HomeMy WebLinkAboutSDP200900081 Review Comments 2009-10-06Page 1 of 1
Elizabeth Marotta
From: Glenn Brooks
Sent: Tuesday, October 06, 2009 10:04 AM
To: Ray Lilly
Cc: Elizabeth Marotta; Amy Pflaum
Subject: Waldorf School field changes
Ray,
Waldorf school has a site plan amendment currently in process. Elizabeth is working on it. I took a look at it, and
it does not show the trees which are designated as to be saved on the erosion control plan. Neither does it show
the extra graded area adjacent to the basketball court. However, it appears as though these would be approvable
changes, so please let them know in your notice -to- comply letter that their site plan amendment and their erosion
control plan needed to be updated for the new area, and to remove the missing trees.
Thanks,
Glenn Brooks, P.E.
County Engineer
Albemarle County
10/6/2009
Application #: I SDP2009000b°r 7Short Review Con- nnents
Project Name: ICharlottesville Waldorf School - Minor Minor Amendment
Date Completed: 10/14/2
Reviewer: Elizabeth Ma CommDev- Current Development
Review Status: No Obi n
Reviews Comments: or
Date Completed:
Reviewer:
Review Status:
Reviews Comments:
Date Completed:
Reviewer:
Review Status:
Reviews Comments:
Date Completed:
Reviewer:
Review Status:
Reviews Comments:
10/28/2009
Elizabeth Marotta CommDev- Current Development
No Objection
omments:
1. Signature set provides SDP200900081 on cover sheet (remove XXXX's)
Signature set removes random arches from over /under "Legend /Abbreviations"
3. Must obtain Engineering Zoning /CEO and ACSA approval prior to final approval.
10/22/2009
James Barber Fire Rescue
No Objection
Oust comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to field
nspection and verification.
10/22/2009
Jay Schlothauer Inspections
No Objection
3ased on plans revised October 19, 2009.
Vo comments or conditions.
Date Completed:
Reviewer: Jay Schl
Review Status: No Obje
Reviews Comments: Ba
0
Inspections
plans revised September 25, 2009.
comments or conditions
Page: 1.00 County of Albemarle Printed On: Wednesday, October 28, 2009
SDP200900081 Waldorf S , ' Aol Minor Amendment
Elizabeth Marotta
Page 1 of 1
From: Eugene Ryang [eryang @waterstreetstudio.net]
Sent: Tuesday, October 13, 2009 12:40 PM ,
To: Elizabeth Marotta
Subject: RE: SDP200900081 Waldorf School Minor Amendment
Hi Elizabeth, !1
We will be submitting some additional information (including water line revisions) to the MSPA
submittal either this Friday (10.16) or next Monday (10.19).
Thanks,
Eugene
eugene ryang, CLA
w terstreetstudio
111 tra;
From: Elizabeth Marotta [mailto:emarotta @albemarle.org]
Sent: Tuesday, October 13, 2009 12:14 PM
To: Eugene Ryang
Subject: FW: SDP200900081 Waldorf School Minor Amendment
Eugene,
Please forward me a pdf of the proposed waldorf amendment.
Thank you,
Elizabeth
From: Gary Whelan [ mailto :gwhelan @serviceauthority.org]
Sent: Tuesday, October 13, 2009 11:53 AM
To: Elizabeth Marotta
Subject: SDP200900081 Waldorf School Minor Amendment
Elizabeth,
Have the applicant provide the ACSA the water line revisions as a pdf to me. I'll compare them to the
approved plans to see if resubmission is necessary. Make sure that they indicate the revisions clearly with
cloud lines.
Thanks.
Gary
10/28/2009
Elizabeth Marotta
From:Elizabeth Marotta
Sent:Monday, November 23, 2009 8:54 AM
To:Andrew Kellerman
Subject:FW: Waldorf MSPA
Andy,
FYI, see below. A copy will be in the file for your reference, but I don't suppose it hurts for me to send you a heads up!
Thanks, Elizabeth
From: Gary Whelan [ mailto :gwhelan @serviceauthority.org]
Sent: Friday, November 20, 2009 8:41 AM
To: Elizabeth Marotta
Cc: rumberger @wwassociates.net
Subject: Waldorf MSPA
Elizabeth,
The ACSA takes no exception to the Waldorf School Amendment Plan and it is approved. Please notify the ACSA of any
activity in or near our easements or pipes so that one of our inspectors can be present. If there is an additional
preconstruction meeting, we would like to be included.
Gary
Elizabeth Marotta
From:John Paul Diez
Sent:Monday, November 23, 2009 10:14 AM
To:Elizabeth Marotta
Subject:RE: waldorf?'
Elizabeth,
To my knowledge, they have not resubmitted. I spoke with them last week and they informed me that they would
resubmit
relatively soon. 4
Jc)hn Diez
Engineering Technician
Dept. of Community Development
434) 296 -5832 Ext. 3025
From: Elizabeth Marotta
Sent: Monday, November 23, 2009 10:10 AM
To: John Paul Diez
Subject: waldorf?'
C AI " < Y(ll t 6 PvtVZas
O 1 x-17 f C"
0a C \/,
J P-
I received acsa approval of waldorf today. With that, yours is the only approval outstanding. Can you give me an update
on where they are with you? I saw the nov 6 comments in CV... have they resubmitted pursuant to fulfilling those yet?
Elizabeth M. Marotta
Senior Planner
County of Albemarle Community Development Department
401 McIntire Road
Charlottesville, VA 22902
434) 296 -5832 Ext. 3432
1
Philip Custer
From: Philip Custer
Sent: Thursday, August 19, 2010 5:16 PM
To: Elizabeth Marotta
Cc: Ray Lilly
Subject: Engineering review of Second Letter of Revision for the Waldorf School (SDP- 2009 - 00081)
Elizabeth,
I have reviewed the second Letter of Revision for the Waldorf School Site plan that relocates the biofilter farther
downhill and reintroduces the cistern, though at a different corner of the building. At this time, I have no objection to
the proposed change. But, the applicant should be informed that the new location of the biofilter is an area of the site
that was delineated as a "Future Phase" on SP- 2006 - 00010. The new location of the biofilter may complicate the review
of the future development in the area to some degree.
The change is also not substantive with regard to the Stormwater Management on site. The footprint of the facility is
the same size and all of the other approved characteristics of the facility remain as approved: section detail of the
facility, planting plan, depth from the bed to the top of dam as 1.5ft, etc. The excess copies of the plan that I have will
be distributed to the water resource inspectors. The bond amount does not need to be updated.
Please let me know if you have any questions.
Thanks,
Phil
X3072
Elizab Marotta
From:Philip Custer
Sent:Tuesday, October 26, 2010 10:43 AM
To:Elizabeth Marotta
Subject:Waldorf LOR
I have reviewed the Waldorf LOR of revision you gave me. Engineering review has no objection to the approval of the
waiver. I will note at this time that this shoulder of the entrance road appears to have been intended for overflow
parking in nearly every application. If the parking calculations from our zoning ordinance do not require these spaces,
then it makes no difference. However, if they parking calculations consider parking on the shoulder, we should
reconsider the application or they should at least have to construct the shoulder to meet the standard from detail A/14
of SDP - 2005 - 00071.