Loading...
HomeMy WebLinkAboutWPO201300032 Inspection 2016-05-11 (2)Jeremy Glode site visit 5.10.16 Cascadia This is a re -issue of a Notice to Comply (from 4/7/16), for items not addressed in that notice, and generally for mud on the road, measures not installed, and site repairs needed. Most notably that stabilization is required within 7 days when site at final grade, and stabilization required within 14 days when site not at final grade but remains dormant (MS1). IN ADDITION TO ITEMS LISTED ON THE 4.7.16 NTC, THE FOLLOWING ITEMS ARE TO BE ADDRESSED: Clean up entrance area. Mud getting onto road. Add Construction Entrance. ) A# ��RGYN�A Outlet protection at entrance culvert. Stabilize diversion repairs along roadway. Jeremy Glode site visit 5.10.16 Cascadia S � Jeremy Glode site visit 5.10.16 Cascadia Compact and stabilize backside areas (along Hyland Ridge). Ensure Diversion leads to backside trap. Fix weirs on all traps/basins. - .: -�; •-" - ---- o�=" des