Loading...
HomeMy WebLinkAboutSUB201400212 Checklist - Project Closeout (Administrative) 2015-07-27SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action, place in folder and forward to CDA FOR QC and status label. CDA will forward to the Imaging Center for digital closeout. 4iS--UJB 201V •60212.. PROJECT TITLE RAS , t- gip(] FULL NAME OF LEAD REVIEWER----- - -tLU� J2 FINAL ACTION DATE: ------------------------------------------------ ---------------------- ---------------------------- ounty Iew — --------------- - - ------------------------------------- ❑Application, Page 2 Data Entered y�` 000 DV E ❑ Staff Report, Ground Water Assessment, or other documents placed in "Docs & Pics" ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order (latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Lead Reviewer has the discretion to inclu e any item deemed necessary to provide clarity to the file, please indicate that item on the "Other" lines provid Digital Closeout Instructions: Below each item ple to i maging Center is to scan the document; or, if the document is already in digital format, can a ed to LaserFiche. Please provide the digital location (path/name) of the document in the space provided. ❑ Engineering Folder Information/documentation ❑ Scan ❑ Saved location ❑ Application (signature copy) ❑ Scan ❑ Saved o ati ❑ Public Notification records/Abut ' correspo ence ❑ Scan aved cation ❑ Applicant Correspondenc (to/ mos /e ails) ❑ Scan Saved locat' ❑ Complete set of prin ew Comme ❑ Scan Saved cation ❑ Approved plan/ p signed, or stam d "Approved" with Planner/Engineer name) El Sc ❑ Sa d location ❑ Action erinistrative A roval) ❑ can aved location ❑ Whl e- PC/BOS M ting Package- Staff Report (include plan/plat presented, PC/BOS Action Letter) Scan Saved location ❑ Groun ater Assessments ❑ Scan ❑Saved location ❑ Other (Please explain — i.e Studies) ❑ Scan ❑ Saved location ❑ Other (Please explain — i. Studies) ❑ Scan ❑ Saved location ❑ At the planner's discretion, copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. El Scan ❑ Saved location Auaitlonal Information on this project: ---------- Planning Commission Minutes — may be obtained online or by contacting PC Recording Secretary ♦ Board of Supervisor Minutes — may be obtained online or by contacting the Clerk of BOS ♦ Construction Documents — will be added to this folder after completion of project. Prior to completion, --------------- documents may be obtained by contacting the Countv Engineer NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label (same font & label color as project label) placed under the project label to reflect current project status and date; 3) Documents are Acco-fastened (except plats/plans), and in chronological order (latest documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete, Imaging Center staff will circle the incomplete item and return folder to the Chief of Planning for corrective action. Issued 2/7/2008, Revised 4/1/2008, Revised 7/1/2009, Revised 2/9/2010, Revised 10-29-2012