Loading...
HomeMy WebLinkAboutWPO201400054 Correspondence 2014-12-16 COLLINS " **roe -.Not 00 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com December 16,2014 Max Greene Department of Community Development County of Albemarle 401 McIntire Road Charlottesville,VA 22902 RE: WPO-2014-54:Grace Estate Winery Thank you for your comments dated December 10, 2014 on the above-referenced project. The updated plans reflect changes to address your comments as described below: A. Stormwater Pollution Prevent Plan 1. Stormwater Pollution Prevent Plan (SWPPP) is included in this submittal. B. Pollution Prevention Plan 1. Pollution Prevention Plan(PPP) is included in this submittal. C. Stormwater Management Plan 1. VSMP application form and fee with owner's signature provided. 2. A stormwater management(SWM)calculations packet has been provided with this submittal and it includes the Virginia Runoff Reduction Method (VRRM)calculations. 3. The plans have been revised to now include all elements of the SWM design to scale. Please note however due to the 'simplicity' of this development few scaled details are required.Also note that plan and profile scaled details are provided. 4. The plans have been revised such that the point of analysis is at the basin, as directed by County Engineering in this comment letter. Furthermore,at the direction of Mr. Glenn Brooks of County Engineering in an e-mail dated December 11th the drainage area used in the VRRM calculations and SWM quantity point of analysis calculations is for the area corresponding to the limits of disturbance. Also stated in this e-mail,the use of a filter strip was determined to be an acceptable method for water quality treatment. As such,the plans have been revised to include a filter strip to provide treatment and sheet flow for the development's runoff upland of the conservation area. Please note the applicant acknowledges a deeded plat will be required as a condition of WPO approval for the receiving stream buffer. 5. In an e-mail dated December 11th from Mr. Max Greene of County Engineering the WPO plans have been revised on sheet 1 to address this comment and the plans now require the construction entrance to be properly maintained.And if an excessive amount of soil is tracked onto the public roadway then the erosion and sediment control program administrator reserves the right to require an upgraded paved construction entrance with a water tanker truck, pressure washers and a settling area. Additionally,a gravel access road typical section has been added to the plans on sheet 1 to further address this comment.Should this note fully address the comment,the applicant cordially requests this comment be part of the erosion and sediment control comments to avoid confusion. D. Erosion and Sediment Control Plan 1. Sediment control structure calculation and construction design detail are attached to this submittal. 2. Limits of disturbance updated. Existing gravel drive shown,with the construction entrance relocated to the end of the existing gravel drive. Only one drainage area exists and is served by the proposed sediment trap. 3. Drainage areas are shown. 4. The notes has been added to the plan sheet. Should you have any questions, please feel free to contact me at 434-293-3719. Sincerely, Scott Collins, PE Collins Engineering