Virginia Asphalt Services VSMP
WPO201500063
Erosion and Sediment Control Bond Estimate
Item Item No Unit Unit Cost Cost
Number
(installed)
stabkration(PS,TS) 08 acres - $4,00000
sit fence(SF) 4200 ft $2,100 00
safety fence(SAF)a-tree protection 380,0 ft $1,800 00
diversion(DD,FD,RWD) 240 ft $3,12000
temporary slope drain(TSD) pipe length 0 tt pipe diameter 15 in $0 00
earthwork for trap/basin
height of dam at toe 0 ft cut at high side 10 ft
height of till at face 4 ft cut at face 3 ft
length of dam 38 8 length of cut 50 ft
top width 5 ft width of cut 38 ft
length of spillway 8 ft $13 00 $7,805 00
width of spillway 5 ft $5000 $11500
structures for basin
user height 0 ft
riser diameter 0 in $0 00
barrel length 0 ft base plate or fdn 0 $200 00 $0
barrel diameter 0 in $0 00
barrel collars0 $200 00 $0
baffle length 0 ft $50.00 $0
silt fence inlet protection(IP) 0 $000
stone inlet protection(IP) 0 $0 00
outlet protection(OP) length 0 ft width 10 ft0 $0 00
channel(SOC.matted) length Oft width 10 ft $000
check dam depth in channel 1 ft channel width 10 ft0 $0 00
onstruc5cn entrance(OE) 0 $0 00
level spreader 1 $500 00
wash rack 1 $200000
paved construction entrance 1
$3.500 00
rip-rap,placed depth Oft length 1 0 ft
width 1 0 $0 00
survey and layout(puce per 0 1 mi) acres 0 8 traps and basins 1 8000 00
moblliratim
$500 00
stream crossing(computed independently)
$0 00
cost sum $26,14000
contingency $2,61400
Total $26,760