Loading...
HomeMy WebLinkAboutWPO201600022 Bond Estimates Bond Estimate 2016-06-07Project Name: Harper -Shelton Mill WPO file number: WP0201600022 Erosion and Sediment Control Bond Estimate Item Item Number stabf tion (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope chain (TSD) pipe length earthwork for trap/basin height of dam et toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total rill wclume) length of spillway width of spillway structures for basin ser height riser diameter barrel length barrel diameter sill fence inlet protection (IP) stone inlet protection (IP) outlet protection(OP) length channel (SCC, matted) length check dam depth in charms construction entrance (CE) out at face wash rack 0 R paved construction entrance 0 R dp-rap, placed depth 0 R width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 R pipe diameter 0 in 0 R out at high side 0 R 0 R out at face 0 R 0 R length of out 0 R 0 R width of out 0 R 0 sf (area below transition) 0 at 0 fl (total width of cut) 0 R 0 fl (depth below transitior 0 R 0 sf (area above transition) 0 at 0.0 cy (total fin walume) 0.0 cy 0 R (TOAL CY estimate) 0 cy 0 R (spillway stone tons) 0 tons OR 0 in (riser unit price) $0.00 0 R base plate or fdn 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 R 0 fl width 0 R 0 fl width 0 R 3 fl channel width 13 R 0 fl length 0.0 R 0.0 (tons) 0 tons 0 traps and basins 0 No. Unit Unit Cost Cosl (installed) 1.5 acres $5,000.00 $7,500.00 800.0 R $5.00 $4,000.00 0.0 R $5.00 $0.00 0 R $13.00 $0.00 $0.00 $0.00 i cost sum contingency Total $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $877.50 $877.50 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 P $0.00 $500.00 $0.00 $16,877.50 $1,687.75 $18,570 6/7/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = hl(2h1) + hl(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width m point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)