Loading...
HomeMy WebLinkAboutSDP200800174 Review Comments 2008-12-16FALLL Fli'llfy I - 71 P IMP y COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4.596 Phone (434) 296 -5832 Fax (434) 972 -4126 December 16, 2008 Mr. Scott Collins Collins Engineering 800 East Jefferson Street Charlottesville, Virginia 22902 RE: SDP - 2008 -174- Old Trail Village Block 2- Preliminary Site Plan Mr. Collins: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Planning (E911) Albemarle County Division of Zoning Inspections Albemarle County Division of Planning (Architectural Review Board) Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by December 20, 2008. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Megan Yaniglos Senior Planner Zoning & Current Development h .0VsL tr hi.11lll 72 w& 1k.V County of Albemarle Department of Community Development Memorandum To:Scott Collins (scott @collins - engineering.com) March Mountain Properties LLC (Justin @beightsdevelopment.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date:December 16, 2008 Subject: SDP -2008 -174- Old Trail Block 2- Preliminary Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. 32.5.6 (a); Proffer #1] Before the approval of the Final Site Plan for this block, the greenspace shown on sheet 5 of 9 of the General Development Plan will need to be dedicated to the County for public use. This includes the 25- acre park, 10.8- acre greenway area, and the 6.7- acre greenway area. The notations for dedication need to be included with the preliminary plan. Please review Proffer #1 for the full description. 2. 32.5.6 (a)] The removal of the street to the rear of the block requires a variation. Please submit the application and documentation necessary for the review of this variation to the plan. 3. 32.5.6 (b); 4.12.10] A parking study will be required for the zoning administrator review in order to approve the shared parking. Submit the required information as stated in 4.12.10 of the zoning ordinance. j A 4. 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and V Block 2 for review and approval from the County Attorney as specified in section 4.12.8 e). 5. 32.5.6 (n)] Show the layout and dimensions within the parking garage to assure that enough spaces are being provided, and that proper site distance is being met. 6. 32.5.6 (b)] Parking for Block 1 must be provided at all times, regardless of phasing for p 3 .Block 2. Show parking for phase 1 and phase 2 separately to ensure parking is being provided for Block 1. Currently phase 1 is only providing 82 spaces, when Block 1 r ,,0-i required 182 additional spaces that are not being provided within Block 1. 7. 32.5.6 (i)] Reas Creek Drive's name has changed. Revise all sheets to reflect the new 96 V approved name per Andy Slack's comment. L44 ,‘,0 1 OPo3 Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 1 of .ALp d. `1ta County of Albemarle Department of Community Development Memorandum To:Megan Yaniglos, Current Development Project Planner From: John P. Diez, Current Development engineering review Date:16 December 2008 Subject: Old Trail Village Center — Block 2, Preliminary Site Plan (SDP- 2008 - 00174) The preliminary site plan for Old Trail village Center — Block 2 has been reviewed. The engineering review for current development can recommend approval once the following items have been addressed. 1. 18- 32.5.6.k] Please indicate direction of flow in all proposed pipes and watercourses with arrows. 2. 18- 32.5.6.1] Please indicate the location of all existing and proposed utility and utility easements. 3. 18- 32.5.6.q] Please provide estimated traffic generation figures for the site based upon current Virginia Department of Transportation rates. 4. 18- 4.12.16c.3] The minimum aisle width of a perpendicular parking area with 9x8 parking spaces is 24'. In addition, the minimum requirement for parallel parking spaces is 9x20. A 14' aisle width would suffice if the parking space were angled at 45 degrees. 5. Please provide better turn- around options for both the dumpster and loading areas. 6. Per VDOT intersection spacing standards, the underground parking garage and parking lot entrance on the south side of the property are too close. 7. Please check the radius for the curve on Brookley Drive to check that it meets VDOT standards. 8. Please provide a schematic diagram for the underground parking garage. 9. Please describe provisions for stormwater detention. The following fmal site plan comments have been provided as a courtesy to the applicant and will not need to be addressed to receive preliminary approval. 1. 50% Removal Rate may or may not be enough necessary for this development. This will be reviewed during the fmal site plan process. 2. Engineering has no objection with the critical slopes waiver. However, critical slopes on the area for the proposed biofilter may need stabilization. This will be reviewed during the fmal site plan process. Application #:SDP200800174, - ;Short Review Com ents Project Name: Old Trail Village - Phase 8 - Block 2 - Prelim Preliminary — Residential Date Completed:12/09/2008 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments: THE ROAD NAME "REAS CREEK DRIVE" HAS OFFICIALLY BEEN CHANGED TO "GOLF DRIVE." THE CORRECT NAME SHOULD BE DISPLAYED ON THE FINAL PLAT. Date Completed:12/17/2008 Reviewer:Brent Nelson ARB Review Status:Requested Changes Reviews Comments: iThis parcel, located in the EC Overlay District and visible from the Route 250W Entrance Corridor, will require ARB review and approval. An ARB application for this proposal has not been received. Date Completed:12/16/2008 Reviewer:John Paul Diez Engineer Z &CD Review Status:Requested Changes Reviews Comments: SRC 12/18/08 Date Completed:12/16/2008 Reviewer:John Paul Diez Engineer Z &CD Review Status:No Objection Reviews Comments: The request has been receieved. Engineering will follow review before the PC meeting. Date Completed:12/05/2008 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Based on plans dated November 24, 2008. Based on the total number of parking spaces provided for Block 2 (248), there must be seven barrier -free parking spaces. Provide one more barrier -free parking space with its associated striped access aisle and curb cut. Relocate at least three of the barrier -free parking spaces to within the parking garage. At least one of Ithe spaces in the garage, and one of the surface spaces, must be van - accessible. Page: 1.00 County of Albemarle Printed On: Thursday, December 18, 2008 COMMONWEALTH of 1, DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER December 16` 2008 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments December 18 2008 site review meeting Dear Mr. Brooks: Below are VDOT' s comments on the Site Plans for the December 18 2008 Site Review Committee Meeting: SDP - 2008 - 00174 Old Trail Village - Phase 8 - Block 2 Preliminary (Megan Yaniglos) Show entrance profiles for entrances to proposed public roads in accordance with the VDOT Standard CG -11. Street trees need to be pulled off all corners for a minimum of 30 feet to ensure safe access in accordance with the landscape requirements in the VDOT Road Design Manual. SDP - 2008 - 00175 Saint David's Anglican Church - Preliminary (Summer Frederick) The entrance onto Route 1001 needs to show a profile in accordance with the VDOT Standard CG -11. The width of the entrance should be in accordance with the details shown in the Minimum Standards of Entrances to State Highways. SUB - 2008 - 00283 Ashcroft - Section VI - phase II - Final (Gerald Gatobu) No comments SUB - 2008 - 00287 Fontana - Phase C Section 1 Preliminary (Summer Frederick) The final site plans will need to include road and drainage plans. SUB - 2008 - 00290 Oakleigh Albemarle (1 lots) — Final (Elizabeth Marotta) WE KEEP VIRGINIA MOVING No comments Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 -293 -0011 WE KEEP VIRGINIA MOVING TO:Page 1 of 1 Megan Yaniglos From: Gary Whelan [gwhelan @serviceauthority.org] Sent: Monday, December 15, 2008 2:08 PM To:Megan Yaniglos Subject: Old Trail Village Phase 8 Block 2 ACSA comments TO: Megan Yaniglos FROM: Gary Whelan, Civil Engineer DATE: December 10, 2008 Old Trail Village — Phase 8 — Block 2 - Preliminary RE: Site Plan Technical SDP200800174 Review for: TM 55E -1 -A1 The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located on site. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. An 8 inch sewer line is located on site. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. 9. No plans are required. X 10. Final water plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12.RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Provide a plumbing fixture count to size the water meter. Backflow prevention is required. 12/15/2008 of ALg4`, yy w County of Albemarle Department of Community Development Memorandum To:Scott Collins (scoff @collins - engineering.com) March Mountain Properties LLC (justin@beightsdevelopment.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date:December 16, 2008 Subject: SDP - 2008 -174- Old Trail Block 2- Preliminary Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1[32.5.6 (a); Proffer #1] Before the approval of the Final Site Plan for this block, the greenspace shown on sheet 5 of 9 of the General Development Plan will need to be dedicated to the County for public use. This includes the 25- acre park, 10.8- acre greenway area, and the 6.7- acre greenway area. The notations for dedication need to he ncluded with the preliminary plan. Please review Proffer #1 for the full description. 32.5.6 (a)] The removal of the street to the rear of the block requires a variation. Please submit the application and documentation necessary for the review of this variation to the plan. 3 32.5.6 (b); 4.12.10] A parking study will be required for the zoning administrator review in order to approve the shared parking. Submit the required informa 'on as stated in 4.1 2.10 of the zoning ordinance. 74. 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and Block 2 for review and approval from the County Attorney 9, s specified in section 4.12.8 e).. het,AS 40 fix. Con., w( soUivts:or -h: s bkv.- SSu82 2,5( 32.5.6 (n)] Show the layout and dimensions within the parking garage to assure that enough spaces are being provided, and that proper site distance is being met. 4, [32.5.6 (b)] Parking for Block 1 must be provided at all times, regardless of phasing for Block 2. Show parking for phase 1 and phase 2 separately to ensure parking is being provided for Block 1. Currently phase 1 is only providing 82 spaces, when Block 1 required 182 additional spaces that are not being provided within Block 1. --.7 sa 415,5k (es 32.5.6 (i)] Reas Creek Drive's name has changed. Revise all sheets to reflect the new J . $( 41,approved name per Andy Slack's comment. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 1 4 .1*,„ 7 , 3 f 7kGhA? County of Albemarle Department of Community Development Memorandum To:Scott Collins (scoff @collins - engineering.com) March Mountain Properties LLC (justin @beightsdevelopment.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date: Revl: January 13, 2009 Subject: SDP - 2008 -174- Old Trail Block 2- Preliminary Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 2. 32.5.6 (a)] The removal of the street to the rear of the block requires a variation. Please submit the application and documentation necessary for the review of this variation to the plan. Rev1: Comment addressed. Planning is reviewing the request for the removal and will comment or approve the variation. 3. 32.5.6 (b); 4.12.10] A parking study will be required for the zoning administrator review in order to approve the shared parking. Submit the required information as stated in 4.12.10 of the zoning ordinance. Rev]: Comment addressed. The Zoning Administrator is reviewing the shared parking information submitted and will comment or approve. 4. 32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared parking for Block 1 and Block 2 for review and approval from the County Attorney as specified in section 4.12.8 e). Revl: Comment needs to be addressed with the subdivision application- SUB2008 -281. This comment has been made for that application. 6. 32.5.6 (b)] Parking for Block 1 must be provided at all times, regardless of phasing for Block 2. Show parking for phase 1 and phase 2 separately to ensure parking is being provided for Block 1. Currently phase 1 is only providing 82 spaces, when Block 1 required 182 additional spaces that are not being provided within Block 1. Rev1: Comment addressed if shared parking is approved. 1 Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further infoimation. 2 illls IIN IS":I , County of Albemarle Department of Community Development Memorandum To:Scott Collins (scoff @ collins - engineering.com) March Mountain Properties LLC (justin @beightsdevelopment.com) From:Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date: Revl: January 13, 2009 Subject: SDP - 2008 -174- Old Trail Block 2- Preliminary Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. 32.5 6 (a). P1 \)1te 1 i re the appro ai of the i ai Site i ien tt)S this k ch. me iireens ?aee shimD. On sheet 3 of 9 o the (it'nc1al . Development P ar will . iwc d: to be dedicated to the ('punt) for publici.ic use. Ills i.n :iuc es t1w 2 a ark, 10,S- acre greet a1 4'i and the 6.7 gr"C " n ay ar:;a f,C' tzu ath: +D2.)` (Is, (II, ric cd 10 !?F: iYi hidedd ,,C in t. i rP27;1w ti.. Please rev 'tot Pm!'! ttir the lull pt .1(?ii Rev i f " nd tii l e(1, 2O [32.5 .6 (a)] The removal of the street to the rear of the block requires a variation. Please submit the application and documentation necessary for the review of this variation to the plan. Revl: Comment addressed. Planning is reviewing the request for the rem val and will comment or approve the variation. —\to. l' 0 . 4iOr S+jij( AA O [32.5.6 (b); 4.12.10] A parking study will be required for the zoning administrator reviewinordertoapprovethesharedparking. Submit the required information as stated in 4.12.10 of the zoning ordinance. Revl: Comment addressed. The Zoning Administrator is revi wi g th shared parking information submitted and will comment or approve. Mc,„,,,y d 4 gevieAt32.5.6 (b); 4.12.8 (e)] Provide an instrument for the shared pa for Block 1 and Block 2 for review and approval from the County Attorney as specified in section 4.12.8 e). Revl: Comment needs to be addressed with the subdivision application- SUB2008 -281. This comment has been made for that application. i parking fai .Aire (1)1.i t lokt' li sp, i -c being our,indtii it proper sift. iiishnikx is TtIC! miline,l> o ddre:, e . 32.5.6 (b)] Parking for Block 1 must be provided at all times, regardless of phasing for Block 2. Show parking for phase 1 and phase 2 separately to ensure parking is being provided for Block 1. Currently phase 1 is only providing 82 spaces, when Block 1 required 182 additional spaces that are not being provided within Block 1. Revl: Comment addressed if shared parking is approved. 1 Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 2 ok AL ill' 71) RGIN lhgr COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 February 19, 2009 Scott Collins Collins Engineering 800 E. Jefferson Street Charlottesville, VA 22902 RE: Old Trail Village, Blocks 1 & 2 Shared Parking Analysis Dear Mr. Collins: You have provided a parking analysis that supports the provision of 454 parking spaces to serve Blocks 1 & 2 in Old Trail Village. Proposed Block 1 uses include 78 residential units, 20,898 square feet of gross leasable area of restaurant/retail, 20,898 square feet of gross leasable area for office and 7,216 square feet for an athletic facility. A facility for the elderly is proposed for Block 2 consisting of 40 assisted living beds and 78 congregate care dwelling units and 40 employees. I agree with the conclusion of your Parking Analysis, dated February 10, 2009, that a shared parking arrangement utilizing 454 parking spaces to serve the proposed uses is reasonable. This is based primarily on the difference in peak demand for parking between the office use and the residential, restaurant/ retail & athletic facility uses described below. I also found it to be significant that this is a reduction of 18.6% which is considerably less than the 35% allowed by the ordinance in section 4.12.10.d. The basis for this approval is further explained as follows: 1. The zoning ordinance requires 430 spaces for Block 1 (assuming the shopping center standard for developments containing between 200,001 and 600,000 gross leasable area) and 128 spaces for Block 2 based on section 4.12.6. Block 1: 78 Dwelling Units-156 spaces 20,898 s.f. Restaurant/ Retail- 4.5/1000 s.f. 94 spaces 20,898 s.f. Office- 1/200 net s.f.84 spaces 7216 s.f. Athletic Facility- 1/75 s.f.96 spaces Total 430 spaces Scott Collins February 19, 2009 Page 2 Block 2: 78 Congregate Care Units- 1 /unit 78 spaces 40 Assisted living beds- 1/4 beds 10 spaces 40 Employees-1 /emp. 40 spaces Total 128 spaces Total required spaces per zoning ordinance for Block 1 & 2 = 558 Total provided spaces on Blocks 1 & 2.454 Deficit 104 Percentage of reduction 18.6% This calculation does not include a reduction of required parking based on sharing between staff and congregate care residential units. 2. Your analysis of the highest total parking demand, based on ULI figures, is 474 spaces required for Block 1 on weekends in December. This figure, plus 128 spaces for Block 2, indicates a peak total demand of 602 spaces. This results in a deficit of 148 spaces. The percentage of this reduction is 24.5 %. This figure is less than the 35% limit on shared parking and is anticipated to occur for a small percentage of the year. Your analysis for the majority of the year, based on ULI figures indicates that Block 1 will experience a maximum parking demand of 414 spaces and Block 2 will require 107 spaces. This results in a deficit of 67 spaces. The percentage of this reduction is 12.8 %. 3. It is recognized that the residential, restaurant /retail and athletic facility all share a peak demand around 6 P.M. (Block 1) However, this is off set by the office use that experiences a different peak time. 4. The pool in Block 3 is not adjacent to Blocks 1 & 2. It is not factored into this determination. That said, it is recognized that there are future shared parking opportunities in Block 3. In the event that parking issues become evident in Old Trail Village later there will be an opportunity to address them in the course of future development. Please contact me if you have questions. Sincerely, John Shepherd Manager of Zoning Administration t AL, County of Albemarle Department of Community Development Memorandum To:Megan Yaniglos, Current Development Project Planner From: John P. Diez, Current Development engineering review Date:16 December 2008 Rev 1:20 January 2009 Rev 2:20 March 2009 Subject: Old Trail Village Center — Block 2, Preliminary Site Plan (SDP -2008- 00174) Current Development Engineering Review Comments Page 2 of 2 The following fmal site plan comments have been provided as a courtesy to the applicant and will not need to be addressed to receive preliminary approval. 1. 50% Removal Rate may or may not be enough necessary for this development. This will be reviewed during the fmal site plan process. 2. Engineering has no objection with the critical slopes waiver. However, critical slopes on the area for the proposed biofilter may need stabilization. This will be reviewed during the final site plan process. 3. The fmal site plan review will be subject to section 18- 32.7.2.a - parking structures. At this time, also, waivers regarding the parking area should be requested by the applicant for the zoning administrator. For example, reduction and space width due to columns, and 100 foot site distances due to walls, etc. OF AL +., Vort County of Albemarle Department of Community Development Memorandum To:Scott Collins (scoff @collins - engineering.com) March Mountain Properties LLC (justin @beightsdevelopment.com) From: Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date: Rev2: April 9, 2009 Subject: SDP -2008 -174- Old Trail Block 2- Preliminary Site Plan The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 2. 32.5.6 (a)] The removal of the street to the rear of the block requires a variation. Please submit the application and documentation necessary for the review of this variation to the plan. Rev2: The variation is still being reviewed by planning. 3. 32.5.6 (b); 4.12.10] A parking study will be required for the zoning administrator review in order to approve the shared parking. Submit the required information as stated in 4.12.10 of the zoning ordinance. Rev2: The shared parking was revised and is being reviewed by John Shepherd. 1 6. 32.5.6 (b)] Parlang for Block 1 must be provided at all times, regardless of phasing for Block 2. Show parking for phase 1 and phase 2 separately to ensure parking is being provided for Block 1. Currently phase 1 is only providing 82 spaces, when Block 1 required 182 additional spaces that are not being provided within Block 1. Rev2: John Shepherd is reviewing the revised shared parking information, which will address this comment. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further infoiiiiation. A./4\ k '1 ys. vIRGnso COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 July 1, 2009 Scott Collins Collins Engineering 800 E. Jefferson Street Charlottesville, VA 22902 RE: Old Trail Village, Blocks 1 & 2 Shared Parking Analysis Dear Mr. Collins: You have provided a parking analysis that supports the provision of 449 parking spaces to serve Blocks 1 & 2 in Old Trail Village. Proposed Block 1 uses include 78 residential units, 20,898 square feet of gross leasable area of restaurant /retail, 20,898 square feet of gross leasable area for office and 7,216 square feet for an athletic facility. Proposed Block 2 includes 10,500 square feet of gross leasable area of office space as well as a facility for the elderly consisting of 40 assisted living beds and 78 congregate care dwelling units and 40 employees. I agree with the conclusion of your Parking Analysis, dated May 5, 2009, that a shared parking arrangement utilizing 449 parking spaces to serve the proposed uses is reasonable. This is based primarily on the difference in peak demand for parking between the office use and the residential, restaurant/ retail & athletic facility uses described below. I also found it to be significant that this is a reduction of 20.5% which is Tess than the 35% allowed by the ordinance in section 4.12.10.d. The basis for this approval is further explained as follows: 1. The zoning ordinance requires 392 spaces for Block 1 (assuming the shopping center standard for developments containing between 200,001 and 600,000 gross leasable area) and 173 spaces for Block 2 based on section 4.12.6. Block 1 Uses Required Spaces 78 Dwelling Units 156 20,898 s.f. Restaurant/ Retail- 4.5/1000 s.f.94 20,898 s.f. Office- 1/200 net s.f.84 7216 s.f. Athletic Facility- 1/125 s.f.58 Total 392 Scott Collins July 1, 2009 Page 2 Block 2 Uses Required Spaces 10,500 s.f. Office- 1 /200 net s.f.42 78 Congregate Care Units- 1 /unit 78 40 Assisted living beds- 1/3 beds 13 40 Employees-1 /emp.40 Total Required 173 Total required spaces per zoning ordinance for Block 1 & 2 = 565 Total provided spaces on Blocks 1 & 2.449 Deficit 116 Percentage of reduction 20.5% This calculation does not include a reduction of required parking based on sharing between staff and congregate care residential units. 2. Your analysis, based on ULI figures, indicates that Block 1 will experience an overall maximum parking demand of 424 spaces and that Block 2 will require 107 spaces. This results in a deficit of 82 spaces with the provision of 449 spaces. The percentage of this reduction is 15 %. 3. It is recognized that the residential, restaurant/retail and athletic facility all share a peak demand around 6 P.M. (Block 1) However, this is off set by the office use that experiences a different peak time. 4. As Old Trail Village has been developed as a pedestrian friendly neighborhood, it is anticipated that many of the patrons of the village and residents of the neighborhood will consider walking, as well as other modes, as a reasonable mode of transportation. 5. The pool in Block 3 is not adjacent to Blocks 1 & 2. It is not factored into this determination. At this time, the additional parking that would be provided by Block 3 will not be necessary, but it is recognized that there are future shared parking opportunities in Block 3. In the event that parking issues become evident in Old Trail Village later, available parking opportunities within Block 3 may be explored during the course of future development. Please cont. you have questions. Sin Air K,' Ronald L. Higgins, AICP Chief of Zoning