October 3l, 1978
DONALD A. GASTON
SENIOR PLANNER
Central Virginia Eealth Facility
Post Office Box 7JO?
Charlottesville, \'i]~ginia 22906
Attn Stanley Wilcox
N MASON CAPERTON
PLANNER
Re
REQUEST FOR SP-78-64
BOARD OF SUPERVISORS ACTION
Dear Mr Wilcox
This is to advise you that the Albemarle County Board of Supervisors at its
meeting October 25, 1978, approved your request to locate a sewage treatment
plant on 3 4 acres :wned R-2 subject to the following conditions
1. Site plan app~~O\Tal including screening from adjacent properties by landscape
plantings, ea]~th berming, and/or opaque fencing;
2 County Engineering review to insure that plant is not located in flood plain
or otherwise prone to flooding;
3 Approval of appt::'opriate Federal, State, and local agencies The Albemarle
County Service !\uthority shall request such agencies to emphasize in their
reviews the minimization of odors and noise generated by the plant;
4 The plant shall be located below existing ground level to the maximum possible
extent providl~d such location shall not be contrary to Condition No 2;
5 The plant and all appurtenances shall be dedicated to the Albemarle County
Service Authority and operated thereafter in accord with the Rivanna Water and
Sewer Authori.:y' s four-party agreement;
6 The plant and all appurtenances shall be constructed by the applicant at his
expense in ac.:::ordance with plans approved by the Albemarle County Service Authority;
7 Connections to the package plant shall be limited to the proposed convalescent
center, existing connections to the Crozet Sewer Company, and three on-site
connections tJ the existing triplex dwelling; no further connections shall be
allowed unless so ordered by the Health Department or State Water Control
Board to abat= existing health hazards;
8 Connection shall be mandatory for all Crozet Sewer Company connections unless some
other approvej means of sewage disposal could be provided;
9. Approval is cJptingent upon acceptance of the system by the State Water Control
Board and Virginia Department of Health as an interim measure until the Crozet
Interceptor is operational;
Central Virginia H3alth Facility
Attn Mr Wilcox
October 3l, 1978
Page 2
10 The package plant shall be removed, and the site regraded, within six months
of the t_me when the Crozet Interceptor becomes operational;
11 Only low phosphate soaps and detergents shall be used by the convale~ent
center; unscheduled monitoring of the raw phosphate discharge from the
convalescent center shall be conducted by the Rivanna Water and Sewer Authority
w~d the cost of this monitoring shall be borne by the convalescent center In
the event that total raw phosphorus output contributed by the convalescent center
exceeds 0 153 lb ;day for three tests over a thirty-day period, the applicant
will be required to install additional treatment facilities at his expense to
achieve a level less than or equal to 0 153 lb /day Compliance by the applicant
shall be accomf,lished within 180 days after a written order to that effect by the
Zoning Administ.rator
Sincerely,
~~O~~.e-ck,~
Jane Gloeckner
Planning Department
jg/
cc File