Loading...
HomeMy WebLinkAboutWPO201600026 Bond Estimates 2016-05-10Project Name: The Hicks Residence WPO file number: WP0201600026 Erosion and Sediment Control Bond Estimate Item Item Number stabf Lion (PS, TS) silt fence (SF) safety fence(SAF) diversion (DD, FD, RWD) temporary slope chain(TSD) pipe length earthwork for trap/basin height of dam et toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total rill wclume) length of spillway width of spillway structures for basin riser height riser diameter barrel length barrel diameter sill fence inlet protection (IP) stone inlet protection (IP) outlet protection(OP) length channel (SCC, matted) length check dam depth in charms construction entrance (CE) wash rack paved construction entrance dp-rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 ft pipe diameter 0 in 0 R out at high side 0 R 0 R out at face 0 R 0 R length of out 0 R 0 R width of out 0 R 0 sf (area below transition) 0 at 0 ft (total width of cut) 0 fit 0 ft (depth below transitior 0 ft 0 sf (area above transition) 0 at 0.0 cy (total fin walume) 0.0 cy 0 R (TOAL CY estimate) 0 cy 0 R (spillway stone tons) 0 tons OR 0 in (riser unit price) $0.00 0 R base plate or fdn 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 fit 0 ft width 0 fit 0 ft width 0 fit 0 ft channel width 0 fit 0 ft length 0.0 fit 0.0 (tons) 0 tons 0 traps and basins 0 No. Unit Unit Cost Cosl (installed) 2.0 acres $5,000.00 $10,000.00 600.0 ft $5.00 $3,000.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 0 $200.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $2,000.00 $0.00 0 $2,000.00 $0.00 0 $3,500.00 $0.00 P $0.00 $500.00 $0.00 cost sum $13,500.00 contingency $1,350.00 Total $14,850 5/10/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h 1) + h 1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width rn point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)