Loading...
HomeMy WebLinkAboutSP197800064 Action Letter u~'"t~ (jO OF Plannmg Department 804/296-5823 414 EAST MARKET STREET CHARLOTTESVILLE. VIRGINIA 22901 RONALD S. KEELER A.SSISTANT DIRECTOR OF PL.ANNING ROBERT W TUCKER. JR DIIU:CTOR OF PLANNING October 3l, 1978 DONALD A. GASTON SENIOR PLANNER Central Virginia Eealth Facility Post Office Box 7JO? Charlottesville, \'i]~ginia 22906 Attn Stanley Wilcox N MASON CAPERTON PLANNER Re REQUEST FOR SP-78-64 BOARD OF SUPERVISORS ACTION Dear Mr Wilcox This is to advise you that the Albemarle County Board of Supervisors at its meeting October 25, 1978, approved your request to locate a sewage treatment plant on 3 4 acres :wned R-2 subject to the following conditions 1. Site plan app~~O\Tal including screening from adjacent properties by landscape plantings, ea]~th berming, and/or opaque fencing; 2 County Engineering review to insure that plant is not located in flood plain or otherwise prone to flooding; 3 Approval of appt::'opriate Federal, State, and local agencies The Albemarle County Service !\uthority shall request such agencies to emphasize in their reviews the minimization of odors and noise generated by the plant; 4 The plant shall be located below existing ground level to the maximum possible extent providl~d such location shall not be contrary to Condition No 2; 5 The plant and all appurtenances shall be dedicated to the Albemarle County Service Authority and operated thereafter in accord with the Rivanna Water and Sewer Authori.:y' s four-party agreement; 6 The plant and all appurtenances shall be constructed by the applicant at his expense in ac.:::ordance with plans approved by the Albemarle County Service Authority; 7 Connections to the package plant shall be limited to the proposed convalescent center, existing connections to the Crozet Sewer Company, and three on-site connections tJ the existing triplex dwelling; no further connections shall be allowed unless so ordered by the Health Department or State Water Control Board to abat= existing health hazards; 8 Connection shall be mandatory for all Crozet Sewer Company connections unless some other approvej means of sewage disposal could be provided; 9. Approval is cJptingent upon acceptance of the system by the State Water Control Board and Virginia Department of Health as an interim measure until the Crozet Interceptor is operational; Central Virginia H3alth Facility Attn Mr Wilcox October 3l, 1978 Page 2 10 The package plant shall be removed, and the site regraded, within six months of the t_me when the Crozet Interceptor becomes operational; 11 Only low phosphate soaps and detergents shall be used by the convale~ent center; unscheduled monitoring of the raw phosphate discharge from the convalescent center shall be conducted by the Rivanna Water and Sewer Authority w~d the cost of this monitoring shall be borne by the convalescent center In the event that total raw phosphorus output contributed by the convalescent center exceeds 0 153 lb ;day for three tests over a thirty-day period, the applicant will be required to install additional treatment facilities at his expense to achieve a level less than or equal to 0 153 lb /day Compliance by the applicant shall be accomf,lished within 180 days after a written order to that effect by the Zoning Administ.rator Sincerely, ~~O~~.e-ck,~ Jane Gloeckner Planning Department jg/ cc File