HomeMy WebLinkAboutWPO201300032 Inspection 2016-05-11�� of AL Jeremy Glode site visit 4.5.16 Cascadia We are issuing a Notice to Comply for measures not installed. Most notably that stabilization is required within 7 days when site at final grade, and stabilization required within 14 days when site not at final grade but remains dormant (MS1). Most of the site has been dormant for longer than 14 days. THE FOLLOWING ITEMS NEED TO BE ADDRESSED: Entrance area. Add silt fence and stabilize per plan. Right side of entrance area. Culvert inlet protection requires repair. Jeremy Glode site visit 4.5.16 Cascadia Right side of roadway. Outlet protection not installed properly. Stormwater conveyance channel not installed per plan (sheet SW6). Install OP correctly. Reinstall the SCC-A after sidewalk installation. Blocks 1-3 area. Temporary conveyance channel not maintained property. Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (MS1). Jeremy Glode site visit 4.5.16 Cascadia Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (Msi). Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (Msi). �� of AL Jeremy Glode site visit 4.5.16 Cascadia Large swaths of Blocks 1-3 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (Msi). `t Soil stockpile and borrow area must be stabilized or protected if dormant longer than 14 days (MS 2). Jeremy Glode site visit 4.5.16 Cascadia Slope drain area above S132 needs immediate repair. Stabilize area after repair. _ or Slope drain area above S132 needs immediate repair. Stabilize area after repair. Ile �� of AL Jeremy Glode site visit 4.5.16 Cascadia Slope drain area above S132 needs immediate repair. Stabilize area after repair. Stabilize S132. Temporary stabilization from last year died. Immediate stabilization required. �� of AL Jeremy Glode site visit 4.5.16 Cascadia i�RctMPr` Stabilize SB2. Temporary stabilization from last year died. Immediate stabilization required. Large flat area above slope drains and S134. Stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (msi). �� of AL Jeremy Glode site visit 4.5.16 Cascadia Area surrounding S134. Stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (MS1). i J �y SB4. Weir not installed properly. Filter cloth exposed, install coarse aggregate (VDOT #3, #357, or #5), backed by class I riprap. Stabilization of basin required. Jeremy Glode site visit 4.5.16 Cascadia Diversion above blocks 1-3 removed near S134. Repair diversion so it leads into S134. Stabilize. Soil stockpile and borrow area must be stabilized or protected if dormant longer than 14 days (MS 2). Jeremy Glode site visit 4.5.16 Cascadia Large swaths of Blocks 4-7 require stabilization — stabilization required within 7 days when site at final grade and stabilization required within 14 days when site not at final grade but remains dormant (Msi). Blocks 4-7, east side of site. Diversion at top of slope needs maintenance and stabilization. Slope needs compaction and stabilization. Jeremy Glode site visit 4.5.16 Cascadia Blocks 4-7, east side of site. Diversion at top of slope needs maintenance and stabilization. Slope needs compaction and stabilization. Blocks 4-7, east side of site. Diversion at top of slope needs maintenance and stabilization. Slope needs compaction and stabilization. Jeremy Glode site visit 4.5.16 Cascadia Sediment traps along north and east side of site. Weirs not installed properly. Install coarse aggregate (VDOT #3, #357, or #5), backed by class I riprap. Temporary stabilization from last year died. Immediate stabilization required. Sediment Trap A (east side of site).Temporary stabilization from last year died. Immediate stabilization required.