WPO201500102 Plan - VSMP 2016-01-28
GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIT' .1RM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE - CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONTRUCTION INDUSTRY (29 CFR PART 1926). 10. WORK WITHIN THE LOCAL RIGHTS-OF-WAY SHALL CONFORM TO LOCAL MUNICIPAL STANDARDS. WORK WITHIN STATE RIGHTS-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS FOR HIGHWAYS AND BRIDGES. 11. USE SELECT MATERIAL UNDER BUILDINGS AND STRUCTURES; USE FILL AND BACKFILL MATERIAL UNDER PARKING AREAS, ROADS, SIDEWALKS, AND OTHER CONCRETE AND PAVED SURFACES; USE COMMON FILL MATERIAL FOR GENERAL SITE GRADING. PLACE MATERIAL IN 6" LIFTS. 12. COMPACT LAYERS OF FILL TO 95 PERCENT BY MODIFIED PROCTOR METHOD PER ASTM D 1557 BENEATH AND WITHIN 15 FEET OF BUILDINGS AND BY STANDARD PROCTOR METHOD PER ASTM D 698 BENEATH AND WITHIN DETENTION POND EMBANKMENTS, PAVEMENTS, WALKS, AND ROAD SHOULDERS, INCLUDING AREAS THAT MAY BE USED FOR FUTURE CONSTRUCTION. IN OTHER UNPAVED AREAS, COMPACT 90 PERCENT BY STANDARD PROCTOR METHOD PER ASTM D 698. IF THE DENSITY OF THE ADJACENT SOIL IS MORE THAN THE DENSITY SPECIFIED, THEN COMPACT TO A DENSITY NOT LESS THAN THE DENSITY OF THE ADJACENT SOIL. 13. AREAS ON WHICH FILL IS TO BE PLACED SHALL BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL. SOIL MATERIALS SHALL BE FREE OF DEBRIS, ROOTS, WOOD, SCRAP MATERIAL, VEGETATION, REFUSE, SOFT UNSOUND PARTICLES, AND FROZEN DELETERIOUS OR OBJECTIONAL MATERIALS. THE MAXIMUM PARTICLE DIAMETER SHALL BE ONE-HALF THE LIFT THICKNESS. COMMON FILL MATERIAL SHALL BE UNCLASSIFIED SOIL MATERIAL WITH THE CHARACTERISTICS REQUIRED TO COMPACT TO THE SOIL DENSITY SPECIFIED FOR THE INTENDED LOCATION. BACKFILL AND FILL MATERIAL: ASTM D 2487. CLASSIFICATION GW, GP, GM, GC, SW, SP, SM, SC WITH A MAXIMUM ASTM D 4318 LIQUID LIMIT OF 35, MAXIMUM ASTM D 4318 PLASTICITY INDEX OF 12, AND MAXIMUM OF 25 PERCENT BY WEIGHT PASSING ASTM D 1140, NO. 200 SIEVE. SELECT MATERIAL: ASTM D 2487, CLASSIFICATION GW, GP, SW, SP WITH A MAXIMUM 10 PERCENT BY WEIGHT PASSING ASTM D 1140, N0, 200 SIEVE. 14. ALL FINISHED GRADING, SEEDING AND SODDING SHALL BE DONE IN SUCH A MANNER TO PRECLUDE THE PONDING OF THE WATER ON THE SITE, PARTICULARLY ADJACENT TO THE BUILDINGS OR STORM INLETS. 15. CUT AND PATCH WORK IN EXISITING PUBLIC STREETS MUST BE PERFORMED IN ACCORDANCE WITH VDOT AND ALBEMARLE COUNTY STANDARDS AND SPECIFICATIONS. 16. ALL EXISTING CURB AND GUTTER ALONG THE FRONTAGE OF THIS SITE IN POOR CONDITION OR DAMAGED DURING CONSTRUCTION SHALL BE REMOVED AND REPLACED TO THE STANDARDS AND SPECIFICATIONS OF ALBEMARLE COUNTY. 17. IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE ENCOUNTERED DURING EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL, OLFACTORY, OR OTHER EVIDENCE, THE CONTRACTOR SHALL STOP WORK IN THE VICINITY OF THE SUSPECT MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL NOTIFY THE OWNER IMMEDIATELY SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN. STORM WATER MANAGEMENT NOTES THE SUBJECT PARCEL, TAX MAP 32 PARCEL 41D1, IS SERVED BY TWO UNDERGROUND DETENTION FACILITIES TO CONTROL OUTFLOW VOLUME, AND BY THE PURCHASE OF 1.28 LBS/YEAR OF NUTRIENT CREDITS TO TREAT PHOSPHOROUS RUNOFF. THE ORIGINAL SITE DESIGN CALLED FOR TREATMENT BY THE REGIONAL FACILITY, BUT DUE TO CONCERNS ABOUT DOWNSTREAM CHANNEL, AND DUE TO THE LACK OF COMPLETION OF THE REGIONAL STORMWATER MANAGEMENT FACILITY, THE SUBJECT PARCEL WILL BE SERVED ON-SITE TO THE GREATEST PRACTICAL EXTENT. THIS PLAN ALSO AMENDS THE STORM WATER MANAGEMENT DESIGN FOR HOLLYMEAD TOWNCENTER BLOCK C9. PROFFERS FOR THAT AREA REQUIRED ADDITIONAL WATER QUALITY TREATMENT ABOVE AND BEYOND THE REGIONAL BASINS. THE APPROVED SITE PLAN FOR BLOCK C9 SHOWS A WATER QUALITY SWALE RUNNING BETWEEN BLOCK C9 AND PARCEL 41D1. THIS SWALE HAS BEEN REPLACED BY A FILTERRA BOX DESIGNED TO CAPTURE THE APPLICABLE DRAINAGE AREA AND IS RATED WITH A HIGHER REMOVAL RATE (65%) THAN THE PREVIOUS DESIGN OF THE WATER QUALITY SWALE. APPROVED PROFFER NOTES ZMA NO. 2007-0002 APPROVED ON 11/02/2009 WITH PROFFER CONDITIONS OUTLINED BELOW: 1. The uses of the Property permitted by right shall be only those uses allowed by right under Section 25.2.1 except for the following C-1 (Section 22.2.1), CO (Section 23.2.1) and HC (Section 24.2. 1) uses permitted in the PDSC zoning district by reference under Section 25.2. 1 (1), as all of those sections of Chapter 18, Zoning, of the Albemarle County Code, are in effect on December 9, 2009, copies of which are attached hereto and incorporated herein as Attachment A: A. Cemeteries: Sections 22.2.1(b)(3), 23.2.1(4), 24.2.1(5) B Fire and rescue squad stations: Sections 22.2.1(b)(6), 24.2.1(13) C. Indoor theaters: Sections 22.2.1 (b)(9), 24.2.1 (38) D. Libraries, museums: Sections 22.2.1 (b)(12), 23.2.1(5) E. Automobile service stations: Sections 22.2.1 (b)(16), 24.2.1 (3) F. Automobile, truck repair shop, excluding body shop: Sections 22.2.1 (b)(22), 24.2.1 (2) G. Hotels, motels and inns: Section 24.2.1 (20) H. Mobile home and trailer sales: Section 24.2.1 (23) I. Modular building sales: Section 24.2.1 (24) J. Motor vehicle sales, service and rental: Section 24.2.1 (25) K. Building material sales: Section 24.2.1(4) L. Light warehousing: Section 24.2.1 (2J) M. Machinery and equipment sales, service, and rental: Section 24.2.1 (22) N. Sale of major recreational equipment and vehicles: Section 24.2.1 (32) 0. Wholesale distribution: Section 24.2.1(34) P. Heating oil sales and distribution: Section 24.2.1 (39) 2. The uses of the Property permitted by special use permit shall be those uses allowed by special use permit under Section 25.2.2 of Chapter 18, Zoning, of the Albemarle County Code, as that section is in effect on December 9, 2009, a copy of which is attached hereto and incorporated herein as Attachment B. V5MF FOR TIM15ERWOOD COMMON5 TAX MAP 32, PARCEL 4 I D I AMENDS WPO 2012-00062 VICINITY MAP SCALE: 1"-1,000' IMAGE PROVIDED BY GOOGLE MAPS SHEET INDEX C I - COVER SHEET / NOTES C2 - EXISTING CONDITON5/DFMO PLAN C3 - SITE PLAN * UTILITY PLAN �4��,d2�zAN --- 05 - EROSION 5EDIMENT CONTROL PLAN C6 - EROSION SEDIMENT CONTROL- NARRATIVE C7 - STORM PROFILES * EROSION DETAILS SHEET C8 - STORM SEWER DETAILS �-9—�TG�+F+P�6ANI �- SlkM �;� TcS— LEGEND EXIST NEW DESCRIPTION X 16` TC x 125 TC TOP OF CURB ELEVATION 165 X 125 SPOT ELEVATION X 16' TW x 125 TW TOP OF WALL ELEVATION X 16`' BW X 125 BW BOTTOM OF WALL ELEVATION BENCHMARK ® STORM SEWER RD ROOF DRAIN SEWER LINE 6"W WATER LINE 0��� TH OF Tl -- 0 G — GAS LINE t HE OHE- OVERHEAD ELECTRIC WIRE O vJU 'I'l SHIMP a — UC -.E— UGE UNDERGROUND ELECTRIC L1c. NO. F OVERHEAD TELEPHONE LINE ` w� OHi OHT UGT UGT UNDERGROUND TELEPHONE LINE NAL DRAIN INLET (DI) APPROVED 0 0 STORM/SANITARY MANHOLE by theAll7eem rle Courly Community Development Dep^;"Imen" C C PLUG Date ® WATER VALVE & BOX File _-.P., -77 01_1. C'- f � t [� 2 Y FIRE HYDRANT cV ®"' WATER METER a-© LIGHT POLE -4- UTILITY POLE rE� o PROPERTY LINE 0 — - - — ADJACENT PROPERTY LINE VACATED PROPERTY LINE BUILDING SETBACK PARKING SETBACK SANITARY EASEMENT GRADING EASEMENT DRAINAGE EASEMENT UTILITY EASEMENT --- ® - WATER EASEMENT ACCESS EASEMENT STORM DRAINAGE EASEMENT NOTE: 1. THE SIZE OF THE SYMBOLS MAY VARY FROM WHAT IS SHOWN. TREE LINE ------ FENCE STREAM — 312— 12 INTERVAL CONTOUR —300 oo — INDEX CONTOUR CG -2 CG -2 STANDARD 6" CURB CG -6 CG -6 COMBINATION 6" CURB & GUTTER e n CONCRETE PAVEMENT / SIDEWALK RIPRAP _ ASPHALT O GRASS EC -2 MATTING EC -3 MATTING WETLAND io io PARKING COUNT CROSSWALK HANDICAP ACCESSIBLE AISLE ZEN CG -12 & HANDICAP PARKING NOTE: 1. THE SIZE OF THE SYMBOLS MAY VARY FROM WHAT IS SHOWN. / STORM SEWER CURB DROP INLET R|M=548.44 |N=54J1S' / . � ' ` | \ . \ \ \ ___ ,�~ \ /, ` STORM SEWER `` \ STORM SEWE Approx. Location rnR0 E- torR r,61' mo Ememont -- ---- P- - r' og Ex Temporary 50' DI5 4204 PG 424 TK�� �� � |� TMP ����-/� | �� P 0r4 Office Land T rU54 ~ Zoned: ���K�/� �~ /�M/� ^ ^�~~..~~C�^ | L�|V|�� -~ ~~� ---'-'-- -------- L���/�"'-[�[���!|_/-��||| ����y���-------- --�----' '---'--- ----'-- ----�\- --- -�_ r- � `\ \ \ \ ` \ \ Approx. ocation "R ANHE ,'^---' --- O' DE RIM 0 qff EXP ° / / -=. Critical Slopes (Typ.) 17 T|VFP 3 241 A* . - --- ---~---^~ ' -F|k1L: LLC. | /� | , Zoned: | ����/` |\� L U Pharmacy- -IM __--- Uc�/�: | [/a7MMac\IV 51 --- | 14 �< 00 ~~-Ex. Temporary |[y Gnadmcj Iffasement D� /7 5tora�e Mana�ement 1, LLC Zoned: HC ffixi D13 192 1 PG 423 Zoned: | ����/` |\� L U Pharmacy- -IM __--- Uc�/�: | [/a7MMac\IV 51 --- | 14 �< 00 ~~-Ex. Temporary |[y Gnadmcj Iffasement D� /7 SANITARY SEWER MANI-iOl-f P,IM=552.68' ST -7 2 Changes ;shown on TMP 32-41R /-Ex. Temporary 50' / i I are not a part of, and are not Grading Easement approved with, this site plan. D5 4204 PG 424 TMP 32-41 K � Post Office Leand TrU5t 3' Cur Cut -F . I / W/ Rip Ra Channel Zoned: FDMC To Ex. DI -7 Top __ U 5e :--R to � l /- Of ice -5 �a e _- . _ ___ _... _ _..._ ___ _ d _ _ _ .._ _W�� _ .__ __ .__ __. _ :__ _ f _ __ . 00 00 68 GG Add CG -2 Curb $5 91�7 G8 --f4 / / t XG) 6 I( / Rebuild Portions Of -� � Gq. II �O / Using Stacking Blocks 20' Dirain c Easement from �41 14,:; D13 4393 P 2 0' Dirain c 15, me 5 _nt G5.�2- D13 t3 93 P / / i \ \915 G 5EGM L RETAI NG WALL G 0 ............ � 0 0 15W5GCI 0 =5G 5cre4ninj Wall To Be U5 . ................... ................ 45 TC BW=3�5-9.�42,4-' I / /-" F—/ P..+ -a-- 1A/a11 A+- R— �pN Z 0, ............ . ef, 55 3 r- P, 26 80 @6.3% GO UPPER LEVEL ffE: 5G0. 13 INI I 1;-r VI—u - I N=543 . r -r .1 9' 4 55 GO NORTH BUILDING OUT=540.34'�:) V V '01 11 Refer to ArchitcCt5, 4,120 5f LOWER FLOOR 14�) 0 New G9 plans or stair details4,0251�> r I I 4,u�D r UPPER r-LUUK Handir I Ne oncrete P pc 72.4 2-4.(S ltall Cj wall. Max He ht= I I IV -------- LOWER LEVEL Planterfff: 542.13 '='ox V 45 vel W1 Entranc 42 j �- C- �7 42 Level W1 Entrance >\ 5'5iciew k �\ 4 0 Z7 5 ji ., 1 .,.7 7� U) EX, POLE EX. IRRIGATION TO REMAIN 5' VALVE 35 50 T, 35 00 T, ST- I .... ..... .. —X N 14-0-1 L Maintain Inc ..... . . . . ....... New'ICxI .. . . . . . . ConcreteQ . . . . . . ... . ...................... . . ............................... ... .10.01 ad Iff nd Curb Parkin 2411 rick mp(t DB 4 PG 588, 4W, 2 Tc 0 't 0 MQ P4 z NW Z Z W z 0 awT z N 0 M q W N < > V) > V) W < 0 W < LN a Uq X A'1 JT op 0 UJ T V > Lic. N 4f 183 TMP SjONAL Sitorage, Maw, Zoned U56: Self 5tor xi DID 1921 Ii o Cn Existing X Chainlink Fence To Be Removed And Replaced Ex. Temporary Grading Ea5en DI5 X I Zxl- L adin5 ace CG -G . . . ......... . . 7 ST -4:::: '32 538 3 45 EX Pa- �/ / i U) New /,5phalt < NEW ---14-PARKiNG-5PACffS@ I -9f CG-i� 0 3 Reloca CORffTS'- 0.000 097 STE 000 - 000 CIS 12 36 T9F 3 2-4*1 A* DUMPRI PAC) T-ype-A---- Th, LLC. Changes shown on TMP 32-41A X 3 HC are not a part of, and are not Zoned: approved with, this site plan. STOP SIGN VVariable Width Temp. Ex. Variable Width Con5truction Cross Access U56: Fharmacy- 0 Easement Ea5ernent - 2G221 PG. D5 4393 PG -572 --- DB ��B G57 - —D5 -248-S PG 1'39 --A Ex. 20' Sanitary MH -X I Easement '1EX. SANITAP STORM SEWER -,Y SEWE D5 2792 PG I I 1MAW-101-Iff GRATE INLET 1 RIM =534.93' I RIM=535 If IN=53 I G9' x Cro55 Acce-55 .7 X OUT=53 I.G2' Z Variable Width IN 5 39 1 N CONCRETE EZ15CI-nent fMMARK--� UT=529.1 9' CONCRETE P , PAD D�V M P:3T E R G57 X r5T' Relocated D RIM 0 Ex. 15" RCP 10 0 10 20 30 PAD Storm Sewer -RETAINING WALL 13 13 "Do Not Enter" 1 93 93 93 93 13F 77711177-- LEV,=535.84' Sign SCALE: 1' = 10' CG -2 -7 Z 0 0 W J M. LL LL (L W 2 M (0 J > < Date 12/04/2015 Scale N /A Sheet No. 3 OF 10 File No. 10.005 SOIL EROSION & SEDIMENT CONTROL SYMBOLS N0. TITLE KEY 3.02 CONSTRUCTION ENTRANCE CE 3.05 SILT FENCE SF 3.07 INLET PROTECTION IP 3.13 TEMPORARY SEDIMENT TRAP ST 3.19 RIP -RAP RR 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU O 3.39 DUST CONTROL DC �r r Cu Pipe Rep / Required See Pr le (4/C7) i STORM SEWER CURB DROP INLET RIM=548.44' IN=543.19' OUT=540.34' (� �Ge ��otm 5T-7 2 ES- I / \ Ex. Temporary 50' 1)( 4204 PG 424 v D MP 32-41 R \, Post Office Leand Trus a \\ oned: P MC D DI Cur Cut G00 88 STORM EWER \, OLE RIM=564. \GRATE terra ('xG') A ox. Lo tion �, RIM= 4.61' 0 20' -- ��)5 Waterli ement _ ��.-/ G4 C FEX. 1 DPE/� D 1 tG DB 326 G 7 - -- h `i 5, i f l5: O_7jjj� 01 �o o�,�0000 v — - D 5 5 20------- 5 9 8 25 8v D v GO UPPER LEVEL FFE: 5G0. 13 NORTH BUILDING 4,120 SF LOWER FLOOR 4,025 5F UPPERfLOOR ST DA v --- -- sSO E LOWER LEVEL s FFE: 542.13 N7 y v 4 D 45 D D .45' D ----- v 0 / 1 10 20 310 1 0 I 0.92 AC 0 ST- I .::..... + :-:: a :.:::t V IX X I X \ \ Op 3 O � I i v JU IAT IMP XI ic. 4518 I j 7,01i w� i I TMP 3 2-4 1 H 1 SIONAL VI X torage Management I, Zoned: HC I 5e: 5elf Storage Bullc I DB 1921 PG 422 X I I X I ' C I <11 W 0 I l � O I q� Q X �O O V W Ex. Temporary 10' Grading Easement DB 17 I ( X � \ I . I� r �f a .a A> v V .o o. 20 xg4o .::..... + :-:: a :.:::t V IX X I X \ \ Op 3 O � I i v JU IAT IMP XI ic. 4518 I j 7,01i w� i I TMP 3 2-4 1 H 1 SIONAL VI X torage Management I, Zoned: HC I 5e: 5elf Storage Bullc I DB 1921 PG 422 X I I X I ' C I <11 W 0 I l � O I q� Q X �O O V W Ex. Temporary 10' Grading Easement DB 17 I ( X � \ I . I� r �f PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PROJECT DESCRIPTION THIS SITE IS A PROPOSED COMMERCIAL DEVELOPMENT WITHIN THE HOLLYMEAD TOWNCENTER. THE PROPOSAL IS THE DEVELOPMENT OF TWO RETAIL/OFFICE BUILDINGS AND THE ASSOCIATED PARKING REQUIRED. THE TOTAL AREA OF DISTURBANCE IS 1.21 ACRES THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH -THE PERMIT REQUIREMENTS. 2. INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. INSTALLATION OF STORM SEWER FOR SITE DRAINAGE. 4. CONSTRUCTION OF STRUCTURES AND PARKING AREAS SHOWN ON THE SITE DEVELOPMENT PLAN. EXISTING SITE CONDITIONS THE SITE IS CURRENTLY A VACANT, CLEARED SITE THAT HAS BEEN PREVIOUSLY GRADED. REFER TO SHEET C2 FOR LOCATIONS OF EXISTING FEATURES. ADJACENT PROPERTIES THIS PROPERTY IS BORDERED TO THE WEST BY HOLLYMEAD TOWNCENTER, BLOCK C9, TO THE NORTH BY A COMMERCIAL SELF STORAGE FACILITY, TO THE EAST BY AN EXISTING DRUG STORE AND TO THE SOUTH BY TIMBERWOOD BOULEVARD, A PUBLIC RIGHT-OF-WAY. OFF-SITE AREAS NO OFF-SITE LAND DISTURBING ACTIVITIES WILL TAKE PLACE IN THE COURSE OF THIS PROJECT. SOILS THIS SITE HAS BEEN MASS GRADED ON SEVERAL OCCASIONS AND THE SOIL TYPES PLACED OR REMOVED ARE UNKNOWN. GENERALLY, SOILS AT THE HOLLYMEAD TOWNCENTER ARE CLAY OR CLAY -LOAM SOILS. CRITICAL EROSION AREAS THERE ARE NO AREAS. ON THIS SITE WITH CRITICAL EROSION CONCERNS. THE CONTRACTOR SHOULD TAKE SPECIAL NOTE OF THE RETAINING WALL IN THE NORTH WEST CORNER OF THE SITE TO MAKE SURE THAT GRADING ACTIVITIES DO NOT UNDERMINE ANY PORTION OF THE WALL THAT IS INTENDED TO BE SAVED. EROSION & SEDIMENT CONTROLS 1. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 2. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 3. INLET PROTECTION: A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. THE DEVICES SHALL BE CONSTRUCTED IN SUCH A MANNER THAT WILL FACILITATE CLEAN-OUT AND DISPOSAL OF TRAPPED SEDIMENT AND MINIMIZE INTERFERENCE WITH CONSTRUCTION ACTIVITIES. 4. TEMPORARY RIGHT-OF-WAY DIVERSION: A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED RIGHTS-OF-WAY WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION TRAFFIC. 5. TEMPORARY SEDIMENT TRAP: A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORM WATER RELEASE STRUCTURE FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. SEDIMENT TRAPS WILL BE USED TO DETAIN SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO SETTLE. 6. RIP -RAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING TO PROTECT SOIL FROM CONCENTRATED RUNOFF. 7. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 8. PERMANENT SEEDING: ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF THE EDGE OF THE DITCHES SHALL BE SEEDED IN CONFORMANCE WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 9. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. PERMANENT STABILIZATION THOSE AREAS OF THE SITE WHICH WILL NOT BE ULTIMATELY PAVED WILL HAVE PERMANENT SEEDING ESTABLISHED, AS WELL AS TREES AND SHRUBS. STORM WATER MANAGEMENT: STORM WATER WILL BE DETAINED IN AN UNDERGROUND PIPE SYSTEM. STORM WATER QUALITY WILL BE ADDRESSED BY THE PURCHASE OF 1.28 LBS/YEAR OF NUTRIENT CREDITS. GENERAL NOTES 1. ALL ELEVATIONS INDICATED REFER TO SITE DATUM OF NAVD88. 2. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 3. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF-SITE WORK. 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 8. CONTRACTOR SHALL ADJUST ALL APPURTENANCES AS REQUIRED TO MATCH NEW GRADES. THE EXACT LOCATION OF APPURTENANCES SHALL BE COORDINATED WITH THE OWNER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUAR" TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B) MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: STAGE 1 1. INSTALL CONSTRUCTION ENTRANCE. 2. INSTALL SILT FENCE AT THE LOCATION SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN. 3. INSTALL PIPE FROM ST -6 TO ST -7. 4. INSTALL THE CULVERT SEDIMENT TRAP AND THE FILL DIVERSION. STAGE 2 1. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. STAGE 3 1. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, - GRADING, AND STOCKPILING. CUT LOWER PARKING DOWN TO FINAL GRADE. 2. BEGIN CONSTRUCTION OF STRUCTURES AND PARKING AS SHOWN ON THE SITE DEVELOPMENT PLAN. 3. AFTER SITE STABILIZATION IS IN PLACE, REMOVE THE CULVERT SEDIMENT TRAP. 4. INSTALL ST -4, ST -5, AND THE UNDERGROUND DETENTION FACILITY. BLOCK ALL INLETS WITH SANDBAGS TO PREVENT SEDIMENT FROM ENTERING DETENTION STRUCTURE. 5. MAINTAIN SILT FENCE AND CONSTRUCTION ENTRANCE. STAGE 4 ESTABLISH AND MAINTAIN PERMANENT STABILIZATION, INCLUDING VEGETATION OF ALL SLOPES AND GRASSED AREAS. UNBLOCK STORM INLETS AFTER STABILIZATION HAS BEEN APPROVED BY ALBEMARLE COUNTY AND THE ENGINEER. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. 3. ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIRECT -LOADED INTO COVERED ROLL -OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO DISPOSAL IN A PERMITTED LANDFILL. EROSION & SEDIMENT CONTROL PERMITTING 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. MINIMUM STANDARDS (M3).- All MS).- All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: o.No more than 500 linear feet of trench may be opened at one time. b.Excovated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. VO v J T SHIMP a Lic. N 183 YA SIGNAL E STONE 70' MIN. _€ CONSTRUCTION ACCESS 3" SM -2A ASPHALT TO"' COL;RSE EXIS k{P;0 �PAVEMEN, 6- i':1"N. 21>zi. AGGt^;_GF•T= BAfiE PROFILE 70' M'N. STONE TABLE 3.31-C 2' SOUTHb CONSTRUCTION TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES ASPIIALT PA%IED Per 1000 sq. ft. ACCESS CLASS I WASHRACK 10N AREAS TO BE DISTURBED 511 9n SPECIES 2% (CUT, FILLED, ETC.) ^'3' 2% FEXISTING PAVt htENT RIPRAP HEADWALL 27. to to to — _ i-, - I 1—lTr ELE=536 Do not use as mulch for *VUS` EXTIN :) FULL 1"JICTN A � PUSIT VE.` D .A`NJ,GE 8115 - - - - l 10 �LDI'� E. IT 11115 OF INGRESS AND EGRESS i TRAPPING DEVICE 2 tbs. OPERATION AGGREGATE 185 - 275 lbs. ------------- PLAN Use spring varieties (e.g., Noble). Ave saliva -----12' MIN. MAX. SEDIMENT 'Oi'LE DRAINAGE II (TOS5fEiENT PIPE INVERT=533.03 SEE DETAIL 14/C7 2% jrRAaPING DEN2c_ SECTION A—A A minfinillll water tap of 1 filen niust be lll:~taffed NCith a Illininiuni 1 inch ballcock shutoff valve supplyh g a wash hose ` ith a diameter of 1.5 inches fol' adequate constant pressure. Wash water Lnust be carried away front the elltrallce to au approved settling area to reinove sechment. All secli111ent shall be prevented from t:ntelin2 archil ctranlw, ditches or watercourses. PAVED WASH RACK NO SCALE 6 Paved Construction Entrance CE C7 JNot To Scale BLOCK GRAVEL CURB INLET SEDIMENT FIL TER CURB INLET 91val �s7�1'�`�fi'•!ir!' �j�a�,;.tits*,ra11tL�� RUNOFF OVERFLOW FILTERED WATER WATER WITH SEDIMENT } :...... ' SEDIMENT WIRE SCREEN 7..— 2" X 4" WOOD STUD CURB INLET SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE ri_i" INLET PROTECTION (IP) C7 / Not To Scale 555 550 545 540 535 530 525 520 555 550 545 540 535 530 525 520 0+00 0+50 1+00 1+50 2+00 1 STORM SEWER PROFILE ST -7 TO ST -6 C7 V: 1"=10' H: 1"=50' NOTE: CONTRACTOR SHALL FIELD VERIFY INVERTS AND PIPE LENGTHS PRIOR TO CONSTRUCTION. 1. SET THE STAKES. 6'MAX. FLOW r- ® r 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 1P SII r FLOW 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SILT FENCE (SF Not To Scale 555 550 545 540 535 530 525 520 Not To Scale 0+00 0+50 555 550 545 540 535 530 525 520 STORM SEWER PROFILE 2 ST -5 TO ST -4 C7 V: 1"=10' H: 1"=50' 565 560 555 550 545 540 535 530 525 Sin PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: STORM SEWER PROFILE 3 ST -3 TO ST -2 C7 V: 1"=10' H: 1"=50' Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — 2 lbs/acre; Annual Rye — 20 lbs/acre. Add 20 lbs/acre Indian grass when slopes are greater than 3:1. May 1 through August 15: Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — 2 lbs/acre; Foxtail Millet — 20 lbs/acre. Add 20 lbs/acre Indian grass when slopes are greater than 3:1. August 16 through October 31: Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — 2 lbs/acre; Annual Rye — 20 lbs/acre. Add 20 lbs/acre Indian grass on slopes greater than 3:1. November 1 through February 15: Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — 2 lbs/acre; Winter Rye — 20 lbs/acre. Add 20 lbs/acre Indian grass on slopes greater than 3:1. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from County Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. s PERMANENT SEEDING PS C7 J Not To Scale M. ire >•�i It • ri 1f a`i� i�r sus `+►_ �- .. ` 1ft,1•!�,R • .+t;��``i�'►f�?��1k�Rs � iii w�1�•. /taa�In 565 560 555 550 545 540 535 530 525 5�n 565 560 555 550 545 540 535 530 525 0+00 0+50 1+00 STORM SEWER PROFILE 4 EX -4 TO EX -3 C7 V: 1"=10' H: 1"=50' 565 560 555 550 545 540 535 530 525 *STORAGE REQUIREMENTS EQUIVALENT TO THAT OF TEMPORARY SEDIMENT TRAP, STD. & SPEC. 3.13 C.Y./ACRE WET STORAGE (B PERSPECTIVE VIEW (BELOW BASE OF STONE) 67 C.Y./ACRE-DRY STORAGE (BASE OF STONE TO TOP OF STONE BERM) TABLE 3.31-C 2' SOUTHb MULCHES: TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES PLANT Per 1000 sq. ft. Straw or Hay CLASS I RIPRAP 10N AREAS TO BE DISTURBED 511 9n SPECIES NATURAL GROUND (CUT, FILLED, ETC.) ^'3' Acre low ftz RIPRAP HEADWALL qOW to to to — _ i-, - I 1—lTr ELE=536 Do not use as mulch for Cy (Prov.) 1500 lbs. 4130 8115 - - - - VDOT #3, #357, 911 11115 ELE=534 OR #5 COARSE bu. (up to 100 lbs., 2 tbs. x AGGREGATE 185 - 275 lbs. ------------- Use spring varieties (e.g., Noble). Ave saliva not less than 50 lbs,) FLOW MAX. SEDIMENT DEPTH (CLEAN OUT POINT) AT 1/2 VOLUME OF WET STORAGE AREA PIPE INVERT=533.03 SEE DETAIL 14/C7 ELEVATION 2.5 lbs. X 4 - 6 tons185 X X X Use for late fall seedings, winter (Secale cerefle not less than 50 lbs.) nitrogen per ton. Do not use in fine turf areas. Apply cover. Tolerates cold and low with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. moisture. GERMAN MILLET 50 lbs. approx. 1 lb. X Shredded X turf areas. Apply with Warm -season annual. Dies at rust (Setaria 'nal ca) mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. frost. May be added to summer mixes. ANNUAL RYEGRASS' 60 lbs. Ph lbs. X X X X May be added in mixes. Will ( lium I0 mow ow out of most stands. WEEPING 15 lbs. 51h ozs. 00 X - - x - Warm -season Perennial. May LOVEGRASS brach. Tolerates hot, dry slopes Era esti cutvule) and acid, infertile soils. May be added to mixes. KOREAN 25 lbs. approx. 1 /i X X X X Warm season annual legume. LESPEDEZAe lbs. Tolerates acid soils. May be era sti ulaces added to mixes. a Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. ° May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. May LtQr be planted between these dates. w *STORAGE REQUIREMENTS EQUIVALENT TO THAT OF TEMPORARY SEDIMENT TRAP, STD. & SPEC. 3.13 C.Y./ACRE WET STORAGE (B PERSPECTIVE VIEW (BELOW BASE OF STONE) 67 C.Y./ACRE-DRY STORAGE (BASE OF STONE TO TOP OF STONE BERM) 13 CULVERT INLET SEDIMENT TRAP ST C7 Not To Scale 1' 2' SOUTHb MULCHES: NOTES: PLANT Per 1000 sq. ft. Straw or Hay CLASS I RIPRAP 8115 AREAS TO BE DISTURBED 511 9n SPECIES NATURAL GROUND (CUT, FILLED, ETC.) ^'3' Acre low ftz RIPRAP HEADWALL qOW to to to — _ i-, - I 1—lTr ELE=536 Do not use as mulch for Cy (Prov.) 1500 lbs. 4130 8115 - - - - VDOT #3, #357, 911 11115 ELE=534 OR #5 COARSE bu. (up to 100 lbs., 2 tbs. x AGGREGATE 185 - 275 lbs. ------------- Use spring varieties (e.g., Noble). Ave saliva not less than 50 lbs,) FLOW MAX. SEDIMENT DEPTH (CLEAN OUT POINT) AT 1/2 VOLUME OF WET STORAGE AREA PIPE INVERT=533.03 SEE DETAIL 14/C7 ELEVATION 2.5 lbs. X 13 CULVERT INLET SEDIMENT TRAP ST C7 Not To Scale s TEMPORARY SEEDING TS C7j Not To Scale ORIGINAL GROUND ELEV. ORGANIC MULCH MATERIALS AND APPLICATION RATES SEEDING RATE NORTH' SOUTHb MULCHES: NOTES: PLANT Per 1000 sq. ft. Straw or Hay 311 5n 8115 2115 511 9n SPECIES CHARACTERISTICS tons for Acre low ftz to to to to to to 35 lbs. Do not use as mulch for Cy (Prov.) 1500 lbs. 4130 8115 1111 4130 911 11115 0.93 OATS3 bu. (up to 100 lbs., 2 tbs. x - 185 - 275 lbs. X Use spring varieties (e.g., Noble). Ave saliva not less than 50 lbs,) use in fine turf aeras. Apply with mulch blower or by RYE' 2 bu. (up to 110 lbs.. 2.5 lbs. X 4 - 6 tons185 X X X Use for late fall seedings, winter (Secale cerefle not less than 50 lbs.) nitrogen per ton. Do not use in fine turf areas. Apply cover. Tolerates cold and low with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. moisture. GERMAN MILLET 50 lbs. approx. 1 lb. X Shredded X turf areas. Apply with Warm -season annual. Dies at rust (Setaria 'nal ca) mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. frost. May be added to summer mixes. ANNUAL RYEGRASS' 60 lbs. Ph lbs. X X X X May be added in mixes. Will ( lium mow ow out of most stands. WEEPING 15 lbs. 51h ozs. - X - - x - Warm -season Perennial. May LOVEGRASS brach. Tolerates hot, dry slopes Era esti cutvule) and acid, infertile soils. May be added to mixes. KOREAN 25 lbs. approx. 1 /i X X X X Warm season annual legume. LESPEDEZAe lbs. Tolerates acid soils. May be era sti ulaces added to mixes. a Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. ° May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. May LtQr be planted between these dates. s TEMPORARY SEEDING TS C7j Not To Scale ORIGINAL GROUND ELEV. ORGANIC MULCH MATERIALS AND APPLICATION RATES No. RATES: B MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 12 - 2 tons 70 - 90 lbs. Free from weeds and coarse Dry Vol. (Minimum 2 Dry Vol. matter. Must be anchored. tons for Spread with mulch blower or winter cover) (Acs.) by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for Cy (Prov.) 1500 lbs. 548 winter cover or during hot, 543 3 2 dry periods.* Apply as 0.93 62.3 3 slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf aeras. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. K'_5MULCHING MU C7 Not To Scale 10% SETTLEMENT TYPICAL VEE -SHAPED DIVERSION ('11�01]11VERSION DV C7 V. 1"=2' H: 1"=10' EL=A Area 2 - 1.0' DRY STORAGE D2 a H 67 CU. YD./ACRE11 EL=B Area 1 WET STORAGE 67 CU. YD./ACRE D1 if FILTER CLOTH ORIGINAL (EXCAVATED) GROUND EL=C ELEV. *SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP CROSS SECTION OF OUTLET CLASS I RIPRAP LENGTH (IN FEET) _ 6 X DRAINAGE AREA (IN AC.) DIVERSION DIKE I / COARSE AGGREGATE / �--- r EXCAVATED / FILTER CLOTH AREA **COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 OUTLET (PERSPECTIVE VIEW) Sediment Trap Design Data No. A B C H (ft.) Z (ft.) Weir Length DA Wet Vol. D1 Wet Vol. Dry Vol. D2 Dry Vol. (ft.) (Acs.) (Req.) (ft.) Cy (Prov.) (Req.) (ft.) Cy (Prov.) 1 548 546 543 3 2 6 0.93 62.3 3 63 62.3 2 69 14 TEMPORARY SEDIMENT TRAP ST C7 Not To Scale 4e'" � H U JU I IN M. S P a Li 1 � ! / S�� O� SIOIVAL V, A W v a� 0 0 Z V Z 0 U W j sr LL O LL � W ttt� > �, Q Date 12/04/2015 Scale N/A Sheet No. 7 OF 10 File No. 10.005 ST -6 ST -3• 00 o ST -2 END N ` , r! Z w - N 0 555 - 00 0 ... 555 �'' N w n o ^ w v C;1 o Z Z 565 a o 565 550 o _....._ ..-.. — — — W a 550 " w w d Z _.._.... 560 560 545 _.. 545 O N 555555 540 _ . 540 ' (n 550 550 535 ... ,_._ ....__. -____._..._-....--.-.-._._...---.._......_..-......__......... __.. 535 _.. - .._...........-_._...._.. __. .... N EF��3—EiVi RN 545 00 545 530 0 530 N >D�t - w ►- Q 1T > > 540 F 540 525 -. 525 V w n n Q N J 535 - 535 520. . _ _... ....- _.._... _ ..... _ .._�--._...__.._-_ 520 Z (n 9+50 10+00 10+50 11+00 11+50 9+50 10+00 10+50 11+00 11+50 12+00 (I� ��j < 0 J 0_ r Q O I r_i"'� DET. PIPE 1 PROFILE 2 DET. PIPE 2 PROFILE C8 V: 1"=10' H: 1"=50' C8 V: 1"=10' H: 1"=50' 536 47 r-0 100 -YR WSE=548.07 c`ni ion -YR WSF- 10-YR WSE=547.5 INV=537.75 INV=536.00 10- _ NV=.';.1'i 1 -YR WSE 546.56 INV=546,60 6" ORIFICE 04.0" ORIFICE INV=534.25 i INV=545.00 04.0" ORIFICE 04.0" ORIFICE REINFORCED STEEL PLATE K-3 DET. PIPE 1 DETAIL 4 DET. PIPE 2 DETAIL C$ Scale: 1"=3' C$ Scale: 1"=3' 6" PERFORATED PVC G OBSERVATION WELL WITH �, :.,• O PAVEMENT METAL CAP ELE=541.35 $' .. :.a." a t. �.` ae; . r. : �:.�'...� '�'• ~.. f . ,: .a` U JU I IMP e„M a Y ..'®�' y 's to •t" �, �.. :ad. .a•. e- e SEDIMENT BARRIER FILTER FABRIC �11 " TOP ONLY � ( ) �S ISG 6 FILTER GRAVEL SIONAL ELE=538.03 ---- � I I � I I �lI1'1I l 1 �u•i.W �L t --a-.,-- I-ifI�I ---_I-I--QII.I-yIr -:I`gyI�-mIII-I�II-VIII -I-I�I—I,I-I.aI-II;I,III:I�•�I-: I-I�I-I�II-- 2' MIN. OVERLAP 12.0' - 2.0' -20IrEIII- -C.s--2.0-' �III1Ii (TYP.) t 48" PERFORATED CMP 48" PERFORATED CMP 48" PERFORATED CMP Sa II I EII �LI EI =I5 -o 33.03 FILTER FABRIC (SIDES) I OPFILTER FABRIC SHOULD NOT BE 2' MIN. 2' MIN. LACED ON TRENCH BOTTOM q rRAW14— o Note: The underground detention system is designed and sized to function as an infiltration trench per VSWMH 3.10. Currently, soil tests for the location are unavailable. Engineer recommends the owner perform soil infiltration analysis to determine the feasibility of eliminating the planned Filterra and installing an infiltration trench. 4 UNDERGROUND DETENTION CROSS—SECTION O C$ Scale: i"=3' F -m � --------------- "40) \ 5T-6 v . --- , i5 EP'W00D AVID. v '''`'i llllllli 111111 `I b VARIA E WIDTH PUB C ROW EX. 12 o \ WATER LINE o U � i 5 J _ DB 2678-3.89 " -STOR-MWATER MANOMENT, / CONSTRUCTION, AND\ Q ----LANDSCAPE ESA EMENT \ u, ST -7 \ \ M I Date 12/04/2015 Scale N/A 5 OUTFALL DETAIL Sheet No. Cg scale: 1"=10' File No. 8 OF 10 10.005