From: John Anderson
Sent: Thursday, May 26, 2016 5:05 PM
To: 'Dustin Greene'
Cc: 'Marks Hahn'; Frank Pohl; Matthew Wentland; Max Greene; Susan M. Stimart; Megan
Yaniglos; Mike Myers; Todd Shifflett
Subject: Planning Application Review for WP0201600011 Harvest Moon - VSMP.
Attachments: WP0201600011-Harvest Moon_VSMP-052616finalApprov.pdf
The Review for the following application has been completed:
Application Number= WP0201600011
Reviewer = John Anderson
Review Status = Approved
Completed Date = 05/26/2016
Thanks for your patience.
Thanks for such quick response, Dustin.
Attached VSMP Plan Approval also available in CV database system.
434.296-5832 —x3069
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project:
Plan preparer:
Owner or rep.:
Plan received date:
(Rev. 1)
(Rev. 2)
Final
Date of comments:
(Rev. 1)
(Rev. 2)
Final
Reviewer:
WP0201600011
VSMP Permit plan review
Harvest Moon —Phase I (VSMP)
Mike Myers, Dominion Engineering [172 S. Pantops Drive
Charlottesville, VA 22911, M ers(aWominioneng com]
Harvest Moon Catering Co./Mark Hahn
946 Grady Ave/Ste. 11, Charlottesville, VA 22901
22 Feb 2016
17 Mar 2016
18 May 2016
26 May 2016
26 Feb 2016
7 Apr 2016
25 May 2016 Conditionally Approved*
26 May 2016—Annroved
John Anderson
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1)
a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Provide 11" x 17" Exhibit. (Recommend ESC Plan as template.) Show solid/non-hazardous waste
dumpster; sanitary facilities (port -a john); solvent -paint storage; concrete wash-out; on-site fuel storage.
DEQ, during periodic inspections of active projects, instructs on importance of an Exhibit that shows
location of these features. All should drain to containment. For example, silt fence downstream of port -a -
john. Concrete wash-out, dumpster draining to trapping device (lined, in case of concrete wash-out). On-
site fuel storage berm with l Oml liner, sized to hold fuel volume + 2 yr. storm event. .PDF samples
available. Exhibit is not intended as a detailed design, but to show containment and locations which may
change over time. Exhibit is a construction aid and resource protection/inspection management tool.
(Rev. 1) As follow-up: Locate concrete wash-out outside pavement —recommend to north, to drain to trap.
Also, item #C.4., below. (Rev. 2) Addressed.
2. Revise/update ESCP and SWMP (11" X 17" sheets). (Rev. 2) Please submi (Final) Addressed.
3. Recommend do not resubmit SWPPP until all ESCP/SWMP comments have been addressed. (Final)
Addressed.
B. VSMP: SWPPP: Stormwater Management Plan (WP0201600011)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This SWMP is
approved. SWMP can be approved with purchase of phosphorus credits. Coordinate with County prior to purchase —
see item # 15, below. 0.68 lb. nutrient credit purchase required. Rev. 2 * County Attorney must approve purchase
Engineering Review Comments
Page 2 of 3
Agreement. Purchase is subject of Virginia National Bank letter to CBNLT, d. 11 -May 2016 (Final) Addressed.
1. Recommend include WPO201600011 in Plan Title. (Rev. 1) Addressed.
2. SW2 -Check Impervious Area Summary table: Bld 1/Travelway values, Phase 1 v. Phase 1 & 2 differ.
Confirm values are accurate. (Rev. 1) Addressed.
3. SW2 -Check Impervious Area Summary table/Phase 1 & 2: Include building 4. (Rev. 1) Addressed.
4. SW3 -There are dissimilarities of existing condition features between this plan and Initial Site Plan
(SDP201600004). For example: Ex. Shed, Ex. Trailer, Existing Ditch (SDP/SP3) are labelled Cinder block
building, Cinder block building, and Intermittent Stream (SW3). Please reconcile, especially stream/ditch.
Provide evidence to support proper description of this feature (intermittent stream v. ditch). (Rev. 1)
Addressed.
SW6
5. Apply/transfer SDP201600004 (sheet SP4) storm drain design to SW6, SW8, SW9: connect inlets 3E and
inlet IA. Eliminate pipe between inlet 3E and outfall 3F. (Rev. 1) Addressed.
6. Label inlets (inlet ID). (Rev. 1) Addressed.
7. Label storm pipes (#). (Rev. 1) Addressed.
8. Recommend 15" DIA storm line for 12" DIA HDPE if can maintain Vel. >3 fps in 15" DIA pipe. (Rev. 1)
Addressed.
9. Ref. 11/5/15 email to Mike Myers (re. As -built survey of Kegler's pond). All items listed in email have
been considered with design, except item #1. Provide Construction Record Drawing of `Kegler's Pond' to
determine true dimensions and capacity; basin outfall structures must be included." [11/5; 9/2/15 email]
(Rev. 1) Addressed.
10. Examine/evaluate existing riprap, outfall 1. Provide L X W X D dimensions. If riprap sparse or inadequate,
add plan details directing stone placement, EC3 matting, etc. If mat/riprap required, update view on SW8,
OP detail table, SW10. (Rev. 1) Addressed.
SW9
11. Label storm pipes in storm sewer drainage area map inset. (Rev. 1) Addressed.
12. Eliminate 3F. Eliminate storm pipe from 3E to 3F in inset view. (Rev. 1) Addressed.
13. Storm Drain Computations table: If DnStm Ln No refers to downstream inlet ID, recommend revise column
heading to read Dn Inlet ID. If this column refers to inlet ID, values 1, 2, 3, 5 do not correspond to inlets.
Revise headings/column values, as necessary. If interpretation a poor guess, please call reviewer (cannot
interpret table). (Rev. 1) Addressed.
14. Storm Inlet Computations table If column labeled Curb Len refers to inlet length, please label column Inlet
Len. (Rev. 1) Addressed.
15. New: Stormwater Management Narrative (SW6): "In order to meet water quality requirements for phase 1,
the owner is proposing to purchase phosphorus credits." It is imperative that owner coordinate nutrient
credit purchase with Ana Kilmer, Albemarle County, 434.296-5832 -x3246,rip or to credit purchase. (Rev.
2) Possibly addressed. Engineering will confirm if purchase of 0.68 lb. of phosphorus credits discussed in
letter from Virginia National Bank to CBNLT* (May 11, 2015) has been approved by the County Attorneys'
Office. Provided the purchase is approved, this SWM Plan and VSMP Application are approved. (Final)
Addressed.
*Chesapeake Bay Nutrient Land Trust, LLC, bank sponsor (Wildwood Farm), HUC Code 02080203 is elite to sell
nutrient credits to this project. CBNLT has 37.1 lb. of phosphorus credits available for purchase, as of this date.
C. VSMP: SWPPP: Erosion Control Plan (WP0201600011)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved.
SW8
1. List /label limits of disturbance =2.37 Ac. (Rev. 1) Addressed.
2. Provide silt fence (SF) south of building 1, at edge of limits of disturbance. (Rev. 1) Addressed.
3. Provide safety fence (SAF) between phase 1 and TMP45-112G1 (Medical spa). (Rev. 1) Addressed.
4. Label L X W floor dimensions of sediment trap. (Rev. 1) Addressed. As follow-up: Ref. VESCH Std. &
Spec. 3.13, sediment trap (p. III -72):
Engineering Review Comments
Page 3 of 3
The designer should seek to provide a storage area which has a minimum 2:1 length to
width ratio (measured from point of maximum runoff introduction to outlet).
Revise proposed 40:1 length to width ratio. Recommend split into two traps located in areas that allow
geometry that meets VESCH Std. (Rev. 2) Addressed.
5. PCE Vehicle rinse/sediment-laden wash waters may not drain to SDMH 204. Provide trapping device that
allows sediment -laden water to decant. DEQ guidance specifically provides that sediment -laden waters
must be contained. Provide alternate PCE settling/trapping design that does not propose discharge to
existing /proposed storm system. [Also: Revise ESC Narrative/Harvest Moon, Feb -19, 2016, p. 4, Phase 1/1.]
(Rev. 1) Addressed. Sediment -laden water will temporarily flow to a trapping measure at lower elevation.
6. Recommend provide mass grade plan sheet and separate fine grade sheet with building/pavement features.
(Rev. 1) Addressed.
7. Access/additional: (Rev. 1) Addressed.
a. Show proposed grades; grade elevation difference —16' top/bottom.
b. Tie proposed grades to existing grades that border access, left/right.
8. Provide additional existing grade labels. (Rev. 1) Addressed.
9. Extend existing contour lines at least 50 -ft beyond property lines. (Rev. 1) Addressed.
10. Acquire temporary construction easement if needed from TMP45-112G1 (Medical spa) to construct
proposed grades/improvements. (Rev. 1) Addressed. 3/18/16 Applicant response: "A construction
easement from TMP 45-112G1 will not be necessary for this project."
11. Provide fine grade/spot elevations at SDMH 203 to ensure MH top/new Access pavement align. (Rev. 1)
Addressed.
12. Ensure site plan /WPO plan proposed grades match on west side of building 1. (Rev. 1) Addressed. "The
proposed grades on the WPO plan will be shown on the Final Site Plan."
Process:
After approval, plans will need to be bonded. A VSMP bond estimate has been requested, and bond estimate amount
prepared. The County's Management Analyst will prepare bond agreement forms, which will need to be completed
by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will
need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all
the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements, in this instance, are not required since existing SWM
pond will be used. Existing Maintenance Agreements, such as they are, should or will attach to land transfer.
(Kegler's Pond, SWM Maintenance Facility ID 0021.01 —Detention Basin (dry) owned by Lowe's Investment Corp (ref. CV)
GIS image, next p. (Final) Image removed.
After bonding is complete, county staff will need to enter project information in a DEQ database for state application
processing. DEQ will review the application information based on local VSMP authority approval. At this time, the
DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to
pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the
county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants
will need to request a pre -construction conference by completing a form, and pay the remainder of the application
fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be
checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County
inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
Thank you 434.296-5832 —0069
File: WP0201600011—Harvest Moon_VSMP-052616finalApprov