Loading...
HomeMy WebLinkAboutSDP200900005 Review Comments 2009-02-02pF AL 1 ‘11r DIVA LIRGII3ZF COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: February 2, 2009 Valerie Long — Williams Mullen 321 East Main Street # 400 Charlottesville, VA, 22902. RE: SDP - 2009 -00005 Woodson Property (AT &T- CV393- Crossroads) Dear Madam, The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Planning (Planner ARB) Albemarle County Division of Inspections (Building Official) Virginia Department of Transportation (VDOT). (Pending) Albemarle County Service Authority (ACSA). Albemarle County Geographic and Data Services (GDS) Albemarle County Fire and Rescue Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by Monday February 16th 2009. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, iyazior Gerald Gatobu, Principal Planner County of Albemarle Department of Community Development Current Development 401 McIntire Road Charlottesville, VA 22902 -4596 Phone: (434)296 -5832 Ext 3385 Fax: (434)972 -4126 oC:r RGINIP County of Albemarle Department of Community Development Memorandum To:Valerie Long From:Gerald Gatobu, Principal Planner Division: Zoning and Current Development Date:February, 2 ° 2009 Subject: SDP2009 -00005 Woodson Property AT &T CV393A Tier II PWSF The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the fmal site plan (tower) referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. 5.1.40.a.4.a] The location and dimensions of all existing and proposed improvements on the parcel including access roads and structures, the location and dimensions of significant natural features, and the maximum height above ground of the facility (also identified in height above sea level). Clearly delineate the proposed 20 ft access easement /utility easement on page Al. 2. 5.1.40.a.4.e] Except where the facility would be attached to an existing structure, the topography within two thousand (2,000) feet of the proposed facility, in contour intervals not to exceed ten (10) feet for all lands within Albemarle County and, in contour intervals shown on United States Geological Survey topographic survey maps or the best topographic data available, for lands not within Albemarle County. Please show topography on page A that would help in determining areas of critical slopes (slopes greater than 25 %). Based on my recent field visit (balloon test) it seems like the access to the proposed wireless facility will disturb areas of critical slopes. Please consider applying for a critical slopes waiver. 3. 5.1.40.a.4(f)] The height, caliper and species of all trees where the dripline is located within fifty (50) feet of the facility that are relied upon to establish the proposed height and/or screening of the monopole. All trees that will be adversely impacted or removed during installation or maintenance of the facility shall be noted, regardless of their distances to the facility. Show or note all trees that will be adversely impacted or removed during installation or maintenance of the facility on the site plan. 4. 5.1.40.a.5] Photographs, where possible, or perspective drawings of the facility site and all existing facilities within two hundred (200) feet of the site, if any, and the area surrounding the site. The facility shall not be located so that it and three (3) or more existing or approved personal wireless service facilities would be within an area comprised of a circle centered anywhere on the ground having a radius of two hundred (200) feet.[5.1.40.d.4] 5. 5.1.40.c.2.ii] outdoor lighting for the facility shall be permitted only during maintenance periods; regardless of the lumens emitted, each outdoor luminaire shall be fully shielded as required by section 4.17 of this chapter; 6. 5.1.40.c.3] the total number of arrays of antennas attached to the existing structure shall not exceed three (3), and each antenna proposed to be attached under the pending application shall not exceed the size shown on the application, which size shall not exceed one thousand one hundred fifty two 1152) square inches; Please show /depict the size of the proposed antennas. 7. 5.1.40.c.8] No slopes associated with the installation of the facility and accessory uses shall be created that are steeper than 2:1 unless retaining walls, revetments, or other stabilization measures acceptable to the county engineer are employed. 1 8. 5.1.40.d.8] Metal monopoles shall be constructed so that vertical cables, wiring and similar attachments are contained within the monopole's structure. Please add a note to the site plan confirming that all vertical cables, wiring and similar attachments are contained within the monopole's structure Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext.3385 for further information. 2 Albemarle Cag Service Muth rity Serving *Conserving TO: Gerald Gatobu FROM: Gary Whelan, Civil Engineer DATE: January 15, 2009 RE: Site Plan Technical Review for: Woodson -AT &T CV383 SDP200900005 TM 87 -5B The below checked items apply to this site. X 1. This site plan is not within the Authority's jurisdictional area for: DX A. Water and sewer B. Water only C. Water only to existing structure D. Limited service 2. A inch water line is located approximately distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. 4. An inch sewer line is located approximately distant. 5. An Industrial Waste Ordinance survey form must be completed. 6. No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. X 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: No comment. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org Application #:SDP200900005 Short Review Comments Project Name: Woodson Property(AT &T- CV393- Crossroads) - Prelim Preliminary - Non - residential Date Completed:02/02/2009 Reviewer:Andrew Slack E911 Review Status:No Objection Reviews Comments: NO OBJECTION. Date Completed:01/15/2009 Reviewer:Brent Nelson ARB Review Status:Pending Reviews Comments: An ARB application for this proposal was received on 10/13/08. At the applicant's request, that review was deferred on 10/31/08. An email (posted) has been sent to the applicant asking if the ARB review, as previously submitted, is to be reactivated. Date Completed:01/29/2009 Reviewer:James Barber Fire Rescue Review Status:No Objection Reviews Comments: NO OBJECTION. Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject to field inspection and verification. Date Completed:01/14/2009 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments: NO OBJECTION. Date Completed:01/14/2009 Reviewer:Max Greene Engineer Z &CD Review Status:No Objection Reviews Comments: NO OBJECTION. Page: 1.00 County of Albemarle Printed On: Monday, February 02, 2009 COMMONWEALTH c VIR 1 DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER February 4, 2009 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments February 5 2009 site review meeting Dear Mr. Brooks: Below are VDOT' s comments on the Site Plans for the February 5 2009 Site Review Committee Meeting: SDP - 2009 - 0004 Elledge Property (At &T CV313) Preliminary No Comments. SDP - 2009 - 00005 Woodson Property (AT &T CV383) Preliminary (Gerald Gatobu) Sight distances should be shown on Route 29 at the driveway entrance. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 -293 -0011 WE KEEP VIRGINIA MOVING AreN RTO County of Albemarle Department of Community Development Memorandum To:Gerald Gatobu, Current Development planning and zoning review From:Max Greene, Current Development engineering review Date:19 February 2009 Subject: Woodson Property (SDP200900005) critical slope waiver request The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: This is a 4.217-acre RA zoned parcel in the Batesville area of Route 29 south. The applicant is proposing an approximately 130 -foot access road to a 400 square foot gravel compound for a communication tower. The proposed critical slope disturbance is for the access /maintenance road to the tower location. This disturbance is the shortest but may not be the least obtrusive path to the tower site. Areas Acres Total parcel acreage 4.217 acres approximately Critical slopes on parcel 0.874 20.7% of site Critical slopes disturbed 0.016 1.8% of critical slopes Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: This disturbance is not exempt per Section 18 -42.6. A field visit on 2/20/09 divulged an existing alternate path from the driveway to the tower location that would not disturb critical slopes and still maintain the character of the property and tower site. Compliance with Zoning Ordinance 18 -4.2: movement of soil and rock - Proper slope construction, control of drainage, and vegetative stabilization will prevent any movement of soil. excessive stormwater runoff' Stormwater runoff will not he significantly affected in this area. siltation" Inspection by the County will facilitate siltation control during construction. Proper stabilization and maintenance will ensure long term stability. loss of aesthetic resource" This area is not visible from the road and houses in the area. septic effluent "" This project does not require sanitary service. Based on the review above, engineering believes an alternate access route is available to the tower location that would not create a disturbance of the critical slopes as shown. Application #:SDP200900008 Short Review Comr,. ,;nts Project Name: St Annes- Belfield Lower /Middle School - Final Final — Non - residential — Administrative Date Completed:02/20/2009 Reviewer:Gary Whelan ACSA Review Status:No Objection Reviews Comments: Summer, This email serves to confirm our phone conversation the other day that final construction drawings are, ready to be approved by the Service Authority. Therefore we are prepared to sign the mylars when they are submitted. The ACSA has reviewed the proposed development and has determined that as of this date there is an adequate supply of water and /or adequate sewer capacity to serve the development. Water and /or sewer connections to the ACSA system are allotted on a first -come, first - served basis at the time connection fees are paid. The ACSA does not reserve capacity in its system for a specific project. Approval of water and /or sewer utilities for this project does not constitute a guarantee of future service. Thanks. Pete Date Completed:02/18/2009 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments: Based on plans revised February 10, 2009. No comments or conditions. Precise locations of barrier -free curb cuts will be determined during construction. Date Completed:02/24/2009 Reviewer:Max Greene Engineer Z &CD Review Status:No Objection Reviews Comments: No Engineering concerns at time of review. Site work will be coordinated with the County Erosion Control Officer for this site. Date Completed:02/19/2009 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: Comments based on site plan with revision date of 2/10/09: 1. Revise the Sheet Index on C0.0 to include all the sheets in the site plan set. 2. Add tree protection to C0.4. Ensure that it is coordinated with the landscape plan. 3. Proposed pole lights were not included on C1.0. Show the pole lights, ensure that they do not conflict with utilities and other site elements, and ensure coordination with the lighting plan. i4. The lighting plan includes a pole light at the lower school drop -off that is not shown on the site plan. Coordinate the plans. 5. Trees illustrated on C1.2 - C1.4 and C3.0 are not coordinated with the landscape plan. Coordinate all plans to show a single planting scheme. Page: 1.00 County of Albemarle Printed On: Tuesday, February 24, 2009