Loading...
HomeMy WebLinkAboutWPO201600018 Checklist - Project Closeout (Administrative) 2016-06-08 4 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO .D ( C-- le PROJECT TITLE .74- J L CoAct ,., FULL NAME OF ENGINEER ,....)c)\NAAA-0/50 A FINAL ACTION DATE: b' g' IC Cou tyView — 1 *Limits of Disturbance Area(Ac) updated I i ?_ Status/Status Date updated Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretinnif include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"dines'"provided. z Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path ame) of the document in the space provided. Applicat' n(signature copy) Scan I I Saved location Approve &S Plan(signed, or stamped "Approved",with Engineer name) Scan ❑ Saved location ❑ Approved Mitigation Plan (stamped "Approved":with Engineer name) n :can ❑ Saved location (� Approves SWM Plan (stamped "Approved"with En inee F-:' P pp g. „. r name) E Scan ❑ Saved location ❑ Army Corp Approval n Scan n Saved location ❑ VDOT Approval n ' ..Scan n Saved location ❑ Calculations ❑ Scan ' .. n Saved location n Bond Estimate Request ; ; ❑ Scan `. n Savedylocation n B• ond Estimate Calculated _ n Scan n Saved location n O• ther(Please explain) n Scan ❑ Saved location n O• ther(Please explain) n Scan ❑ Saved location I ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date_ If such nlanc art. inrinriari thAx, chrs..111 ho ..1,-..,...1.., ....-...1..,a