HomeMy WebLinkAboutARB201600055 Review Comments 2016-05-05•
� I I I;j�;l ij
1
141
la
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4012
May 5, 2016
Adria Sprouse
2165 Seminole Trail
Charlottesville, VA 22901
RE: Rejection of Application: ARB 201600055, Lelo's Pizza sign
Dear Adria,
We have received the above -referenced application for a county -wide Certificate of Appropriateness. We
are unable to accept your application because the following items were missing from your submittal:
1. A note stating the Standard color ID for the face of the letters.
2. A note stating that the raceway will match the fascia/sign band..
3. A note specifying that "The level of illumination provided by the LED lights will not exceed the
illumination produced by a single stroke of 30 milliamp (ma) neon."
4. A section of the sign including the channel letters and the raceway (see attached sign example).
Also, there is a Comprehensive Sign Plan (CSP) for Rivanna Ridge Shopping Center, which I have
attached. The following items in the Lelo's Pizza submission do not adhere to the CSP. In order to have
the fee waived (as you specified on the application), and be approvable by staff, the sign must meet all the
CSP criteria. The following items do not adhere to the CSP:
1. The letter face color needs to be Red (Acrylic 2793; Pantone 187)
2. The trim cap color need to be Red
3. The return color need to be Red
I've also attached an example of an approved submittal for this type of sign within the same shopping
center for your reference.
Within 15 days of the date of this letter, you may resubmit the application with all of the information
required by the ARB Checklist for a sign permit. The date of the next submittal deadline following the
date that the revised submittal is received by the County will be considered the new submittal date. If you
fail to resubmit within the 15 day period, the application shall be denied and a new application and fee
will be required.
If you have any questions about this process, feel free to contact me.
cc: ARB -2016-55