Loading...
HomeMy WebLinkAboutARB201600030 Action Letter 2016-04-21COUNTY OFALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone 434 296-5832 April 22, 2016 Vito Cetta CIO Spring Hill Land Development 1730 Owensville Dr Charlottesville Va 22901 RE: ARB201600030 Spring Hill Village Blocks C and E (architecture) Fax (434) 9724126 Dear Mr. Cetta, The Albemarle County Architectural Review Board, at its meeting on April 18, 2016, completed a review of the above -noted application. The Board unanimously approved the request, pending staff administrative approval of the following conditions: 1. Note for future submittals that the Block A building will need to address EC Guidelines requirements for scale, proportion, massing, detailing, lack of blankness, etc. A "back of building" appearance will not be appropriate for elevations visible from Rt. 20. 2. Add the standard window glass note to the architectural drawings. Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications on the proposed window glass should be submitted with the application for final review. 3. A screening fence detail indicating size, material and color is needed in the plan. Vinyl with a shiny surface is not an appropriate material for this fence. 4. Add the standard mechanical equipment note to both the site and architectural plans. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 5. Revise the plant schedule to identify all proposed plants by species. 6. Revise the plans to clearly show all utility lines with their associated easements. Provide sufficient planting area, free of utilities and easements, along both ECs. Provide documentation from easement holders that there is no objection to the planting as proposed. 7. Clarify the extent of tree removal and tree replacement planned with off -site work along the ECs. Show how an appropriate appearance for the EC will be maintained. 8. Provide 2'/2" caliper large trees, spaced 40' on center, at the perimeter of the parking lot located at Road C. Also provide 5 interior parking lot trees at 2%" caliper. 9. Provide shrubs, minimum 24" high at planting, on the south side of the parking lot at Road C, to screen the parked cars as viewed from the EC. 10. Revise the plant schedule to identify all proposed plants by species. 11. Add the standard plant health note to the plan. 12. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 13. Provide material and color samples for the retaining walls. Indicate material and color on the site plan. 14. Revise the plan to show a temporary landscape treatment for the sediment basin located at the northeast corner of the property to establish an appropriate appearance for the EC. 15. Clarify phasing on the plan, including related landscape development. 16. Add landscaping on the terrace between the retaining walls along Avon Street to further screen the rear of those units. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal' form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. IY13 PROJECT NAME: DATE: ARB-2016-30 Spring Hill Village Blocks C and E Submittal Type Requiring Revisions () indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E&S) Mitigation Plan MP Waiver Reguest WR Stormwater Management Plan (S WMP Road PIan RP Private Road Request, with private/public comparison (PRR) Private Road Request — Development Area (PRR-DA Preliminary Site Plan (PSP) Final Site Plan or amendment) FSP Final Plat FP Prelimin Plat (PP) Easement Plat (EP) Bound Adjustment Plat BAP Rezoning Plan (REZ Special Use Permit Concept Plan (SP-CP Reduced Concept Plan (R-CP) Proffers P Bond Estimate Request BER Draft Groundwater Management Plan D-GWMP) Final Groundwater Management Plan F-GWMP Aquifer Testing Work Plan ATWP Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB-2016-30 1 Other: Please explain For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 M. Maliszewski