Loading...
HomeMy WebLinkAboutSDP200800135 Staff Report 2008-10-06ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #: Name ARB- 2008 -123: BB &T Bank (Crozet) Review Type Preliminary Review of a Site Development Plan, Advisory Review for a Special Use Permit Parcel Identification Tax Map 56, Parcel 110 Location On the south side of Route 250 West, west of Blue Ridge Builders Supply, across from Radford Lane in the Blue Ridge Shopping Center. Zoned Highway Commercial (HC), Entrance Corridor (EC) Owner Preston Stallings Applicant BB &T, Bill Harris Magisterial District Whitehall Proposal To construct a new 2,400 square foot BB &T branch bank on Outparcel D in the Blue Ridge Shopping Center. ARB Meeting Date October 6, 2008 Staff Contact Brent Nelson SITE/PROJECT HISTORY July 17, 2008: SP 2008 -28: BB &T Bank Crozet, Drive -thru /ARB 2008 -91: BB &T Bank Crozet, Preliminary Site Development Plan, Advisory Review for a Special Use Permit. Request for indefinite deferral received from applicant. o In this application, the drive -thru facility, with ATM, adjoined the north elevation of the bank, facing the Route 250W EC. After receiving preliminary comments from Current Development and ARB staff indicating the proposed location /layout of the drive -thru did not meet established site plan requirements and ARB guidelines, the applicant requested an indefinite deferral to allow time for a redesign of the site layout. June 16, 2008: SP 2008 -28, BB &T Bank Crozet, application received for a Special Use Permit. ARB staff comments on the SP were provided (see Attachment A). May 9, 2008: ARB 2003 -64: Harris Teeter and Blue Ridge Shopping Center, Amended Site Plan, Approved. September 16, 2003: ARB 2003 -64: Blue Ridge Shopping Center, Final Site Development Plan, Approved. CONTEXT The site under review, Outparcel D, is located in the northwest corner of the Blue Ridge Shopping Center. This shopping center, located across from Radford Lane, adjoins the south side of the Route 250W Entrance Corridor and the west side of Blue Ridge Builder's Supply. Preliminary grading for the entire ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 1 shopping center is currently underway. Perimeter landscaping for Outparcel D was approved with the previously approved Final Site Plan for the shopping center. This section of the EC is characterized by a mixture of development types including the Clover Lawn commercial buildings, Liberty Hall residential condominiums /townhomes (under construction), and the Cory Farms single family subdivision. PROJECT DETAILS The applicant is proposing a 2,400 square foot, one -story branch bank with a 3 lane drive -thru facility adjoining the west end of the building. The outermost (west) lane will provide vehicular access to an ATM machine located on an island 10' from the end of the canopy. Other site improvements will include 32 parking spaces to be situated on all 4 sides of the building and a dumpster pad, with enclosure, in the northwest corner of the site, adjacent to the EC right -of -way. VISIBILITY Proposed site improvements. including the dumpster enclosure, will be highly visible from the Route 250W EC due to their close proximity. Visible building elevations will include the north (side), east front), and west (side) elevations including the proposed canopy structure. Some limited visibility of the proposed ATM machine is expected. ANALYSIS based on drawings submitted: Site plan drawings submitted: Sheet C- I "Cover Sheet ", date June 12, 2007 Sheet C -2 "2003/2004 Erosion Control Plan Amendment ", date June 12, 2007 Sheet C -3 "Storage Area for Blue Ridge Builders Supply ", date June 12, 2007 Sheet C -4 "Sediment Basin Erosion Control Amendment ", date June 12, 2007 Sheet A -1 "Amended Site Plan ", date June 11, 2008 Sheet A -2 "Landscape Site Plan ", date June 13, 2008 Architectural drawings submitted: Rendered Elevations (front, right, rear, & left), date 8/1.5/08 Sheet A3 BB &T Elevations (north, south, east, & west), date 9 /10/08 Sheet "Plan" BB &T Floor Plan, date 9/10/08 Materials submitted: Materials Board: Brick: Boral: Autumn Rose Mortar: Lafarge: Khaki Gutter: Englert: Lo-Gloss White Downspout: Englert: Red EIFS: Senergy: Sahara Finish, Color: Silrerado #600 Building Precast Base: Seaboard Concrete: #7391 with lite acid wash finish Roof: G.A.F. Timberline Series: Timberline Ultra, Color: Slate Blend Door /Window Storefront: YKK: Burn White, 1" tinted, tempered glass Issue Drive -thru Visibility /Canopy Design Comments Sheet Al Amended Site Plant shows the bank building oriented with its side (north) elevation facing the EC and a 3 lane drive -thru adjoining the west elevation of the bank, with the outermost (west) ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 2 lane providing access to an ATM machine. Vehicles would access the drive -thru from the north; therefore, stacking room for vehicles using the facility would be located on the north (EC) side of the canopy. Buildings in the Entrance Corridor are supposed to be oriented to the EC, giving the impression that they face the Corridor. The building in the present layout has its side to the Corridor. The drive -thru and ATM machine are considered service uses and mechanical equipment, which the Entrance Corridor Guidelines indicate should not be visible from the Corridor. In the current layout, the drive -thru would be highly visible from the EC with the ATM having some limited visibility. The forms and colors of the proposed ATM are uncoordinated with the building architecture. Turning the building clockwise 90 degrees would allow the front elevation to address (face) the EC. It would also allow the building itself to more effectively screen views of the drive -thru and ATM. In the proposed location, the roof form of the drive -thru is not appropriate for the Entrance Corridor. Elevation drawings on Sheet A3 show the bank building with a cross gable roof form. The cross gable relationship is created by the north -south primary ridge line that is intersected to the west by the lower gable form of the drive -thru and to the east by the gable form over the bank entrance. The gable form over the drive -thru is 40' longer and 1- 1/2' lower in height than the opposing gable form from the east. Traditional architecture, on which this design is based, is known for its reliance on balance and symmetry. The north (EC) elevation of this proposal has an unbalanced, asymmetrical appearance due to the design of the roof form over the drive -thru. As a result, the drive -thru canopy has too much prominence in the hierarchy of the overall building design. A bank roof form of opposing gables near equal in size and height, with a corresponding drive -thru canopy form that is secondary, and complimentary, in both design and size, would be more appropriate. Recommendations Revise the building /site layout by turning the building clockwise 90 degrees to allow the front elevation to address (face) the Route 250W EC, also allowing the building itself to more effectively screen views of the drive -thru and ATM. If the drive -thru is approved in its current location, revise the bank design by providing a bank roof form of opposing gables near equal in size and height, with a corresponding drive -thru canopy form that is secondary, and complimentary, in both design and size. Issue: Interior Landscaping/ Perimeter Landscaping/Drive -thru Comments: Sheet Al Landvcape Plan shows perimeter landscaping previously approved with the review of the shopping center; however, with the exception of 4 London Plane trees (Willow Oak alternate) in planting islands around the bank, the drawing does not show proposed landscaping interior to Outparcel D. The location of trees and shrubs in the rendered elevations provided with this submission does not correspond with the locations on Sheet A 1 Landscape Plan. A landscape proposal for Outparcel D, addressing all ARB guidelines, should be included with the next submission. Guidelines to be addressed include the need for: 1 tree per 10 parking spaces provided, 2 '/2" caliper minimum at planting, evenly distributed throughout the parking area. Shrubs, 24" minimum at planting, to integrate the site, buildings, and accessory structures. EC frontage landscaping, approved with the review of the shopping center, includes London Plane trees Willow Oak alternate), 3 1 caliper, 35' on center, with English Spreading Yew, Green Luster Holly, and William Peim Barberry shrubs, 24" tall at planting, interspersed for the full width of the frontage. Approved landscaping along the western perimeter of this proposal includes Pin Oaks, 2 '/2" caliper, 40' on center, with Eastern Red Cedar, 4' — 5' tall at planting, 10' on center, in between the Oaks. The quantity and mature height (2' to 4') of the shrubs proposed along the EC frontage is inadequate for screening views of the drive -thru. The identity of individual shrub types cannot be determined due to the ARB 10/6/2008 BB &T C Blue Ridge Shopping Center, Preliminary - Page 3 lack of adequate labeling on the drawing. The planting design along the western perimeter appears to be adequate for screening views of the drive -thru. Recommendations: Revise Sheet A -1 Lundscal)e Plan to show proposed landscaping, interior to Outparcel D, which addresses all ARB guidelines. Guidelines to be addressed include the need for: 1 tree per 10 parking spaces provided, 2 ' /z" caliper minimum at planting, evenly distributed throughout the parking area. Shrubs, 24" minimum at planting, to integrate the site, buildings, and accessory structures. Revise the drawing to clearly indicate the species of individual shrubs in the vicinity of Outparcel D. Revise the rendering provided with this submission to accurately show the location of proposed trees and shrubs. If the drive -thru is approved in its current location, revise Sheet A -1 Landscape Plan by providing evergreen shrubs along the EC frontage, with mature heights of 5' minimum, in adequate numbers to mitigate views of the drive -thru. Issue: Windows Comments: The north (EC) elevation drawing on Sheet A3 shows 3 tall windows equally spaced under the pediment. The window centered beneath the louvered gable vent, and the adjacent window to the right west), are proposed as false windows with spandrel glass. A sample of the spandrel glass was not included with this submission. The building floor plan, included with this submission, shows the bank vault and teller work area located behind these false windows. The east elevation drawing on Sheet A3 shows 2 tall windows to the left (south) of the glass doors that are the main entrance to the batik. The window immediately to the left (south) of the main entrance is proposed as a false window with spandrel glass. The building floor plan, included with this submission, shows the electrical utility room located behind this false window. False windows reinforce the "back of building" character that is not appropriate for the EC. The ARB has been reluctant in the past to approve false windows that are visible from the EC because of their simulated /mock appearance. Revising the floor plan, by placing the bank vault and teller work room on the south side of the building, could allow for real windows in the north elevation facing the EC. Relocating the electrical utility room or redesigning its interior could allow for real windows in the room's current location in the east elevation. The materials board, included with this submission, indicates that 1" tinted, tempered glass is proposed for the doors and windows. The ARB has been reluctant in the past to approve glass with a reflectance value greater than 7 %. A sample of the proposed material should be provided. Recommendations: Revise the north and east elevations on Sheet A3 to clearly indicate that all windows are real windows. This may necessitate flipping the floor plan to allow the bank vault and teller work areas to be located on the opposite (south) side. It may also require relocating the electrical utility room or redesigning its interior to allow for real windows in the room's current location. Provide a sample of the glass proposed for all windows and doors along with a cut sheet indicating that it reflectance value does not exceed 7 %. Revise Sheet A3 to include a note indicating the reflectance value of the glass. Issue HVAC Enclosure /As Viewed From EC Comments Sheets Al Amended Site Plan, A3 Interior Elevation — North and A3 Interior Elevation — West show the location of a 12' long, 5' wide, 3' tall brick HVAC enclosure in the west corner of the north (EC) elevation. The drawings are not labeled to identify this use. The dimensions (width, height) of the proposed HVAC equipment were not included on the drawings. The drawings do not indicate if the brick for the enclosure is to match the brick in the building, which would be appropriate. The grading contours on Sheet Al appear to indicate that the grade beneath the HVAC enclosure would be approximately 8' lower in elevation than the adjacent EC. As a result, the proposed 3' height of the enclosure would appear to be insufficient to block EC views of the equipment. The HVAC enclosure is a utilitarian use, partially blocking EC views of the tall windows at the west end of the north (EC) ARB 10/6/2008 BB &T C Blue Ridge Shopping Center, Preliminary - Page 4 elevation. The result is a lack of symmetry in building design /appearance as viewed from the EC. Relocating the HVAC units and enclosure to the south elevation would eliminate their visibility, allowing for a symmetrical appearance in the north (EC) elevation. Recommendations Revise all applicable site and building drawings by relocating the HVAC units and enclosure to the south elevation, so as to eliminate their visibility from the EC. Revise the north (EC) elevation by showing the westernmost window extended to the ground to match the others. Issue Dumpster Enclosure /Location Comments Sheet Al Amended Site Plan shows a proposed dumpster enclosure in the northwest corner of the site, adjacent to the EC right -of -way. This location is too close to the Corridor and will be highly visible. The dumpster is considered a service feature that should be located on the site where its appearance from the EC, if any, would be limited. Recommendations Revise Sheet A -1 Amended Site Plan and Sheet A2 Landscape Plan by relocating the proposed dumpster enclosure to an area on the site where its visibility from the EC, if any, would be limited. Issue Building Materials/Product ID Comments A display board containing proposed building materials and colors was included with this submission. The contents of that display were listed earlier in this report. The materials and colors, as presented, blend with and compliment each other as well as the materials and colors approved for other buildings in the shopping center . The result is an appearance that is appropriate for the EC. Recommendations None. Issue: Building Signage Comments: Signage details were not included with this submission. Elevation drawings on Sheet Al show a wall sign BB&T in the north corner of the east elevation and the south corner of the west elevation. Overall sign text dimensions are 6' in length and 2' in height. The applicant has verbally indicated that the letters would either be all red or all white with internal illumination. As previously mentioned the ATM machine, proposed underneath the canopy, is expected to have some limited visibility from the EC. The ATM machine is considered equipment that should not be visible from the EC, and the standard treatment of the ATM unit (colored stripes) acts as Signage. Detailed drawings of the ATM equipment should be provided with the next submission. Proposed colors and details of the ATM equipment should be coordinated with the design of the building. Recommendations: Provide details of all proposed building Signage, and details of the proposed ATM equipment. All signage shall meet established ARB Sign Guidelines and provide a coordinated appearance with the building design. Issue: Lighting Comments: A lighting photometric plan with lighting cutsheets was not included with this submission. Recommendations: Provide a lighting photometric plan showing the location of all proposed site, building and decorative lighting. Provide a luminaire schedule of all proposed exterior lighting. Indicate in the schedule all lighting options chosen, and the colors proposed for the fixtures and poles. All proposed lighting exceeding the 3,000 lumens threshold shall be a full cutoff design. Lighting values shall not exceed 1 /2 foot candle at a public right -of -way line or at a property line adjoining a residential or rural area district. SUMMARY OF RECOMMENDATIONS ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 5 Staff recommends the following as the primary points of discussion: 1. The location (visibility) of the proposed drive -thru facility in relation to the Entrance Corridor. 2. The design of the drive -thru canopy. 3. The design of the north (EC) elevation, including the HVAC enclosure, and the use of false windows. Re ag rdin thehe request for a Special Use Permit: Staff recommends that the ARB forward the following recommendation to the Planning Commission: The ARB cannot support the applicant's request for a Special Use Permit for a drive -thru window due to the close proximity of this use to the EC and the insufficient planting design for mitigating its appearance. Staff offers the following comments on the preliminary site plan: I. Revise the building /site layout by turning the building 90 degrees to allow the front elevation to address (face) the Route 250W EC, also allowing the building itself to more effectively screen views of the drive -thru and ATM. If the drive -thru is approved in its current location, revise the bank design by providing a bank roof form of opposing gables near equal in size and height, with a corresponding drive -thru canopy form that is secondary, and complimentary, in both design and size. Revise Sheet A -1 Landscape Plan to show proposed landscaping, interior to Outparcel D, which addresses all ARB guidelines. Guidelines to be addressed include the need for: 1 tree per 10 parking spaces provided, 2' /z" caliper minimum at planting, evenly distributed throughout the parking area. Shrubs, 24" minimum at planting, to integrate the site, buildings, and accessory structures. Revise the drawing to clearly indicate the species of individual shrubs in the vicinity of Outparcel D. Revise the rendering provided with this submission to accurately show the location of proposed trees and shrubs. If the drive -thru is approved in its current location, revise Sheet A -1 Landscape Plan by providing evergreen shrubs along the EC frontage, with mature heights of 5' minimum, in adequate numbers to mitigate views of the drive -thru. 3. Revise the north and east elevations on Sheet A3 to clearly indicate that all windows are real windows. This may necessitate flipping the floor plan to allow the bank vault and teller work areas to be located on the opposite (south) side. It may also require relocating the electrical utility room or redesigning its interior to allow for real windows in the room's current location. Provide a sample of the glass proposed for all windows and doors along with a cut sheet indicating that it reflectance value does not exceed 7%. Revise Sheet A3 to include a note indicating the reflectance value of the glass. 4. Revise all applicable site and building drawings by relocating the HVAC units and enclosure to the south elevation, so as to eliminate their visibility from the EC. Revise the north (EC) elevation by showing the westernmost window extended to the ground to match the others. 5. Revise Sheet A -1 Amended Site Plan and Sheet A2 Landscape Plan by relocating the proposed dumpster enclosure to an area on the site where its visibility from the EC, if any, would be limited. 6. Provide details of all proposed building signage, and details of the proposed ATM equipment. All signage shall meet established ARB Sign Guidelines and provide a coordinated appearance with the building design. ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 6 Provide a lighting photometric plan showing the location of all proposed site, building and decorative lighting. Provide a luminaire schedule of all proposed exterior lighting. Indicate in the schedule all lighting options chosen, and the colors proposed for the fixtures and poles. All proposed lighting exceeding the 3,000 lumens threshold shall be a full cutoff design. Lighting values shall not exceed 1 /2 foot candle at a public right -of -way line or at a property line adjoining a residential or rural area district. ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 7 pF A : tly IRGIN Attachment A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 MEMORANDUM TO: Megan Yanigloss FROM: Brent Nelson RE: Design Planning comments on: SP 2008 -28: BB &T Bank at Blue Ridge Shopping Center, Drive -thru DATE: August 5, 2008 I have reviewed the Special Use Permit application for the above referenced proposal (Rendered Building Elevations BB&T E.vtefiol Elevations, date 6/10/08, Site Plan Sheets Al Amended Site Plan and A2 Landscape Site Plan, date 7/16/08), and I have the following comments: This proposal was originally scheduled for ARB review on August 4, 2008 and was deferred at the applicant's request, to allow additional time for revising the site layout. A revised ARB submission has not been received, so the project is not currently scheduled for ARB review. A complete staff report assessing impacts on the Entrance Corridor will be available after the resubmittal. ARB comments on the Special Use Permit will be provided after the ARB meeting. Staff can provide some preliminary comments at this time. Issue: Proposed Drive- thru/ATM Machine/Dumpster/Proximity and Orientation to Entrance Corridor Comments: Buildings in the Entrance Corridor are supposed to be oriented to the EC, giving the impression that they face the Corridor. The building in the present layout has its back to the Corridor. The Drive -thru and ATM machine are considered service uses and mechanical equipment, which the Entrance Corridor Guidelines indicate should not be visible from the Corridor. In the current layout, they face the EC. The forms and colors of the proposed ATM are uncoordinated with the building architecture. Turning the building 180 degrees would allow the front building elevation to address (face) the EC. It would also allow the building itself to more effectively screen views of the drive -thru and ATM. The proposed dunmpster enclosure is located too close to the Corridor and will be highly visible. This is considered a service feature that should be located farther from the EC in order to mitigate its appearance. Recommendations: Staff will not recommend approval of the proposal in its current layout, because it does not conform to established Entrance Corridor Guidelines. ARB 10/6/2008 BB &T @ Blue Ridge Shopping Center, Preliminary - Page 8