HomeMy WebLinkAboutWPO201400075 Plan - Stormwater Stormwater Management Plan 2014-10-16 STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
SINGLE FAMILY RESIDENCE
COMMON PLAN of DEVELOPMENT or SALE
STORMWATER POLLUTION PREVENTION PLAN(SWPPP)
For Construction Activities At:
Rocky Hollow
698 Rocky Hollow Road
Albemarle County,VA 22901
Latitude: 38. 03'20.30"N(decimal degrees)
Longitude: 78. 25'41.93"W(decimal degrees)
Construction Activity Operator:
Dobson Homes, Inc.
Tommy Dobson
P.O. Box 7181
Charlottesville,VA 22906
434-591-1188
SWPPP Preparation Date:
October 16, 2014
CERTIFICATION
"I certify under penalty of law that I have read and understand this document and that this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing violations."
Operator Name:
Title:
Signature:
Date:
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
1.0 SWPPP Documents Located Onsite&Available for Review
SWPPP Document Type Located Onsite&Available for Review?
Registration Statement ❑ Yes ® NA
Notice of Coverage Letter ❑ Yes ® NA
Construction General Permit ❑ Yes Z NA
Site Plan ❑ Yes ® NA
Erosion&Sediment Control Plan (or agreement in lieu of) Z Yes ❑ NA
Stormwater Management Plan(or agreement in lieu of) ® Yes El NA
2.0 Authorized Non-Stormwater Discharges
Type of Authorized Non-Stormwater Discharge Likely Present at Your Prosect Site?
External buildings wash down ❑ Yes Z No
Uncontaminated foundation or footing drains Cl Yes ® No
Uncontaminated excavation dewatering ❑ Yes ® No
Landscape irrigation ❑ Yes Z No
Others[describe] ❑ Yes ® No
3.0 Pollution Prevention Awareness
Employees will be given a "walk through"of the site identifying areas of possible pollution and will be shown Erosion
and Sediment Controls and Pollution Prevention Practices (identified in Sections 4.0 and 5.0 of this SWPPP)that are
applicable to their assigned job duties. A refresher meeting and "walk through" will be conducted on an as needed
basis.
4.0 Erosion&Sediment Controls
Select all Estimated Estimated Responsible
that a I Erosion&Sediment Control Installation Removal Party
pp y Date Date
® Construction Entrance 12/22/14 06/22/15
(Std. &Spec. 3.02)
® Silt Fence 12/22/14 06/22/15
(Std. &Spec. 3.05)
® Culvert Inlet Protection 12/22/14 06/22/15
(Std. &Spec. 3.08)
® Outlet Protection 12/22/14 NA
(Std. &Spec. 3.18)
® Temporary Seeding As required NA Construction Activity
(Std. &Spec. 3.31) by 3.31 Operator(See Cover
Permanent Seeding Page of this SWPPP)
® (Std. &Spec. 3.32) 12/22/14 NA
❑ Sodding 12/22/14 NA
(Std. &Spec. 3.33)
® Mulching 12/22/14 NA
(Std. &Spec. 3.35)
® Others[describe]
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
Z 3 a
o a
J O j
5
Z > .0 Qwu cn
O o c O V) N O
ci
H O
Za v y a
W l o-8
U
> et
W co Q (,) 0
C
a U O a
70
Z N
O a
H
T
J O N
0 O a)m CvCOO LLa ' > V COcCOca)ct oaaa
W m
H
i.
CZ2
W
O sieoiwaLO opcoi Jay* x x x x x x
F
co
spHog 'swap 'gseal x x x x x x x x x x
sesnnqii,euapee x x
aseaaO)g HO x x x x
seppigJeH)g seprogsed x x
Y (seseq pue sprue)Hd x x x x x >—<-
c
0
0 o sleiaw AneaH x x x x x
u a
ca
a` saueu;nN x x x x x X
c
0
luew!pes x x x x x x
a)
m
C.
O. c (`• z z z z z z z z z z z
a.) S in El ❑ ® ❑ ❑ ❑ ® ® ❑ ❑
AL)
>'U d) U) u) CO U) M U) CO Cl) U) w
a.° ate) °'o >- >- Cl) Cl) a) >- a) Cl) a) Cl) >-
c J a ® ® ® ❑ ® ® ® ❑ ❑ ® ❑
0
z
0
0 �c
a :, m
o > m § a)
c 0) 0)
a) < n m c
o a) 0) > v, o
ox C c c co D g
o.E _ P
•
<a c O1 a) c O 2 0 N •c 0 a)
C (7 '..=.O N 0 V) V Q- 'o y O c-
3 N -0 o cE 0 > a) 'a 0, 5 >
o) c D c) w a .if) vu)) 3
d ca 'c b a) z'c 3 a`) o o 'o .5 v N 0
G c a) O 0 t- 'Fp a) N (a O O a) N -C N
U 7 a U o co a 0 M Q co Cr) J O �
'0 O
STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
Pollution Prevention Practices:
(1) Clearing, grading, excavating and un-stabilized areas — Utilize erosion and sediment controls to prevent
sediment laden or turbid runoff from leaving the construction site. Dispose of clearing debris at acceptable
disposal sites. Apply permanent or temporary stabilization, sodding and/or mulching to denuded areas in
accordance with the erosion and sediment control specifications and the general VPDES permit for
discharges of stormwater from construction activities.
(2) Paving operations — Cover storm drain inlets during paving operations and utilize pollution prevention
materials such as drip pans and absorbent/oil dry for all paving machines to limit leaks and spills of paving
materials and fluids.
(3) Concrete washout and cement waste—Direct concrete wash water into a leak-proof container or leak-proof
settling basin that is designed so that no overflows can occur due to inadequate sizing or precipitation.
Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of
other construction wastes.
(4) Structure construction, stucco, painting and cleaning—Enclose, cover or berm building material storage
areas if susceptible to contaminated stormwater runoff. Conduct painting operations consistent with local air
quality and OSHA regulations. Mix paint indoors, in a containment area or in a flat unpaved area. Prevent the
discharge of soaps, solvents, detergents and wash water from construction materials, including the clean-up
of stucco paint,form release oils and curing compounds.
(5) Dewatering operations — Construction site dewatering from building footings or other sources may not be
discharged without treatment. Sediment laden or turbid water shall be filtered, settled or similarly treated prior
to discharge.
(6) Material delivery and storage— Designate areas of the construction site for material delivery and storage.
Place near construction entrances, away from waterways, and avoid transport near drainage paths or
waterways.
(7) Material use during building process — Use materials only where and when needed to complete the
construction activity. Follow manufacturer's instructions regarding uses, protective equipment, ventilation,
flammability and mixing of chemicals.
(8) Solid waste disposal — Designate a waste collection area on the construction site that does not receive a
substantial amount of runoff from upland areas and does not drain directly to a waterway. Ensure that
containers have lids so they can be covered before periods of rain, and keep containers in a covered area
whenever possible. Schedule waste collection to prevent the containers from overfilling.
(9) Sanitary waste — Prevent the discharge of sanitary waste by providing convenient and well-maintained
portable sanitary facilities. Locate sanitary facilities in a convenient location away from waterways.
(10) Landscaping operations — Maintain as much existing vegetation as practicable. Apply permanent or
temporary stabilization, sodding and/or mulching to denuded areas in accordance with the erosion and
sediment control specifications and the general VPDES permit for discharges of stormwater from construction
activities. Apply nutrients in accordance with manufacturer's recommendations and not during rainfall events.
(11) Others—If applicable, describe your Pollution Prevention Practice.
6.0 Stormwater Management Controls
Select all Estimated Responsible
that a I Stormwater Management Control Installation Pa
pp y Date
Post-development Stormwater Management Controls Common Plan
❑ provided by a NA Construction
Larger Common Plan of Development or Sale Activity Operator
❑ Rooftop Disconnection Insert Date
❑ Sheetflow to Vegetated Filter(1 or 2) Insert Date
Construction
❑ Grass Channel Insert Date Activity Operator
(See Cover Page of
this SWPPP)
❑ Rainwater Harvesting Insert Date
❑ Permeable Pavement(1 or 2) Insert Date
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
Select all Estimated Responsible
that a I Stormwater Management Control Installation Pa
pp y Date
❑ Infiltration(1 or 2) Insert Date
Construction
❑ Bioretention (1 or 2) Insert Date Activity Operator
(See Cover Page of
this SWPPP)
❑ Others[describe] Insert Date
7.0 Spill Prevention&Response
Most spills can be cleaned up following manufacturer specifications. Absorbent/oil dry, sealable containers, plastic
bags, and shovels/brooms are suggested minimum spill response items that should be available at this location.
1s`Priority: Protect all people
2nd Priority: Protect equipment and property
3rd Priority: Protect the environment
1. Check for hazards (flammable material, noxious fumes, cause of spill)—if flammable liquid, turn off engines
and nearby electrical equipment. If serious hazards are present leave the area and call 911. LARGE
SPILLS ARE LIKELY TO PRESENT A HAZARD.
2. Make Sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of
any person.
3. Stop the spill source.
4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers.
5. If possible, stop spill from entering drains(use absorbent or other material as necessary).
6. Stop spill from spreading(use absorbent or other material)
7. If spilled material has entered a storm sewer;contact locality's storm water department.
8. Clean up spilled material according to manufacturer specifications, for liquid spills use absorbent materials
and do not flush area with water.
9. Properly dispose of cleaning materials and used absorbent material according to manufacturer
specifications.
Emergency Contacts:
Normal Working Hours
DEQ Blue Ridge Regional Office(Roanoke) 540-562-6700
DEQ Blue Ridge Regional Office(Lynchburg) 434-582-5120
DEQ Northern Regional Office 703-583-3800
DEQ Piedmont Regional Office 804-527-5020
DEQ Southwest Regional Office 276-676-4800
DEQ Tidewater Regional Office 757-518-2000
DEQ Valley Regional Office 540-574-7800
Nights,Holidays&Weekends
VA Dept. of Emergency Management 804-674-2400
24 Hour Reporting Service
Local Contacts
Local Fire Department 434-296-5833
Local Police Department 434-296-5807
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
8.0 Inspections&Corrective Action Log(make additional copies as necessary)
Qualified Inspector
Company/Organization: Dobson Homes
Name: Tommy Dobson
Telephone Number: 434-591-1188
Qualifications: RLD
Inspection Schedule
Discharges to surface waters:
❑ Once every 5 business days; or
® Once every 10 business days and no later than 48 hours following a measurable storm event.
Discharges to impaired waters,surface waters within a TMDL watershed,or exceptional waters:
❑ Once every 4 business days; or
❑ Once every 5 business days and no later than 48 hours following a measurable storm event.
Inspection Date TBD
Measurable Storm Event Insert Date&Rainfall Amount of Last Measurable Storm Event(if applicable)
Best Management In Compliance Corrective Action Needed; Date Corrective
Practices(BMPs) with SWPPP? Responsible Party Action Taken
Erosion&Sediment
Controls ®Yes ❑ No
(Section 4.0)
Pollution Prevention
Practices ®Yes ❑ No
(Section 5.0)
Stormwater ®Yes ❑ No
Management Controls
(Section 6.0) El NA
Certification
"I certify under penalty of law that I have read and understand this document and that this document and all
attachments were prepared in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,to the best of
my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing violations."
Operator Name: Inspector Name:
Signature: Signature:
Date: Date:
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP
STORMWATER POLLUTION PREVENTION PLAN
Rocky Hollow
9.0 Grading&Stabilization Activities Log
Date Date Date
Description of the Description of the
Grading Grading Activity Grading Stabilization Stabilization Measure
Activity (including location) Activity Measures (including location)
Initiated Ceased Initiated
10.0 SWPPP Modification&Update Log
Modification Description of the Modification/Update Modification Prepared By
Date (name&title)
07/2014, Rev. 1 Single Family Residence, CPoD, SWPPP