Loading...
HomeMy WebLinkAboutWPO201500063 Preconstruction Form 2015-12-02 � z Request for Pre-construction Meeting and Grading Permit from Albemarle County .► ~ Approved Plan Number: WPO- -0 l " 000(03 Approved Plan Name: V k Y-Qj l Ak a AyAOLF-f- &VIA C.L. (Plans must be approved prior to a pre-construction meeting.) Bond approved date: G-j 1 q/1 s (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: � � Print Name: C� `Q,n �i(�,:a l..�sJ — — State Certification Number: `C 10 '^1 {)t /62_1% 1 Address (1 t O A l(ta St City Ci art 0 �� CSO I t.e, __..VA Zip 2-State 6:a 3 Daytime Phone(Istb L(6I "" `'C 5G_E-mail_0 c h n s • • ft • ua t . (1 tyM Primary Contractor: Print Name U 1 i ► aAgekolf-r,g-erActs, �G Address 4 Ct G k/t Y CKs t x-,e_ '• 1ZdC City CrOieit"-- State V--A" Zip '2193', Daytime Phone(t °1459"-5(103g-mail br\Jcxfl--h e,t fl sten Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: , Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 I and Jess than 5 $594.00 5 and less than 10 $74$_00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSIVIP,VESCP fees were paid with the application. 711/14,Revised:8/29/14 Page 1 of 3 Name Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm p� Contact Number or email .i,ail � 4' ' tip*�� c` l�i ' � '�: —'cow The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? • 7/1/14,Revised:8/29!14 Page 2 of 3