Loading...
HomeMy WebLinkAboutWPO201500072 Preconstruction Form 2015-10-02 is Request for Pre-construction Meeting and Grading Permit from Albemarle County Approved Plan Number: WPO- ,gfO d240t9 72 Approved Plan Name: e'h1 liar ' ( (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 10 1• 201 (Bonds must be approved and posted prior to a pre-construction meeting 6r permit.) Responsible Land Disturber: Print Name: r. jr/ ■ IA / r /• e, State Certification Number: * O111 J 5 Address .17. a3" 7 City I7C417& State • Zip Daytime Phone(1 •t 'q E-mail r i ha Q . (O l Primary Contractor: Print Name_44 'jertlf cl Cr ✓r 74 1174 ( G _Pr-v.) Address ' • / • rj ► I _ City '' . �'1� state YG Zip 0,0 Daytime Phone ) 21 C1. zq( 1 E-mail / . al. Fla ./// Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and app 'cation: VSYR': Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 . r $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and morc $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of 3 • Information for Permit applicants; 9-Month Permanent Stabilization P .adline: Code Sec.17-808 Duty to stabilize denuded ar- with permanent vegetation'within nine months after commencing land disturbing acti 'ty A. When permanent vegetation required. e owner shall install on all denul ed areas on the site within nine(9) months after the date the land disturbing . ivity commenced,except for reas that the administrator determines are necessary parts of the co struction that are subject to an active building permit and areas where erosion is prevented by a non-erosive s ace, including,but not limited the following surfaces:(i) roadways and sidewalks covered by gra 1,asphalt pavement,or concrete;(ii)trails or paths covered by gravel, stone dust,or mulch;(iii)buildin. and other permanent structuress;and such other surfaces that the administrator determines would adcquat-ly provide a permanent barrier tb erosion. (see code 17-808 for information about poss #le extensions) Notice to Comply and Permit Revo d for Overdue Fees Late fees will incur interest,and enforcement act ons per code section 17-210. (1) Owners with late payments of fees require, by 17-20706 will be issued a Notice to Comply(NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period,the pe •it will be revoked,and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage.I This is the disturbed acreage on approved plans. If fees are to be reduced,an app ication for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate •Ian changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed area, can only be approved when such areas are completely stabilized and all erosion control measures(including traps and basins)removed. Refunds The County does not have a refund program. F-;s will not be refunded based on Completion within the year. Fees will not be pro-rated at payment,other than the first -ar VSMP fee as indicated in code section 17-2098. Re-inspection Fees Re-Inspection Fees will be charged for inspectio s following a Notice to Comply'or a Stop Work Order. Fees are$250 per inspection,or as given in code sections 17-217 and 17-208. 7/1/14,Revised:8/29/14 Page 3 of