Loading...
HomeMy WebLinkAboutSDP200900005 Calculations 2008-07-011=- N lm U ,..i(tA1+ S r GLOECKNER ENGINEERING /SURVEYING, INC.JOB NAME `r71111ENGINEERSSURVEYORSANDLANDPLANNERSJOBNO • ... C) C) 2246 IVY ROAD, SUITE 11 DATE t 0.,4) 1 `c6 CHARLOTTESVILLE, VA 22902 DESIGNED BY yv‘ Cr IEL: 804-971-1591 SHEET NO.OF FAX: 804 -293 -7612 H.! .` SEDIMENT TRAP DESIGN it 1 Drainage area = 7,9 37 t` 7 acres Min. volume requiredd (Wet and dry combined)ut All traps to be dry temporary storage facilities 134 cy /drainage area = 134 x cy = ( /44 cf Length to width ratio = 2 to 1 Top:Width =ft, length 76 ft Bottom:Width = 3 X, ft, length =_ 3-C.) ft Depth = 4 ft. Volume provided = average top and bottom areas x depth t x ft.ticf f V Min outlet length = 6 x drainage area = 6 x Z:i7 vix: Tr"