HomeMy WebLinkAboutWPO201300029 Bond Estimates 2016-04-28 (2)Project Name: Albrecht Place WPO file number: wpo201300029 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") aggregate base or drainage stone 15.0 in d 1 ES -1,2 12.0ind 90.0ftL trees shrubs seedlings underdrain (LF) biofilter soil mix (Cl) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) No. Unit Unit Cost Cost installed 0 ft $13.00 $0.00 1 ea $500.00 $500.00 0 ea $3,500.00 $0.00 12 ft $450.00 $5,400.00 1 EC -1 370.0 ft $35.00 $13,950.00 33.0 ft W 207.9 ton $35.00 $7,276.50 11 ea $150.00 $1,650.00 31 ea $50.00 $1,550.00 0 ea $5.00 $0.00 240 ft $5.00 $1,200.00 305 cy $38.00 $11,590.00 1 ea $1,500.00 $1,500.00 0 ft $50.00 $0.00 0.0 ft 0 $60.00 $0.00 1 $1,000.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 0 ea $5,000.00 $0.00 $0.00 cost sum $50,116.50 contingency $5,011.65 Total $55,130 4/28/2016 Project Name: Albrecht Place WPO file number: WP0201300029 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) stablization (PS, TS) 3.4 acres $5,000.00 $17,000.00 silt fence (SF) 700.0 ft $5.00 $3,500.00 safety fence (SAF) 800.0 ft $5.00 $4,000.00 diversion (DD, FD, RWD) 860 ft $13.00 $11,180.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for trap/basin #1 height of dam at toe 2 ft cut at high side 6 ft height of fill at face 2 ft cut at face 4 ft length of dam 100 ft length of cut 109 ft top width 4 ft width of cut 12 ft (area above transition) 16 sf (area below transition) 80 sf (total width of dam) 4 ft (total width of cut) 32 ft (height below transition) 0 ft (depth below transitior 2 ft (area below transition) 0 sf (area above transition 28 sf (total fill volume) 59.3 cy (total fill volume) 436.0 cy length of spillway 7.5 ft (TOAL CY estimate) 456 cy $13.00 $5,928.00 width of spillway 18 ft (spillway stone tons) 7.8 tons $50.00 $390.00 earthwork for trap/basin #2 height of dam at toe 0 ft cut at high side 3 ft height of fill at face 0 ft cut at face 3 ft length of dam 0 ft length of cut 100 ft top width 4 ft width of cut 33 ft (area above transition) 0 sf (area below transition) 117 sf (total width of dam) 0 ft (total width of cut) 45 ft (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 433.3 cy length of spillway 10 ft (TOAL CY estimate) 433 cy $13.00 $5,629.00 width of spillway 15 ft (spillway stone tons) 8.6 tons $50.00 $430.00 silt fence inlet protection (I P) 10 $100.00 $1,000.00 stone inlet protection (IP) 0 $200.00 $0.00 outlet protection (OP) length 10 ft width 8 ft 3 $360.00 $1,080.00 channel (SCC, matted) length 0 ft width 0 ft $0.00 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 construction entrance (CE) 1 $2,000.00 $2,000.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 0 $3,500.00 $0.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 tons $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 3 traps and basins 2 $2,500.00 mobilization $500.00 stream crossing (computed independently) $0.00 cost sum $57,137.00 4/28/2016 Project Name: Albrecht Place WPO file number: WPO201300029 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed contingency $5,713.70 Total $62,860 4/28/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = hl(2h1) + hl(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width m point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)