Loading...
HomeMy WebLinkAboutSDP200900081 Review Comments 2009-10-06Page 1 of 1 Elizabeth Marotta From: Glenn Brooks Sent: Tuesday, October 06, 2009 10:04 AM To: Ray Lilly Cc: Elizabeth Marotta; Amy Pflaum Subject: Waldorf School field changes Ray, Waldorf school has a site plan amendment currently in process. Elizabeth is working on it. I took a look at it, and it does not show the trees which are designated as to be saved on the erosion control plan. Neither does it show the extra graded area adjacent to the basketball court. However, it appears as though these would be approvable changes, so please let them know in your notice -to- comply letter that their site plan amendment and their erosion control plan needed to be updated for the new area, and to remove the missing trees. Thanks, Glenn Brooks, P.E. County Engineer Albemarle County 10/6/2009 Application #: I SDP2009000b°r 7Short Review Con- nnents Project Name: ICharlottesville Waldorf School - Minor Minor Amendment Date Completed: 10/14/2 Reviewer: Elizabeth Ma CommDev- Current Development Review Status: No Obi n Reviews Comments: or Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: 10/28/2009 Elizabeth Marotta CommDev- Current Development No Objection omments: 1. Signature set provides SDP200900081 on cover sheet (remove XXXX's) Signature set removes random arches from over /under "Legend /Abbreviations" 3. Must obtain Engineering Zoning /CEO and ACSA approval prior to final approval. 10/22/2009 James Barber Fire Rescue No Objection Oust comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to field nspection and verification. 10/22/2009 Jay Schlothauer Inspections No Objection 3ased on plans revised October 19, 2009. Vo comments or conditions. Date Completed: Reviewer: Jay Schl Review Status: No Obje Reviews Comments: Ba 0 Inspections plans revised September 25, 2009. comments or conditions Page: 1.00 County of Albemarle Printed On: Wednesday, October 28, 2009 SDP200900081 Waldorf S , ' Aol Minor Amendment Elizabeth Marotta Page 1 of 1 From: Eugene Ryang [eryang @waterstreetstudio.net] Sent: Tuesday, October 13, 2009 12:40 PM , To: Elizabeth Marotta Subject: RE: SDP200900081 Waldorf School Minor Amendment Hi Elizabeth, !1 We will be submitting some additional information (including water line revisions) to the MSPA submittal either this Friday (10.16) or next Monday (10.19). Thanks, Eugene eugene ryang, CLA w terstreetstudio 111 tra; From: Elizabeth Marotta [mailto:emarotta @albemarle.org] Sent: Tuesday, October 13, 2009 12:14 PM To: Eugene Ryang Subject: FW: SDP200900081 Waldorf School Minor Amendment Eugene, Please forward me a pdf of the proposed waldorf amendment. Thank you, Elizabeth From: Gary Whelan [ mailto :gwhelan @serviceauthority.org] Sent: Tuesday, October 13, 2009 11:53 AM To: Elizabeth Marotta Subject: SDP200900081 Waldorf School Minor Amendment Elizabeth, Have the applicant provide the ACSA the water line revisions as a pdf to me. I'll compare them to the approved plans to see if resubmission is necessary. Make sure that they indicate the revisions clearly with cloud lines. Thanks. Gary 10/28/2009 Elizabeth Marotta From:Elizabeth Marotta Sent:Monday, November 23, 2009 8:54 AM To:Andrew Kellerman Subject:FW: Waldorf MSPA Andy, FYI, see below. A copy will be in the file for your reference, but I don't suppose it hurts for me to send you a heads up! Thanks, Elizabeth From: Gary Whelan [ mailto :gwhelan @serviceauthority.org] Sent: Friday, November 20, 2009 8:41 AM To: Elizabeth Marotta Cc: rumberger @wwassociates.net Subject: Waldorf MSPA Elizabeth, The ACSA takes no exception to the Waldorf School Amendment Plan and it is approved. Please notify the ACSA of any activity in or near our easements or pipes so that one of our inspectors can be present. If there is an additional preconstruction meeting, we would like to be included. Gary Elizabeth Marotta From:John Paul Diez Sent:Monday, November 23, 2009 10:14 AM To:Elizabeth Marotta Subject:RE: waldorf?' Elizabeth, To my knowledge, they have not resubmitted. I spoke with them last week and they informed me that they would resubmit relatively soon. 4 Jc)hn Diez Engineering Technician Dept. of Community Development 434) 296 -5832 Ext. 3025 From: Elizabeth Marotta Sent: Monday, November 23, 2009 10:10 AM To: John Paul Diez Subject: waldorf?' C AI " < Y(ll t 6 PvtVZas O 1 x-17 f C" 0a C \/, J P- I received acsa approval of waldorf today. With that, yours is the only approval outstanding. Can you give me an update on where they are with you? I saw the nov 6 comments in CV... have they resubmitted pursuant to fulfilling those yet? Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 434) 296 -5832 Ext. 3432 1 Philip Custer From: Philip Custer Sent: Thursday, August 19, 2010 5:16 PM To: Elizabeth Marotta Cc: Ray Lilly Subject: Engineering review of Second Letter of Revision for the Waldorf School (SDP- 2009 - 00081) Elizabeth, I have reviewed the second Letter of Revision for the Waldorf School Site plan that relocates the biofilter farther downhill and reintroduces the cistern, though at a different corner of the building. At this time, I have no objection to the proposed change. But, the applicant should be informed that the new location of the biofilter is an area of the site that was delineated as a "Future Phase" on SP- 2006 - 00010. The new location of the biofilter may complicate the review of the future development in the area to some degree. The change is also not substantive with regard to the Stormwater Management on site. The footprint of the facility is the same size and all of the other approved characteristics of the facility remain as approved: section detail of the facility, planting plan, depth from the bed to the top of dam as 1.5ft, etc. The excess copies of the plan that I have will be distributed to the water resource inspectors. The bond amount does not need to be updated. Please let me know if you have any questions. Thanks, Phil X3072 Elizab Marotta From:Philip Custer Sent:Tuesday, October 26, 2010 10:43 AM To:Elizabeth Marotta Subject:Waldorf LOR I have reviewed the Waldorf LOR of revision you gave me. Engineering review has no objection to the approval of the waiver. I will note at this time that this shoulder of the entrance road appears to have been intended for overflow parking in nearly every application. If the parking calculations from our zoning ordinance do not require these spaces, then it makes no difference. However, if they parking calculations consider parking on the shoulder, we should reconsider the application or they should at least have to construct the shoulder to meet the standard from detail A/14 of SDP - 2005 - 00071.