Loading...
HomeMy WebLinkAboutSDP200900008 Calculations 2008-07-01� -- �..� �� �.,=� ►�� � ►`�-i� v_r�.,. �►ter � fl � � cam--- :1•U�-�u�r t.. -� GLOECKNER ENGINEERING/SURVEYING, INC. 5j ENGINEERS SURVEYORS AND LAND PLANNERS 2246 IVY ROAD, SUITE 11 CHARLOTTESVILLE, VA 22902 TEL: 804--971--1591 FAX: 804-293-7612 r 4 SEDIMENT TRAP DESIGN JOB NAME JOB NO. C),C:) DATE DES1GN9D SHEET NO.� OF n 1 Drainage area = L;7 7 •`V C acres - -- rain. volume required: (Wet and dry combined) All traps to be dry temporary storage facilities 134 cy/drainage area = 104 x 'b`iVj cy U%4� ci Length to width ratio = 2 to 1 Top: Width = ft, :length = 7 6 ft Bottom: Width = :3 4 ft, length == C? Q ft Depth - ft. Volume provided = average top and bottom areas x depth Ilk 3G44_1j +c?(Lty x ft. 2 4 CO), Lam' Min outlet length = 6 x drainage area = 6 x Z'y ( = 17.x,, -ft.