009 RE: Site Plan Technical Review for: University Village Retirement Community SDP200900033 TM 33-1D The below checked items apply to this site. X 1. This site plan is not within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service 2. A 12 inch water line is located approximately 2,500 distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. An 8 inch sewer line is located approximately 750'distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. 9. No plans are required. X 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. X 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Provide a phasing plan and projected flows. RWSA capacity certification may be required. Complete dedication of NGIC Expansion Phase 1 & 2. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org Co- AL & c, RGINIe' County of Albemarle Department of Community Development To:Scott Collins; Collins Engineering via email: scott@col/ins - engineering.com From: Summer Frederick, Senior Planner Division: Current Development Date:May 18, 2009 Subject: SDP2009 -33 University Village Retirement Community (Phase 1) - Final The Planner for the Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Please note the referenced project has been reviewed for compliance with the 1980 County Ordinance. 1. Sec. 32.3.1(b)] Please provide accurate boundary lines for the subject parcel in entirety. 2. Sec. 32.3.1(b)] The stream buffer, creek course, and floodplain boundaries must be clearly designated. Please make sure the arrows for this information are legible. 3. [Sec. 30.3.5.2.1] Any water - related use, such as a bridge or a culvert to be located within a floodway requires a special use permit. 4. Sec. 8.5.6.1] Please provide supporting calculations to confirm that 10% or greater of the project and area is shown on the submitted final site plan. 5. Sec. 8.5.6.3] Please remove the Potential Future road alignments. These are not shown on the approved application plan. If these road alignments are desired, a variation must be applied for, and approved by the Director of Planning. Please contact Summer Frederick at the Department of Community Development 296- 5832 ext. 3565 for further information. 1 EIRGII COUNTY OF ALBEMARLE Department of Community Development 401 Mclntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:University Village, Phase 1; SDP - 2009 - 00033, WPO- 2009 -00020 Plan preparer:Mr. Scott Collins; Collins Engineering Owner or rep.:Next Generation, LLC Plan received date: 27 April 2009 Date of comments: 19 May 2009 Reviewer:Phil Custer The final site and road plans for Phase 1 of the University Village Retirement Community project, received on 27 April 2009, have received engineering review. The applicant has requested that the site plan be reviewed under the Zoning Ordinance at the time of the rezoning approval (ZMA- 1977 -019). A separate letter will be sent out at a later date with comments regarding the Erosion and Sediment Control and Stormwater Management Plans. A. Final Site Plan [SDP 2009 - 00033] 1. Please show the benchmark in the plan set. [32.4.35] 2. The road crossing will require fill in the floodplain and, therefore, a special use permit will be necessary. A site plan can not be approved for this project without the SP for fill in the floodplain. 30.3] 3. All handicap parking spaces must be 12ft wide. [4.12.6.5] 4. The site plan shows disturbance to an undisturbed buffer on the rezoned commercial portion of the property for the construction of a sewer line. Please request a waiver of this buffer and it will be taken to the Planning Commission. 5. Please move the parking spaces and garages farther south so that the sidewalk along the road can not be blocked by parked cars. 6. The pipe systems on the site plan sheets (S) and drainage plan sheets (DP) show different alignment and networks. Please correct. 7. A drainage structure is needed on University Lane across from structure 50. 8. Please call out a VDOT Safety Slab for structure 1B. 9. Please provide VDOT Inlet Shaping on all inlets where flow drops 4ft (either from a pipe or from the surface). 10. On -grade curb inlet calculations appear to be incorrect. For every inlet, a longitudinal slope of 0.5% is used for the computation. 11. The site plan cannot be approved until all elements of the WPO plan are approved. Comments regarding the ESC and SWM plans will be given in a separate letter. 12. This project is located outside the jurisdictional area for public water and sewer service but within the development area boundary. The jurisdictional area is currently being updated by the Planning Department. B. Road Plan [WPO 2009 - 00020] 1. VDOT approval is required. 2. A road bond must be posted prior to approval of the site plan. The applicant must provide an item by item breakdown from a contractor for the construction of all public improvements. This cost Current Development Engineering Review Comments Page 2 of 2 estimate will be subject to the review of the County Engineer. [32.5.2] 3. The radius of the cul -de -sac must be a minimum of 50ft. [32.5.9] 4. The pavement section details do not match for all roads between the individual detail and summary table and the road cross section detail. 5. Please reduce the cut and fill for the roadway between Sta. 19 +00 and Sta. 28 +00 so that critical slope disturbance is minimized. A waiver for critical slope disturbance will be required in areas where critical slopes disturbance could be reasonably avoided if the start of the fill or cut was brought closer to the right -of -way. 6. The crossing of the perennial stream must be designed at this time, preferably, in conjunction with the review of a Special Use Permit. The crossing should be designed so that the plan is in conformity with the approved rezoning plan: a lake should be created with the roadway fill unless a variation is given by the Director of Planning. Future comments may be required on the road plan due to changes necessary to meet crossing requirements. 7. University Village Circle and University Village Lane will likely have to be private roads due to VDOT's current road acceptance requirements. The loop road was also called out as private in the application plan. 8. The width of University Village Circle is called out as 24ft width in plan view and a 28ft width in the section. Please correct. Either section is permissible. Please also provide the standard 6ft planting strip and 5ft sidewalk section for University Village Circle. 9. Please provide centerline radii for all roads on sheets R -1, R -2, and R -3. 10. Please show easements on all pipes and culverts from VDOT ROW. Easement widths must meet the standard described in the latest edition of the design manual. [32.5.12] 11. Please do not show in this plan set the possible future ROW for Boulders Road Extension or the possible realignment of University Village Drive. 1 FF ii•;y$i.: COMMONWEALTH of y" I T IA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER May 20` 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments May 21 2009 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the May 21 2009 Site Review Committee Meeting: SDP - 2006 - 00041 Briarwood Phase 1A - 1, 1B - 1, 8 (Elizabeth Marotta) 1. Engineering comments were provided by VDOT on 4 -23 -09 for the additional phase of the project. SDP - 2009 - 00030 Forest Lakes Office Park - Maior (Summer Frederick) 1. No comments SDP - 2009 - 00031 Collins Medical Center - Preliminary (Gerald Gatobu) 1. Final plans need to show the proposed entrance profile. 2. Final plan needs to show details for CG -6, CG -11, and CG -12B and detectable warning. 3. A Land Use Permit will be required for construction within the public road right of way. SDP - 2009 -00033 University Village Retirement Communitv(Phase I) Summer Frederick 1. The proposed connection to Route 29 needs to be a minimum of 510 feet from the existing intersection or line up with the intersection at the signal. tj (-A 1 \ C) 1 E KEEP VIRGINIA MOVING 2. This site plan exceeds the threshold to require a Chapter 527 Traffic Impact Analysis. 3. The proposed road must provide a connection to the existing Boulders Road to meet the connectivity requirements of SSAR's, 24VAC 30 -92. Without the connection the road may not be eligible for acceptance into the State Secondary System of Highways. 4. The CG -12 detail needs to be updated and show the proper detectable warning. 5. The proposed Functional Classification needs to be indicated on the plan. 6. If the connection is made to Boulders Road, additional traffic will need to be shown to properly determine the design speed and pavement structural section of the road. 7. Provide the horizontal alignment data on the roads. 8. Street design data on sheet R -4 lists University Village Road but the plans show University Village Dr. Is this the same road? 9. The sight distance on University Village Dr. / Rd. need to be based on the correct design speed on the road. 10. Pavement design on University Village Dr. needs to be designed in accordance with the AASHTO method if this is designed as a collector road. 11. Storm sewer pipes need to be as perpendicular as possible to the centerline of the road and cannot exceed 4.5 degrees. 12. Street Trees on University Village Dr. need to be located outside of the clear zone of the road if this road is to be classified as a collector. SDP - 2009 -00034 Martha Jefferson Outpatient Care Center (Proffitt -Major (Gerald Gatobu) 1. It appears that the parking and detention facility for this site is in conflict with a previous plan for the widening of Proffit Road and the construction of a roundabout at this intersection. The road plan indicates that there has been a dedication of right of way for the road widening and intersection improvement. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434- 293 -0011 WE KEEP VIRGINIA MOVING gfRoci— 55 OF AL/ 4p IFjGIN COUNTY OF ALBEMARLE Department of Community Development 401 Mclntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 19, 2009 Scott Collins Collins Engineering 800 E. Jefferson St. Charlottesville, VA 22902 RE: Request dated August 6, 2009 regarding a variation in the site development plan from the approved application plan for the University Village Retirement Community (ZMA -77- 19) Dear Mr. Collins: The County has received your variation request referenced above. You propose "to modify the alignment of the entrance road such that it can connect to the existing Boulders Road located to the south" and a stub out of Boulders Road Extension to the west that would allow it to ultimately be extended to U.S. 29 in accordance with concepts that have been recommended as part of the proposed Places 29 Master Plan. This proposal varies from the road design and location shown on the approved application plan which provided access from U.S. 29 in a location different than proposed in Places 29 and a stub out of the road to the south in a location that would be offset from the existing Boulders Road. This change will also result in a modification of the application plan for the location of the entrance road to University Village and the location of two residential clusters within University Village. This letter serves to provide approval to the variation in keeping with the depictions on SDP 2009 -033 University Village Retirement Community (Phase 1) -Final and the attached application. The analysis of the variation request is provided below: Section 8.5.6.3 of the 1980 Zoning Ordinance under which this project is being reviewed allows the Director of Planning to grant a finding that such variations are: Generally in keeping with the spirit and concept of the approved Application Plans; Yes; the proposed road location provides opportunity for future connection to U.S. 29 and interconnection to property to the south (via Boulders Road). The location of the entrance road to University Village and the layout of buildings in University Village remain in keeping with the intent of the original application plan. in accordance with the Comprehensive Plan; Yes; the proposal continues to provide for desired transportation features and development consistent with the project's location in a designated growth area in the Comprehensive Plan. Furthermore, it is consistent with concepts that have been recommended as part of the proposed Places 29 Master Plan which will be an amendment to the Comprehensive Plan. and in accordance with regulations currently in effect. Yes; site plan review of the changes necessitating this variation will assure compliance with applicable regulations. If you have any questions or need additional information, please contact me at 296- 5832(ext 3254). Sincerely, V. Waynq Cilimberg Director of Planning Cc: Summer Frederick Judy Wiegand