HomeMy WebLinkAboutSDP200900062 Approval - County 2010-01-12FILE- (
Vo-i to
I IR(:INI
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
January 12, 2010
Justin Shimp
Dominion Development Resources, LLC
172 S Pantops Drive
Charlottesville, VA 22911
RE: SDP- 200900062 Free Bridge Office Preliminary Site Plan
Dear Sir:
The Department of Community Development hereby grants administrative approval to the above
referenced site plan.
The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of
Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on January
12, 2010. If the preliminary site plan approval expires, a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight (8) tentative plan
copies to the Department of Community Development. This letter must be submitted with the tentative
plans, as a checklist, to document that you have addressed all requirements or conditions. or the tentative
plan will be denied.
Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated
applications and fees must also be submitted with the eight (8) tentative Plans.
Once the tentative plan is submitted and reviewed you will receive comments from all
departments /divisions /agencies that have made comment on the tentative plan. Any further
responses must be made directly to each department /division /agency that has further comment.
After all aforementioned departments /divisions /agencies have granted a tentative approval, you
must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the
final site plan application, and final site plan fee to the Department of Community Development.
Signing of the plans will occur within one week once it is determined that the final site plan mylars
reflect all tentative approvals.
The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in
addition to the following conditions.
The Department of Community Development shall not accept submittal of the final site plan for signature
until tentative approvals for the following conditions have been obtained:
1
Zoning & Current Development approval to include:
32.5.6.n] COMMENT: Offsite parking agreement is required to be submitted and
approved prior to final site plan approval
32.7.9.6 Street Trees] COMMENT: Prior to final site plan approval, the requirements of
this section must be met.
Condition of approval of critical slopes waiver by Planning Commission (12/8/09): None
of the fill taken . from the construction site shall he taken through the entrance of
Fontana Subdivision . for depositing on another development site.
Please contact Elizabeth M. Marotta at 296 -5832 x 3432 if you have any questions.
Engineering approval:
Please contact John Paul Diez at 296 -5832 if you have questions or require additional information.
Inspections approval:
Please contact Jay Schlothauer at 296 -5832 if you have questions or require additional information.
Albemarle County Service Authority approval:
Please contact Gary Whelan at 977-4511 if you have questions or require additional information.
Fire & Rescue approval:
COMMENT: Please indicate the location of fire hydrants. Fire hydrant must be located
within 400 feet of the building by way of a prepared travel way.
Must comply with the Virginia Statewide Fire Prevention Code.
Please contact James Barber at 296 -5833 if you have questions or require additional information.
VDOT approval:
Please contact Joel DeNunzio at 293 -0011 if you have questions or require additional information.
Architectural Review Board approval:
COMMENT: ARB approval is required prior to final site plan approval. The applicant
has indicated that an ARB application will be made with the final site plan submittal. The
applicant is encouraged to submit multiple site sections from the property (including the
proposed building) through the Entrance Corridor to clarify the extent of visibility.
Please contact Margaret Maliszewski at 296 -5832 if you have questions or require additional
information.
Sincerel
Elizabeth M. Marotta, Senior Planner
Zoning & Current Development
File: SDP - 200900062 Free Bridge Office
Cc: Free Bridge Auto
Hurt Investment Company
riLEU
t IR&1\ N
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
December 18, 2009
Justin Shimp
172 S Pantops Dr
Charlottesville, VA 22911
RE: SDP200900062 Free Bridge Office - Preliminary Site Plan
Tax Map 78, Parcel 11
Dear: Mr. Shimp
The Albemarle County Planning Commission, at its meeting on, December 8, 2009 approved the above -
noted petition, by a vote of 7:0 with the following condition.
1. None of the fill taken from the construction the site shall be taken through the front entrance of
Fontana Subdivision for depositing on another development site.
If you should have any questions or comments regarding the above noted action, please do not hesitate to
contact me at (434) 296 -5832.
Sincerely,
Elizabeth Marotta
Senior Planner
Current Development Division
CH
Cc:
Free Bridge Auto
1400 Richmond Rd
Charlottesville, VA 22911