SDP201600025 Briarwood Recreational Area - initial site plan
Mr. Collins,
The Site Review Committee has reviewed the development proposal referenced above. Initial comments
for the following divisions of the Department of Community Development and other agencies, as
applicable, are attached:
Albemarle County Planning Services
Albemarle County Engineering Services
Albemarle County Zoning Services
Albemarle County Information Services (E911)
Albemarle County Building Inspections
Albemarle County Department of Fire Rescue
Albemarle County Service Authority [Comments pending to be forwarded once received]
Architectural Review Board (ARB)
Virginia Department of Transportation
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that
will be required to be resolved prior to Final Site Plan approval. The Lead Reviewer will either approve
with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
Z 1 11 Z
xtiol�z
Christopher P. Perez
Senior Planner
ALgn,
U
.� • 1 Z>Z
�'rRGIN�p'
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Memorandum
To: Scott Collins
From: Christopher P. Perez, Senior Planner
Division: Planning
Date: June 7, 2016
Subject: SDP201600025 Briarwood Recreational Area - initial site plan
Fax 434-972-4126
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the
following comments have been satisfactorily addressed (The following comments are those that have been identified
at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each
comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
1. [30.3.11] The proposal requires a Special Use Permit (SP) to fill in the floodplain. Prior to final site plan approval
this item shall be applied for and acted on by the Planning Commission (PC) and Board of Supervisors (BOS).
Per discussions with County Engineering the SP shall not be approved until FEMA approves the CLOMR-F.
2. [32.7.2.1, 32.5.1(c), 32.5.2(i), 32.5.2(m)] Vehicular access to the site. The access road, access easement, and
grading outside of the access easement are proposed on TMP 32E-2, which is owned by Ray Beard. Prior to final
site plan approval the easements required to construct the road shall be obtained from Mr. Beard and platted.
Easement plats shall be reviewed by the County and then recorded in the Clerk's Office. The DB page
information of this action shall be provided on the final site plan.
3. [32.5.2(n), 32.7.2.31 Sidewalks. Sidewalks shall be provided on one or both sides of the proposed access road
from St. Ives Road to the parking lot.
4. [32.5.2] General. On the cover sheet revise the tax map parcel information to include TMP 32E-2, which is
owned by Mr. Beard.
5. [32.7.2.1, 4.6.1, ZMA95-20, ZMA79-32] Prior to final site plan approval the road plan (SUB2016-8) for the new
section of St. Ives Road shall be approved and built or bonded.
6. [32.7.2.1] Vehicular access to site. The entrance onto the public street shall be designed and constructed as
required by the standards of the Virginia Department of Transportation. VDOT approval of the entrance to the
site shall be required prior to final site plan approval.
7. [4.12.15(a)] Surface material. Label the surface material for the access road, the parking area, and the trails
throughout the park.
8. [32.5.2(n), 32.5.1(c)] Dimensions. Dimension all proposed improvements, including parking spaces, drive aisles,
trails, sidewalks, picnic shelter, basketball courts, fencing and the multi-purpose field.
9. [32.5.2(f)] Watercourses and other bodies of water. On the plan depict and label the North Fork Rivanna River.
10. [32.5.2(n), 4.16.2.11 Existing and proposed improvements. Due to the park's proximity to the river, for the safety
of park users, provide fencing along the new 100 year floodplain. Chain link or metal bar fencing is appropriate
(provided ARB does not object). Depict, label, dimension, and provide a detail for the proposed fencing.
11. [32.5.2(a)] General information. For TMP 32G-1 the zoning provided on sheet 2 is not correct. Revise or omit
such information from sheet 2. Also, revise the zoning provided on sheet 1 for TMP 32G-1 to include Entrance
Corridor (EC) zoning.
12. [32.5.2(a)] General information. On the final site plan assure that the zoning of TMP 32E-2 includes PRD,
ZMA1995-20 w/ proffers.
13. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site plan.
14. [32.5.2(e)] Existing landscape features. Show the existing landscape features (as described in 32.7.9.4) on the
existing conditions sheet.
15. [32.5.2(e), 32.7.9.4(c)] Existing landscape features. On the landscape plan identify existing wooded areas as
either evergreen, deciduous, or a mix thereof.
16. [32.5.2(n)] Existing and proposed improvements. Clearly depict and label limits of disturbance and show areas
where existing vegetation will be removed.
17. [32.5.2(b)] Proposed use. List the minimum square footage occupied by the tot lot/recreational area.
18. [32.5.2(b)] Proposed use. Provide the maximum height of the picnic shelter.
19. [32.5.2(n)] Proposed improvements. Depict, label, and dimension the trash receptacles.
20. [32.5.20)] Existing sewer and drainage facilities. Depict the location and size of existing water and sewer
facilities and easements.
21. [ZMA2005-09 Proffer #41 Prior to final site plan approval provide a trail detail. Utilize the design standards for
a Class B primitive trail (see below). Also, depict the entire network of trails within this portion of the primary
recreation area. Currently the trail ends in an arrow below the stormwater management facility. Clarify where this
portion of trail is connecting.
H. Trail Standards:
�iasstEation Min. surface Min. Design
\
Class B —tape
uirements
Earth mulch,
width
ent
Other design
considerations
1 tive
or stone dust
enough to
marls the
20% maximum
grade (this is a
Trail breaks to
°d C Z L.
location
prevent erosion, with
�lacc.R .ftlw
Q+ ---A., .
�,
.minimum impact
nature trail -
_ _-.
foot bridges over
Ma obstacles
22. [Comment] The WPO application must be approved prior to final site plan approval.
23. [32.5.2(a)] Approval from the ARB is required prior to final site plan approval. See attached ARB review
comments.
24. [ZMA2005-09 Proffer #41 The primary recreational area shall be built or bonded for its construction prior to
final plat approval ofphase 4. This recreational area shall be built prior to completion of Phase 4...
Please contact Christopher P. Perez in the Planning Division by using c erezAalbemarle.or or 434-296-5832 ext.
3443 for further information.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: Briarwood Recreation Area —Initial Site Plan
Plan preparer: Scott Collins; Collins Engineering [200 Garrett St., Suite K
Charlottesville, VA 22902, scott ,collins-en ineerin .coml
Owner or rep.: Wendell Wood and Nena Harrell [ulcwww@embargmail.com]
Woodbriar Associates [P. O. Box 5548, Charlottesville, VA 22905]
Plan received date: 5 May 2016
Date of comments: 31 May 2016
Reviewer: John Anderson
Plan Coordinator: Christopher Perez
SDP2016-00025 —Initial —Engineering Review
1. May 19, Applicant, Planning, and Engineering met to discuss floodplain issues on this project. A specific
section of code was discussed. Code 18-30.3.11 -Permitted and Prohibited Uses and Structures (Table, p.
18- 30- 12.4, online .PDF); Stream Crossings and Grading Activities, provides the following impermissible
use in the regulatory floodway, but by -right use in the floodway fringe: "Grading activities in compliance
with the Water Protection Ordinance; provided that it is demonstrated, in a floodplain impact plan that the
grading will have no impact on the elevations or limits of the floodplain and further provided that any cut
or fill shall be only to level areas for playfields, correct erosion problems, build trails, or other fine grading
activities which will have no impact on the floodplain." May 19 discussion /proposal to maintain current
limits of floodplain by placing 14'f fill in the floodplain to a final (recreational field) elevation slightly
lower than (FIRM Panel 51003C00145D) base flood elevation —in effect, a design that may submerge the
recreational area during the I% statistical event —was discussed with Departmental Director and Zoning
Administrator on May 26. Please accept that any proposal to place approximately 14' of fill within the
floodplain to final elevation slightly lower than current effective FEMA FIRM Map panel base flood
elevation does not meet the intent of italicized text above. That is: "to level areas for playfields" intends
fine grading that removes surface irregularity or variation; it does not intend substantial cut (export) or fill
(import). Applicant is directed to series of emails, April 27, 2016 3:13 PM through 5/9/2016 2:31 PM,
attached to this note for guidance and direction on floodplain issues. Further, Applicant may appeal
determination of meaning of level areas for playfields or other fine grading to the board of zoning appeals.
2. As with any Floodplain Development Permit (FDP) project, while we accept 'Hydrologic and Hydraulic
Analysis results for Briarwood Development (report prepared for Collins Engineering, May 13, 2016),
please provide:
a. FDP Application for this project (please disregard if submitted) —link:
http://www.albemarle.org/upload/images/fonns center/departments/Community Development/forms/applica
tions/Floodplain Development Permit.pdf
b. H&H report author's name; professional /technical certifications and credentials.
c. Full-size plan sheets to accompany Application, including 8 river station cross-sections presented
in table format with May 13, 2016 H&H report Appendix A.
d. PE -seal `No Rise' Certification (sample Attached).
Thank you
Please call if any questions. 434.296-5832 -0069
Engineering Review Comments
Page 2 of 2
kdview Comments
s191:k +lI:IiI+I+Y�•�
Project Name- riarwood Recreation Area - nitial
Date Completed= Monday, June 06, 2016 s
Reviewer- 4ebecca Ragsdale
Department/Division/Agency: ( Zoning
Reviews Comments.-
W Initial Site Plan
Application plans for Briarwood, and the plan of development approved with ZMA 95-20 for the Beard property
(Proffer 19), require access to the primary recreation area in the location shown on the proposed site plan.
ZMA 95-20 shows a 50' Reserved Access area but it still must be platted and recorded, if it hasn't been done
already The Briarwood applicant must work with Beard to obtain the necessary easements for the road and
any grading easements necessary. Both property owners are subject to the requirements of the proffers and
application plan that require the recereation area to be built.
%,,eview Comments
SDP201600025
Project Name_ riarwood Recreation Area - Initial
Date Completed: ridgy, May 06, 2016Initial Site Pian
Reviewer: 4ndrew Slack — -- -
DepartmentfDivisiorL/Agency:L�Tl1
Reviews Comments-
K..-Wiew Comments
SDP201600025
Project Name: riarwood Recreation Area - initial
Date Completed: P Tuesday, May 24, 2016 finitia! Site Plan
Reviewer- Jay Schlothauer
Department/Division/Agency ! Inspections —
Reviews Comments:
Based on plans dated April 25, 2016.
No comments or conditions.
R. -Mew Comments
SDP201600025
Project dame_ riarwood Recreation Area - Initial
Date Completed- p Sunday, May 15, 2016 initial Site Plan
Reviewer: Robbie Gilmer
Department/Divisiork/AgencY= f Fire Rescue - - -
Reviews Comments_
Based on plans dated 4/25/16.
No comments or objections.
K., -,view Comments
SDP201600025
Project Dame: riarwood Recreation Area - initial
Date Completed: ' =riday, May 06, 2016 Initial Site Plan
Reviewer: Margaret Maliszewski
Department/DivisiorL/Agency: ARB
Reviews Comments:
LI
The proposed development falls within the Entrance Corridor overlay. If existing trees beyond the area of
proposed grading are to remain, then the proposed development is not expected to be visible from the
Entrance Corridor. The existing tree line and the proposed tree line to remain are not shown on the plan
Revise the plan to show both the existing tree line and the proposed tree line to remain. if trees to remain are
insufficient to eliminate visibility, x"'%RB review may be required.
COMMONWEALTH of 'VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
E,ulpeper Virgma 22701
Charles A. Kilpatrick, P.E.
Commissioner
June 6, 2016
Mr. Christopher Perez
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP -2016-00025 Briarwood Recreational Area -- Initial Site Plan
Dear Mr. Perez,
We have reviewed the initial site plan for Briarwood Recreational Area, dated 4/25/2016 as
submitted by Collins Engineering and offer the following comments:
1. Please clarify if cul-de-sac is part of this plan or the Briarwood Phase 4 Road Plan.
Please show features that are not part of this plan, and not existing, as proposed under
separate review.
2. Provide entrance radii; the minimum radius is 25', depending on design vehicle. Provide
design vehicle.
3. The minimum entrance width is 24 feet; please adjust depending on design vehicle.
If you need additional information concerning this project, please do not hesitate to contact me at
(434) 422-9894.
Si rely,
g /Z-
ennis Seale
Engineering Specialist
Culpeper District