COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
DATE: February 2, 2009
Valerie Long — Williams Mullen
321 East Main Street # 400
Charlottesville, VA, 22902.
RE: SDP - 2009 -00005 Woodson Property (AT &T- CV393- Crossroads)
Dear Madam,
The Site Review Committee has reviewed the development proposal referenced above. Preliminary
comments for the following divisions of the Department of Community Development and other agencies,
as applicable, are attached:
Albemarle County Division of Zoning & Current Development (Planner)
Albemarle County Division of Zoning & Current Development (Engineer)
Albemarle County Division of Planning (Planner ARB)
Albemarle County Division of Inspections (Building Official)
Virginia Department of Transportation (VDOT). (Pending)
Albemarle County Service Authority (ACSA).
Albemarle County Geographic and Data Services (GDS)
Albemarle County Fire and Rescue
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that
could affect approval of the proposed project.
Please make the revisions that have been identified as necessary for preliminary approval by the Site
Review Committee. If you choose not to make the requested revisions, please submit in writing
justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17"
copy to the Department of Community Development including responses to each of the attached
comments of the Site Review Committee by Monday February 16th 2009. Failure to submit this
information by this date will result in suspension of the review schedule. Review will resume when
revisions are submitted along with a reinstatement fee of $65.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
iyazior
Gerald Gatobu, Principal Planner
County of Albemarle
Department of Community Development
Current Development
401 McIntire Road
Charlottesville, VA 22902 -4596
Phone: (434)296 -5832 Ext 3385
Fax: (434)972 -4126
oC:r
RGINIP
County of Albemarle
Department of Community Development
Memorandum
To:Valerie Long
From:Gerald Gatobu, Principal Planner
Division: Zoning and Current Development
Date:February, 2 ° 2009
Subject: SDP2009 -00005 Woodson Property AT &T CV393A Tier II PWSF
The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of
the fmal site plan (tower) referred to above once the following comments have been addressed: [Each comment
is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
1. 5.1.40.a.4.a] The location and dimensions of all existing and proposed improvements on the parcel
including access roads and structures, the location and dimensions of significant natural features, and
the maximum height above ground of the facility (also identified in height above sea level). Clearly
delineate the proposed 20 ft access easement /utility easement on page Al.
2. 5.1.40.a.4.e] Except where the facility would be attached to an existing structure, the topography within
two thousand (2,000) feet of the proposed facility, in contour intervals not to exceed ten (10) feet for all
lands within Albemarle County and, in contour intervals shown on United States Geological Survey
topographic survey maps or the best topographic data available, for lands not within Albemarle County.
Please show topography on page A that would help in determining areas of critical slopes (slopes
greater than 25 %). Based on my recent field visit (balloon test) it seems like the access to the
proposed wireless facility will disturb areas of critical slopes. Please consider applying for a
critical slopes waiver.
3. 5.1.40.a.4(f)] The height, caliper and species of all trees where the dripline is located within fifty (50)
feet of the facility that are relied upon to establish the proposed height and/or screening of the
monopole. All trees that will be adversely impacted or removed during installation or maintenance of
the facility shall be noted, regardless of their distances to the facility. Show or note all trees that will
be adversely impacted or removed during installation or maintenance of the facility on the site
plan.
4. 5.1.40.a.5] Photographs, where possible, or perspective drawings of the facility site and all existing
facilities within two hundred (200) feet of the site, if any, and the area surrounding the site. The facility
shall not be located so that it and three (3) or more existing or approved personal wireless service
facilities would be within an area comprised of a circle centered anywhere on the ground having a
radius of two hundred (200) feet.[5.1.40.d.4]
5. 5.1.40.c.2.ii] outdoor lighting for the facility shall be permitted only during maintenance periods;
regardless of the lumens emitted, each outdoor luminaire shall be fully shielded as required by
section 4.17 of this chapter;
6. 5.1.40.c.3] the total number of arrays of antennas attached to the existing structure shall not exceed
three (3), and each antenna proposed to be attached under the pending application shall not exceed the
size shown on the application, which size shall not exceed one thousand one hundred fifty two
1152) square inches; Please show /depict the size of the proposed antennas.
7. 5.1.40.c.8] No slopes associated with the installation of the facility and accessory uses shall be created
that are steeper than 2:1 unless retaining walls, revetments, or other stabilization measures acceptable to
the county engineer are employed.
1
8. 5.1.40.d.8] Metal monopoles shall be constructed so that vertical cables, wiring and similar attachments
are contained within the monopole's structure. Please add a note to the site plan confirming that all
vertical cables, wiring and similar attachments are contained within the monopole's structure
Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext.3385 for
further information.
2
Albemarle Cag
Service Muth rity
Serving *Conserving
TO: Gerald Gatobu
FROM: Gary Whelan, Civil Engineer
DATE: January 15, 2009
RE: Site Plan Technical Review for: Woodson -AT &T CV383
SDP200900005
TM 87 -5B
The below checked items apply to this site.
X 1. This site plan is not within the Authority's jurisdictional area for:
DX A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
2. A inch water line is located approximately distant.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
4. An inch sewer line is located approximately distant.
5. An Industrial Waste Ordinance survey form must be completed.
6. No improvements or obstructions shall be placed within existing or future
easements.
7.and plans are currently under review.
8.and plans have been received and approved.
X 9. No plans are required.
10. Final and plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
13. City of Charlottesville approval for sewer.
Comments: No comment.
The site plan does not show or incorrectly shows:
meter locations water line size
waterline locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthoriy.org
Application #:SDP200900005 Short Review Comments
Project Name: Woodson Property(AT &T- CV393- Crossroads) - Prelim Preliminary - Non - residential
Date Completed:02/02/2009
Reviewer:Andrew Slack E911
Review Status:No Objection
Reviews Comments: NO OBJECTION.
Date Completed:01/15/2009
Reviewer:Brent Nelson ARB
Review Status:Pending
Reviews Comments: An ARB application for this proposal was received on 10/13/08. At the applicant's request, that review
was deferred on 10/31/08. An email (posted) has been sent to the applicant asking if the ARB review,
as previously submitted, is to be reactivated.
Date Completed:01/29/2009
Reviewer:James Barber Fire Rescue
Review Status:No Objection
Reviews Comments: NO OBJECTION. Must comply with the Virginia Statewide Fire Prevention Code. Approval is subject
to field inspection and verification.
Date Completed:01/14/2009
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments: NO OBJECTION.
Date Completed:01/14/2009
Reviewer:Max Greene Engineer Z &CD
Review Status:No Objection
Reviews Comments: NO OBJECTION.
Page: 1.00 County of Albemarle Printed On: Monday, February 02, 2009
COMMONWEALTH c VIR 1
DEPARTMENT OF TRANSPORTATION
CHARLOTTESVILLE RESIDENCY OFFICE
701 VDOT WAY
CHARLOTTESVILLE, VA 22911
DAVID S. EKERN, P.E.
COMMISSIONER
February 4, 2009
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments February 5 2009 site review meeting
Dear Mr. Brooks:
Below are VDOT' s comments on the Site Plans for the February 5 2009 Site Review Committee
Meeting:
SDP - 2009 - 0004 Elledge Property (At &T CV313) Preliminary
No Comments.
SDP - 2009 - 00005 Woodson Property (AT &T CV383) Preliminary (Gerald Gatobu)
Sight distances should be shown on Route 29 at the driveway entrance.
Please request the applicants provide a written description of revisions with re- submissions. If you
have any questions or comments, please contact me prior to sharing these comments with the
applicants.
Sincerely,
Joel DeNunzio, P.E.
Staff Engineer
VDOT Charlottesville Residency
434 -293 -0011
WE KEEP VIRGINIA MOVING
AreN
RTO
County of Albemarle
Department of Community Development
Memorandum
To:Gerald Gatobu, Current Development planning and zoning review
From:Max Greene, Current Development engineering review
Date:19 February 2009
Subject: Woodson Property (SDP200900005) critical slope waiver request
The critical slope waiver request has been reviewed. The engineering analysis of the request follows:
Description of critical slope area and proposed disturbance:
This is a 4.217-acre RA zoned parcel in the Batesville area of Route 29 south. The applicant is proposing
an approximately 130 -foot access road to a 400 square foot gravel compound for a communication tower.
The proposed critical slope disturbance is for the access /maintenance road to the tower location. This
disturbance is the shortest but may not be the least obtrusive path to the tower site.
Areas Acres
Total parcel acreage 4.217 acres approximately
Critical slopes on parcel 0.874 20.7% of site
Critical slopes disturbed 0.016 1.8% of critical slopes
Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable
alternative locations:
This disturbance is not exempt per Section 18 -42.6. A field visit on 2/20/09 divulged an existing alternate
path from the driveway to the tower location that would not disturb critical slopes and still maintain the
character of the property and tower site.
Compliance with Zoning Ordinance 18 -4.2:
movement of soil and rock -
Proper slope construction, control of drainage, and vegetative stabilization will prevent any movement
of soil.
excessive stormwater runoff'
Stormwater runoff will not he significantly affected in this area.
siltation"
Inspection by the County will facilitate siltation control during construction. Proper stabilization and
maintenance will ensure long term stability.
loss of aesthetic resource"
This area is not visible from the road and houses in the area.
septic effluent ""
This project does not require sanitary service.
Based on the review above, engineering believes an alternate access route is available to the tower location
that would not create a disturbance of the critical slopes as shown.
Application #:SDP200900008 Short Review Comr,. ,;nts
Project Name: St Annes- Belfield Lower /Middle School - Final Final — Non - residential — Administrative
Date Completed:02/20/2009
Reviewer:Gary Whelan ACSA
Review Status:No Objection
Reviews Comments: Summer,
This email serves to confirm our phone conversation the other day that final construction drawings are,
ready to be approved by the Service Authority. Therefore we are prepared to sign the mylars when
they are submitted.
The ACSA has reviewed the proposed development and has determined that as of this date there is
an adequate supply of water and /or adequate sewer capacity to serve the development. Water and /or
sewer connections to the ACSA system are allotted on a first -come, first - served basis at the time
connection fees are paid. The ACSA does not reserve capacity in its system for a specific project.
Approval of water and /or sewer utilities for this project does not constitute a guarantee of future
service.
Thanks.
Pete
Date Completed:02/18/2009
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments: Based on plans revised February 10, 2009.
No comments or conditions.
Precise locations of barrier -free curb cuts will be determined during construction.
Date Completed:02/24/2009
Reviewer:Max Greene Engineer Z &CD
Review Status:No Objection
Reviews Comments: No Engineering concerns at time of review. Site work will be coordinated with the County Erosion
Control Officer for this site.
Date Completed:02/19/2009
Reviewer:Margaret Maliszewski ARB
Review Status:Requested Changes
Reviews Comments: Comments based on site plan with revision date of 2/10/09:
1. Revise the Sheet Index on C0.0 to include all the sheets in the site plan set.
2. Add tree protection to C0.4. Ensure that it is coordinated with the landscape plan.
3. Proposed pole lights were not included on C1.0. Show the pole lights, ensure that they do not
conflict with utilities and other site elements, and ensure coordination with the lighting plan.
i4. The lighting plan includes a pole light at the lower school drop -off that is not shown on the site plan.
Coordinate the plans.
5. Trees illustrated on C1.2 - C1.4 and C3.0 are not coordinated with the landscape plan. Coordinate
all plans to show a single planting scheme.