HomeMy WebLinkAboutSDP200900096 Assessment - Groundwater Final Site Plan and Comps. 2009-11-23VIAIVAT WHITMAN, REQUARDT ASSOCIATES, LLP ENGINEERS • ARCHITECTS • PLANNERS EST. 1915 November 23, 2009 Mr. Gerald Gatobu Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 -4596 Re: Albemarle County Service Authority - Camelot Pump Station - Final Site Plan Submittal WR &A W.O. # 46466 -002 Dear Mr. Gatobu: Transmitted with this letter are eight (8) copies of the final site plan for the Camelot Pump Station. The Camelot Pump Station is part of the North Fork Regional Pump Station project for the Albemarle County Service Authority (ACSA). As you know, Whitman Requardt & Associates (WR &A) is the design engineer for this project. In addition to the eight copies of the site plans, the following is included in this transmittal: Review fees from the ACSA Application for Site Development Plans Final Site Development Plan Checklist Erosion and Sediment Control Application Form Rendering for Proposed Camelot Pump Station building (included as Attachment A) WR &A has obtained a determination for Architectural Review Board (ARB) for the Camelot Pump Station. The determination was made that the pump station would comply with the rendering included in Attachment A. The site plan review and approval would be performed by Planning staff. A formal review, presentation, and approval by the ARB is not required. In addition to transmitting the final site submittal for the Camelot Pump Station, the intent of this letter is to review storm -water quantity and quality management for the pump station site and WWTP site. CAMELOT PUMP STATION AND WWTP ABANDONMENT OVERVIEW The Camelot Pump Station site will be situated south of and immediately adjacent to the existing Camelot WWTP. The parcel to be subdivided for the pump station is currently owned by HMC 9030 Stony Point Parkway, Suite 220, Richmond, Virginia 23235 www.wrallp.com Phone: 804.272.8700 Fax: 804.272.8897 Baltimore, MD • Fairfax, VA • Georgetown, DE • Newport News, VA • Pittsburgh, PA • Richmond, VA • Wilmington, DE • York, PA N: \ 46466 -002 \ Engineering\ Corresp \ Letters\ 112309 Camelot Site Plan Submittal ltr.doc Mr. Gerald Gatobu Page 2 Albemarle County Department of Community Development November 23, 2009 Holdings, LLC (HMC). The proposed area of land acquisition from HMC by the ACSA is 0.60 acre. Following the construction of the pump station and the improvements shown on the transmitted site plan, the pump station site will have 0.04 acre of impervious cover while 0.49 acre of the property will remain vegetated after construction. The vegetated and undisturbed portion of the property is the floodplain of the North Fork of the Rivanna River. This portion of the property will remain undisturbed and vegetated as the ACSA has no plans for future site improvements in the floodplain. The Camelot Pump Station will replace the Camelot WWTP which currently resides on a 1.23 acre lot immediately adjacent to the pump station site. The Camelot WWTP site currently has 0.07 acre of impervious cover (5.7% of the total property area). The remaining 0.80 acre of the property is heavily vegetated. The 0.07 acre of impervious area within the Camelot WWTP site does not include the primary treatment basins and the existing storage tank within the site. The total area of the treatment basin and tank equal an additional 0.07 acre. Upon construction and successful start -up of the Camelot Pump Station, the Camelot WWTP will be decommissioned, demolished, backfilled, graded, compacted, and seeded. The removal of the Camelot WWTP will result in a total of 0.14 acre of land that will be restored to its original grassed or vegetated state. In addition, the existing discharge from the Camelot WWTP will be eliminated, resulting in reduced pollutant (nitrogen and phosphorus) loads and the elimination of a major point source discharge to the North Fork of the Rivanna River. STORM -WATER MANAGEMENT REVIEW AND DETERMINATION Storm -Water Quality Review WR &A recently met with the Department of Community Development to review storm -water quality control for the Camelot Pump Station and the decommissioning of the Camelot WWTP. Following an overview of the sites' drainage patterns, it was determined that the Camelot Pump Station site will be considered as a redevelopment area with regard to storm -water quality control as shown on the County's Water Protection Ordinance computation spreadsheet. Following a review of the area types outlined in the spreadsheet, the Camelot Pump Station and the decommissioning of the Camelot WWTP do not fall under the area type of "Rural Land ". In addition, a review of the County GIS layers revealed that the project sites are not in the area type of "Drinking Water Watersheds ". As a result, it is WR &A's opinion that the Camelot Pump Station and Camelot WWTP fall in the area type of "Development Area ". Two methods were used to confirm the need for storm -water quality control for the Camelot Pump Station and the decommissioning of the Camelot WWTP. These methods are summarized as follows: Offsite and Onsite Drainage to a Point of Analysis - Under this method, the offsite and onsite drainage that is not conveyed in a separate storm drain system is analyzed at a single point of analysis on the Camelot WWTP site. The drainage area is 0.77 acre. The pollutant loads and N: \ 46466 -002 \ Engineering\ Corresp \ Letters \ 112309 Camelot Site Plan Submittal ltr.doc Mr. Gerald Gatobu Page 3 Albemarle County Department of Community Development November 23, 2009 required pollutant removal for this method are shown on Worksheet 1 of the Water Protection Ordinance computation spreadsheet and are illustrated on Figure 1. Worksheet 1 and Figure 1 are included in Attachment B. Parcel Area Drainage to River - Under this method, the total of the Camelot Pump Station and Camelot WWTP parcel areas are evaluated for pollutant loads and removal requirements. The drainage area is 1.83 acres (0.60 acre for the Camelot Pump Station site + 1.23 acres for the Camelot WWTP site). The pollutant loads and required pollutant removal for this method are shown on Worksheet 2 of the Water Protection Ordinance computation spreadsheet and are illustrated on Figure 2. Worksheet 2 and Figure 2 are included in Attachment C. The results of each of these methods are described in the following subsections. Offsite and Onsite Drainage to a Point of Analysis A drainage area of 0.77 acre is shown in Worksheet 1 and on Figure 1. This drainage area is a combination of existing offsite and onsite areas as shown on Figure 1. The existing offsite impervious area is 12,000 square feet. This existing offsite impervious area is shown under both the pre- and post - construction tabulations. Worksheet 1 shows the pre - development and post - development impervious cover equaling 45 %. Even with the same impervious area (as a function of percentage) in the pre -and post - construction conditions, the worksheet shows that the required pollutant removal is 9% for the "Development Area" area type. As summarized above, the area within the existing floodplain of the North Fork of the Rivanna River will remain undisturbed, vegetated, and will function as a vegetative filter. This existing vegetative filter is approximately 1.3 acres in area. Based on the 9% required pollutant removal, a vegetative filter strip is an appropriate selection as an adequate Best Management Practice (BMP) as outlined in Table 1 in Chapter 1 of the Virginia Storm -water Management Handbook (VSM Handbook). Based on this analysis and the understanding that the existing floodplain will remain and act as a vegetative filter, an additional BMP for storm -water quality management is not warranted under this method of analysis. Parcel Area Drainage to River A drainage area of 1.83 acres is shown in Worksheet 2 and on Figure 2. This drainage area is a total of the parcel areas of the Camelot Pump Station and the Camelot WWTP sites. Using the sum of the parcel areas as the drainage area and the pre- and post - construction impervious areas for both parcels, Worksheet 2 shows that both the pre- and post - construction impervious areas equal 3 percent. Similar to the method outlined above, the development of the Camelot Pump Station and the decommissioning of the Camelot WWTP results in no net increase in impervious area for the combination of these two parcels. N: \46466- 002 \Engineering \Corresp \Letters \112309 Camelot Site Plan Submittal ltr.doc Mr. Gerald Gatobu Page 4 Albemarle County Department of Community Development November 23, 2009 In addition, Worksheet 2 tabulates the required pollutant removal to be a negative number for the Development Area" area type, under the Redevelopment area of the worksheet. This result clearly indicates that a BMP is not needed based on this analysis method. Storm -Water Quantity Review Figures 1 and 2 as included in Attachments B and C, respectively, show that most of the offsite drainage will be conveyed through a new storm drainage system. The conveyance of this offsite drainage through a new system is meant to maintain the existing drainage pattern at the Camelot Pump Station site. The new storm drainage system is also detailed on the transmitted site plans. The system is sized for the 10 -year storm event. As part of storm -water quantity review, Minimum Standard (MS) 19 must also be reviewed for this new point source discharge to confirm that an adequate receiving channel exists. Sheet C1 -03 in the submitted site plan shows the cross - sections of the receiving channel. The cross - sections and tabulation shown on Sheet C1 -03 indicates that the existing channel at the discharge location of the new storm drainage system has the necessary depth to convey the design flows. To control velocity under the design storm, a permanent rip rap outfall has been designed and shown on the submitted site plan. As indicated on Sheet C1 -03, the discharge velocity is 1.54 fps at the rip rap outfall, resulted in a non - erosive discharge condition. The discharge velocity at cross - section 0 +00 (which is below the outfall, at existing grade) is 2.58 fps. This discharge velocity is also considered non - erosive for a heavily vegetated floodplain and overland area. Based on the results of this analysis, MS -19 has been satisfied. The storm sewer design computations and hydraulic grade line computations are included in Attachment D. The open channel flow computations for the cross - sections used for the MS-19 analysis are included in Attachment E. Based on no -net increase in impervious area as summarized above and compliance with MS -19, storm -water quantity control is not warranted for the Camelot Pump Station and for the decommissioning of the Camelot WWTP. Storm -Water Management Review Conclusion Based on the storm -water quality and quantity review outlined in this letter, the supporting attachments, the information contained on the site plans, and the removal of the existing point source and process discharge of the Camelot WWTP, storm -water quality and quantity control for the Camelot Pump Station and for the decommissioning of the Camelot WWTP are not warranted. N: \46466- 002\ Engineering \Corresp \Letters \112309 Camelot Site Plan Submittal ltr.doc Mr. Gerald Gatobu Page 5 Albemarle County Department of Community Development November 23, 2009 We trust that this letter adequately summarizes our analysis and transmits the required information for final site plan review. Should you have any questions, please do not hesitate to call. Thank you for your cooperation in this matter. Very truly yours, Whitman, Requardt & Associates, LLP Charles Luck, P.E. Associate Enclosures cc: Tom Garrison — ACSA File 46466 -002 N:\ 46466 - 002 \Engineering \Corresp \Letters \112309 Camelot Site Plan Submittal ltr.doc Attachment B Worksheet 1 and Figure 1 Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method CAMELOT PUMP STATION Plan: WORKSHEET NO. 1 Water Resources Area:Development Area Preparer:YLM Date: 18- Nov -09 Project Drainage Area Designation DA# 2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 1 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =0.77 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 0 12000 0 0 0 12000 0 0 0 0 0 0 0 2175 0 12000 0 0 0 0 14175 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 0 Gravel areas Area 3778 Area 734 x 0.70 =2644.6 x 0.70 =513.8 Structures Area no.subtotal Area no.subtotal 0 0 608 0 0 300 O 0 0 0 0 0 O 0 0 608 0 300 Actively - grazed pasture &Area Area yards and cultivated turf x 0.08 =0 0 x 0.08 =0 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 45%45% l(pre)post) Rv(post) V 0.45 23.1 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 1.00 20% 0.46 2.17 2.14 0.03 2% Development Area 0.35 1.00 0% 0.46 1.09 1.07 0.02 2% Drinking Water Watersheds 0.40 1.00 1% 0.46 1.24 1.22 0.02 2% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.46 2.17 2.14 0.18 9% Development Area 0.35 0.85 0% 0.46 1.09 1.07 0.15 14% Drinking Water Watersheds 0.40 0.85 1% 0.46 1.24 1.22 0.17 14% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB I I 11 L a0,am it I I x _ ov 1 o 0o v LOD LOD LOD 1 1 C_L)V•P rialim 0 v 1 1 0 I-OJ 0 0 o 0 v o O J r IMMO OM= MIMI 44444,0 lors% o o I DA /2 =0.77 ACRES' v 4, r IX 12 16= 11/1111% CULVERT TO BE REMOVED I ab T aO an am I IX i 12' r0 CULVERT TO eE I v I REMOVED 4\ 94??1 I i 0 O SEE NOTE 3) 411\IX UIl1IY /POYIER POLE ISEENOTE3) O Q (SEE NOTE 2)o r`•p.,1 ems• OM or ' :',11110 0 7 s,..*s.s.•s 00216 II 4•\,.V•. Wf 1 CULVERT TO BEi NWAT::iV. ir ' Ill 1. Allii : 1 1%CAMELOT WI/VTP 4* \ SLT FENCE OUTLET 0 0 0 I PROTECTOR I 1 O WW14;ilbonlir SLT FENCE (VP )r WHITMAN, REQ[IARDT AND ASSOCIATES, LLP OEngineers, A'rcjritects and Ptw, n,- s 9030 ,S'ton.y Po'i'nt Pa.rk'wa.y, „S 'wile 220 ill 1•••• N. 80 ) 27 8700 R'ichrrLort , d , V 'i, r'g irr i, FAX: 272-8897 r w ir.zrrcillp. c'o rr+.0 ALBEMARLE COUNTY SERVICE AUTHORITY CAMELOT PUMP STATION SCALE FIGURE 1 0 40'80' Attachment C Worksheet 2 and Figure 2 Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method CAMELOT PUMP STATION Plan: WORKSHEET NO. 2 Water Resources Area:Development Area Preparer:YLM Date: 18- Nov -09 Project Drainage Area Designation DA# 2 1.storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =1.83 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2175 0 0 0 0 0 0 2175 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 0 Gravel areas Area 2635 Area 0 x0.70=1844.5 x0.70=0 Structures Area no.subtotal Area no.subtotal 0 0 608 0 0 300 0 0 0 0 0 0 0 0 0 608 0 300 Actively - grazed pasture &Area Area yards and cultivated turf x 0.08 =0 0 x 0.08 =0 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 3%3% l(pre)post) Rv(post) V 0.08 3.8 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 1.00 20% 0.23 2.58 0.88 1.71 195% Development Area 0.35 1.00 0% 0.08 0.44 0.44 0.00 0% Drinking Water Watersheds 0.40 1.00 1% 0.08 0.50 0.50 0.00 0% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.23 2.58 0.88 1.45 166% Development Area 0.35 0.85 0% 0.08 0.44 0.44 0.07 15% Drinking Water Watersheds 0.40 0.85 1% 0.08 0.50 0.50 0.08 15% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB 1\1 1 il'-_ 1 IN i I N i I i 0 I r l MI II I L O i 107,.... "C41,S__.. - :, one 1111.9"'MOO MIN=-MM.-1 i t1! ' jilinflir7 I ...* r I1 J 1 1 1 1 I TOTAL PROJECT AREA =1.83 ACRES CAMELOT PS SITE =0.60 ACRES & CAMELOT WWTP SITE =1.23 ACRES) 1 1 1 I 2 Ilik7aniZek Imiew, WHITMAN, REQ UARDT AND ASSOCIATES', LLP Engineers, Architects and Planners 9030 Stony Point Parkway, Sn 220 804) 27> 8700 Richrrrorrd, Vir FAX: 272 -8897 1 Lc. uurallp.conz ALBEMARLE COUNTY SERVICE AUTHORITY CAMELOT PUMP STATION SCALE FIGURE 2 0 40'80' Attachment D Storm Sewer Design and Hydraulic Grade Line Computations Ez W Zz w z z z D m N T.m z 0 -0 - 0 N S O (/) m o cn 00 n z L.in o mxi nMmzO c) 11 m ron Co 5 O o O v N z 0 D cn1F -<z N 73 71 00O o N D O o o N D z m X N rnzi oo ooc Om z o n 7 z ZZ X I ° o N E Z 0 0 r-oo rn O 0 o 0 Z n N N r o 0co o o m C v .O C Zy E 1 E 11 —I o z m m O 0 m v, v,z r 0 -1cocoxrz 0 N C Ill w Am? n c E 0 co N Z -o m z v m m 0 0 73 1 m O r Z r m t/) 0 m m O y co o Z z 1 0 0 v O z cn r o rn Z o O 2 0 0 m N I r co N E v w w D 0 C7 D In 0 0 rn T m 0 OO cn W N t1 0 o r Z 0 rn 0 n I E m 3 n z C CA) OD g m 0) 0 2 P3 m m Xz X i- cn 0 m Z r_r I-- Ica 2 Ek3 a) Z o j u c r- mOJO 2 X ® D a C 0 o 2 w o oo r 0 O n zi m E o Z m r oom 00wA0 H 0 oc w E k o X o 2 d % .. 3 k 0se 4 71 cn z I •-•.1 1 w O t o - n 1 Z 2 CO 0 X m n a moo@Q b mz D o w 71 E r b b o 2 g /@ rq c \ 2 z _ z 1 " 0 1:4 o /0 0 z m O o r 6 Q x 0 q E d' o %mD r m 71 3 o a o 1 co ZZ M m oo 2 z r -I co / • m E 0 7 Z m 0 . m 0 0 E k k m z @ m Attachment E Open Channel Flow Computations for MS -19 Analysis Worksheet for Trapezoidal Channel - STA 0 +00 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.033 Channel Slope 0.00500 ft/ft Left Side Slope 0.04 ft/ft Right Side Slope 0.23 ft/ft Bottom Width 4.50 ft Discharge 10.72 ft /s Results Normal Depth 0.55 ft Flow Area 6.97 ft Wetted Perimeter 20.80 ft Hydraulic Radius 0.34 ft Top Width 20.72 ft Critical Depth 0.38 ft Critical Slope 0.02549 ft/ft Velocity 1.54 ft/s Velocity Head 0.04 ft Specific Energy 0.59 ft Froude Number 0.47 Flow Type Subcntical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.55 ft Critical Depth 0.38 ft Channel Slope 0.00500 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 11/23/2009 10:22:46 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 2 Worksheet for Trapezoidal Channel - STA 0 +00 GVF Output Data Critical Slope 0.02549 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 11/23/2009 10:22:46 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 2 of 2 Worksheet for Triangular Channel - STA 0 +16 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.045 Channel Slope 0.04650 fUft Left Side Slope 0.06 ft/ft Right Side Slope 0.04 ft/ft Discharge 10.72 ft /s Results Normal Depth 0.44 ft Flow Area 4.15 ft Wetted Perimeter 19.01 ft Hydraulic Radius 0.22 ft Top Width 18.99 ft Critical Depth 0.43 ft Critical Slope 0.04923 ft/ft Velocity 2.58 fUs Velocity Head 0.10 ft Specific Energy 0.54 ft Froude Number 0.97 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.44 ft Critical Depth 0.43 ft Channel Slope 0.04650 ft/ft Critical Slope 0.04923 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 11/23/2009 10:22:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1