COLLI NS T. ``e -'- , a `a G -,: _: :.i 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-e ng ineering.corn
January 7, 2014
Michael Koslow, PE
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
RE: Rutherfoord Hotel ESC Submittal
Thank you for your comments dated December 26, 2013 on the above-referenced project. The attached
plans reflect changes to address your comments as described below:
1. Application attached to this plan submittal. Additional fee submitted to Albemarle County.
2. Application has been signed by the property owner.
3. Previously approved MS-19 calculations have been attached to this plan submittal. The MS-19 cross-
section locations can be seen in plan-view on the Erosion &Sediment Control plan.
Should you have any questions, please feel free to contact me at 434-293-3719.
Sincerely,
Adam Long, PE
Collins Engineering
Glenn Brooks
From: Glenn Brooks
Sent: Thursday, February 20, 2014 2:06 PM
To: 'Scott Collins'
Subject: RE: Old Trail Block 2B
Going back through the files, it appears the old submittal for WP0201000053 was denied, as you cannot amend a closed
out out and released project. An application was again received on 1/8/14 referencing WP0201000053. This appears to
be an incorrect reference, but when this is disregarded, our files indicates the rest of the review fee was paid, and the
file was registered as WP0201300082.
So WP0201300082 is past the 45-day limit, and is therefore approved. We will need one additional copy. Please
provide this with your bond estimate request.
I do not know the status of stormwater or site plans for this block.
�c2I5 —It
From: Scott Collins [mailto:scott@collins-engineering.com]
Sent: Thursday, February 20, 2014 11:08 AM
To: Glenn Brooks
Cc: Johnathan Newberry
Subject: RE: Old Trail Block 2B
Glenn-
Is this project now under review at the county? Please confirm.
Thank you.
Scott Collins
From:Scott Collins
Sent:Wednesday, February 12,2014 10:51 AM
To: 'Glenn Brooks'
Cc:Johnathan Newberry
Subject: RE: Old Trail Block 2B
Glenn-
See the attached which was submitted on January 8th. It is the signed application by the owner. This is the same info
that I sent over to you the other day. I am not sure that I understand the comment below. The application was signed
by the owner and submitted on January 8th. Please confirm that this is acceptable and the plan is under review.
Scott
From:Glenn Brooks [mailto:GBROOKS@albemarle.org]
Sent:Wednesday, February 12, 2014 10:46 AM
To:Scott Collins
Cc:Johnathan Newberry
Subject: RE: Old Trail Block 2B
I do not have an application signed by the owner. This is application WP0201300082 Old Trail Phase VIII Block 2B,
March Mountain Properties LLC
1
From: Scott Collins [mailto:scott(acollins-engineering.com]
Sent: Wednesday, February 12, 2014 10:27 AM
To: Glenn Brooks
Cc: Johnathan Newberry
Subject: RE: Old Trail Block 2B
Glenn-
Are we straight on this submission and is the plan under review.
Thanks.
Scott
From:Scott Collins
Sent:Tuesday, February 11, 2014 2:20 PM
To: 'Glenn Brooks'
Cc:Johnathan Newberry
Subject: RE: Old Trail Block 2B
Glenn-
Yes, it was first filed as an amendment to the WP0201000053 application. It was then rejected as an amendment to
this,and indicated that we had to pay the entire$300. $180 was already paid, indicating that we need to pay an
additional $120 to complete the application for review. This comment was generated on 12/26 and the fee and new
application was submitted on 1/8/14. A new WPO#was started for this, and the fee was completely paid, and a new
owner's signature was registered. Does this complete the loop and can we start the review process for this WPO plan?
Scott
From:Glenn Brooks fmailto:GBROOKS@albemarle.org]
Sent:Tuesday, February 11, 2014 2:10 PM
To:Scott Collins
Cc:Johnathan Newberry
Subject: RE: Old Trail Block 2B
That receipt is for wpo201000053. The application I have in this file, WP0201300082, is signed by you, not the owner,
and is paid for$180, not the required $300.
From: Scott Collins [mailto:scott(acollins-engineering.com]
Sent: Tuesday, February 11, 2014 11:58 AM
To: Glenn Brooks; Johnathan Newberry
Subject: RE: Old Trail Block 2B
Glenn-
What? This was submitted (in person)on January 8th Here is the receipt (from the previous email).
Scott
From:Glenn Brooks fmailto:GBROOKSPalbemarle.org]
Sent:Tuesday, February 11, 2014 11:55 AM
To:Johnathan Newberry
Cc:Scott Collins
Subject: RE:Old Trail Block 2B
2
No sorry,we do not accept application, signature or fees by email
From: Johnathan Newberry
Sent: Tuesday, February 11, 2014 9:50 AM
To: Glenn Brooks
Cc: Scott Collins
Subject: FW: Old Trail Block 2B
Glenn,
Can you confirm whether or not these attachments complete the application for WPO201300082?
Thanks,
J.T.
From: Scott Collins [mailto:scoff@collins-engineering.com]
Sent: Tuesday, February 11, 2014 9:29 AM
To: Johnathan Newberry
Subject: RE: Old Trail Block 2B
JT-
Thanks for the follow-up on this. Yes, please put the height request on the BOS meeting, we need to get that taken care
of quickly. As far as engineering, I have sent this information to the county 2 time now, but hopefully the third time will
be the charm. The additional fee was paid back on January 8, 2014. Can you please follow-up with Glenn on this so we
can wrap up the review/approval on the plan.
Thx.
Scott
From:Johnathan Newberry [mailto:inewberryPalbemarle.orgj
Sent: Monday, February 10, 2014 5:26 PM
To:Scott Collins
Subject: FW: Old Trail Block 2B
Scott,
Please see Glenn's response below.
Besides the final approval from Engineering,VDOT and ACSA, Planning needs to get the height variation from the BOS.
I'm putting a special exception on an upcoming consent agenda because we're recommending approval.
Thanks,
J.T.
From: Glenn Brooks
Sent: Monday, February 10, 2014 4:10 PM
To: Johnathan Newberry
Subject: RE: Old Trail Block 2B
This project,from 2010,was constructed and the bond released. CV shows a new submittal for this dead project was
attempted in Dec 2013, but it was denied, because the file has been closed out.
3
Glenn Brooks
From: Glenn Brooks
Sent: Wednesday, March 19, 2014 4:23 PM
To: 'David Hilliard'
Cc: Ana Kilmer
Subject: Lickginhole Basin fee and bond for Old Trail block 2B
The bond needs to be posted prior to a grading permit being issued. The fee for the pro-rata share to the Lickinghole
Basin is$1202 for this project.
From: David Hilliard [mailto:DavidHilliardOlodgeatoldtrail.com]
Sent: Thursday, March 13, 2014 1:20 PM
To: Glenn Brooks
Cc: Ana Kilmer; Scott Collins
Subject: RE: Old Trail block 2B Rutherford Hotel, bond estimate request
Glen,
I just spoke with Scott Collins and his office will supply another set of plans. He mentioned that maybe his group made a
mistake with checking a box for the subdivision bond.
Look forward to the final tally for the bond. When are the bond and lickinghole basin check due?
Thanks
David Hilliard
Owner
The Lodge at Old Trail
330 Claremont Lane
Crozet,VA 22932
www.LodgeAtOldTrail.com
The 'Lodge
At Old frail
N',r its 1,401. I uf411ill NI%
434.823.9100 Office
434.989.5050 Cell
434.422.9374 Facsimile
888.830.0955 Toll Free
www.lodgeatoldtrail.com/blog
From: Glenn Brooks [mailto:GBROOKSalbemarle.orq]
Sent: Thursday, March 13, 2014 8:49 AM
To: David Hilliard
Cc: Ana Kilmer
Subject: RE: Old Trail block 2B Rutherford Hotel, bond estimate request
1
From: Glenn Brooks
Sent: Wednesday, March 12, 2014 2:53 PM
To: 'davidhilliard@logeatoldtrail.com'
Cc: Ana Kilmer
Subject: Old Trail block 2B Rutherford Hotel, bond estimate request
Mr. Hilliard,
You have requested two bonds for this project.
The erosion and sediment control bond amount is$15,750 for plan WPO201300082. I am still awaiting one additional
copy of this plan before I can complete the file,and compute the pro-rata share to the Lickinghole Basin.
The subdivision bond is a mystery to me. We have no plan with this title,and I cannot find the plan you would like a
bond estimate for. You will have to be more specific. Here is my outline of the location and bonds previously posted or
held; The yellow shows subdivision bonds. I assume you want the road bonded between phase 9 block 13B and phase 2
block 4 phase A. So what plan is that?
Block 3 Phase B
Ph<3A, ti 111.Q, '4; Site Plans (aka Pri l I t rt Sit:
Phase 2 B c:k: sit Phase 1
" t ,, ,) Blu.1>,,.i3A
rt ` Site Plan� ti `` ,,
lar -,- 41rr•(=1 Ar--:-.tj. Yi1i,� 1u k. ; i
Glenn Brooks, P.E.
County Engineer