Loading...
HomeMy WebLinkAboutWPO201500053 Preconstruction Form 2016-03-03 SAL. Request for Pre-construction Meeting and Grading Permite41ro from Albemarle County 149 Approved Plan Number: WPO2015-00053 Approved Plan Name: Thomas Jefferson Foundation Water and Waste Water Improvements Part II (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 3/4/j (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: Michael Wingo State Certification Number: 39440 Address 3496 Old Ivy Road City Charlottesville State VA zip 22906 Daytime Phone 034 ) 906-2744 E-mail mwingo@faulconerconstruction.com Primary Contractor: Print Name Mark Richardson Address 3496 Old Ivy Road City Charlottesville State VA Zip 22906 Daytime Phone(434) 295-0033 E-mail mrichardson@faulconerconstruction.com Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 I and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 l00 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14 Page 1 of 3 Norio Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Mark Richardson Faulconer Construction Company mrichardson(afaulconerconstruction.com Michael Wingo Faulconer Construction Company mwingo@faulconerconstruction.com Roger Rothwell Monticello rrothwell@monticello.org The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who?__--—_—__-- — - 7/1/14,Revised: 8/29/14 Page 2 of 3 `aa, ,ri Information for Permit applicants; 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9) months after the date the land disturbing activity commenced, except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface,including,but not limited to,the following surfaces: (i) roadways and sidewalks covered by gravel,asphalt pavement,or concrete;(ii)trails or paths covered by gravel,stone dust,or mulch;(iii)buildings and other permanent structures;and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (see code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest,and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period,the permit will be revoked,and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures(including traps and basins)removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro-rated at payment, other than the first year VSMP fee as indicated in code section 17-209B. Re-inspection Fees Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250 per inspection,or as given in code sections 17-207 and 17-208. 7/1/14,Revised:8/29/14 Page 3 of 3 %ewe 'Norte Information for Permit applicants; 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9) months after the date the land disturbing activity commenced,except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface,including,but not limited to,the following surfaces: (i) roadways and sidewalks covered by gravel,asphalt pavement,or concrete;(ii)trails or paths covered by gravel,stone dust,or mulch;(iii)buildings and other permanent structures;and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (see code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest,and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period,the permit will be revoked,and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures(including traps and basins)removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro-rated at payment,other than the first year VSMP fee as indicated in code section 17-209B. Re-inspection Fees Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250 per inspection,or as given in code sections 17-207 and 17-208. 7/1/14,Revised: 8/29/14 Page 3 of 3 AL Request for Pre-construction Meetingand GradingPermit 4 71'4%) 9 from Albemarle County ° ' Approved Plan Number: WPO-2015-00053 Approved Plan Name: Thomas Jefferson Foundation Water and Waste Water Improvements Part II (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 3'"� /j ----------_- (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: Michael Wingo State Certification Number: 39440 Address 3496 Old Ivy Road City Charlottesville State VA Zip 22906 Daytime Phone(434 ) 906-2744 E-mail mwingo@faulconerconstruction.com Primary Contractor: Print Name Mark Richardson Address 3496 Old Ivy Road City Charlottesville State VA zip22906 Daytime Phone(434) 295-0033 E-mail mrichardson@faulconerconstruction.com Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14 Page 1 of 3 Ste 'writ'' Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Mark Richardson Faulconer Construction Company mrichardson@faulconerconstruction.com Michael Wingo Faulconer Construction Company mwingo@faulconerconstruction.com Roger Rothwell Monticello rrothwell@monticello.org The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date __. By who? 7/1/14,Revised: 8/29/14 Page 2 of 3