Loading...
HomeMy WebLinkAboutWPO201500047 Permit 2015-12-17 • Nose Request for Pre-construction Meeting and Grading Permits from Albemarle County ! pri Approved Plan Number: WPO- Z O/S - do 0i/7 Approved Plan Name: The /%n71; Pr VC (Plans must be approved prior to a pre-construction meeting.) Bond approved date: /Z//7//5 (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: MC/1/4Y/ Wig 0 v7 State Certification Number: 40 0296/ 112:Z-3 Address `/2- I/3r/ov/ke �`Q/� lel City f iq/4 Y/t' t��7/� State Os Zip 2213,4 Daytime Phone(%3V ) VL ' 7�/Y E-mail /?A Garifir#4#110/Coe Primary Contractor: /J Print Name ilder'L O Jin gni .64,h-v 1IV Address %'2Z3 fariy�"✓I��G gel City /if//7Sl/IL/( 0 State Of Zip Li9 3,4 Daytime Phone(J) �(p�-4/1,9 E-mail it aka rIerr&jm'// Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of3