Loading...
HomeMy WebLinkAboutWPO201500025 Preconstruction Form 2015-10-05 NNW Al.k Request for Pre-construction Meeting and Grading Permit a otc,_ from Albemarle County J Approved Plan Number: WPO- a�C/S + • Approved Plan Name: C m 4 Pro per- t66 -- V5 m P Pte vi (Plans must be approved prior to a pre-construction meeting.) Bond approved date: (Bonds must be approved and posted prior to a pre-construction meeting or permit) Responsible Land Disturber: Print Name: ��e �I1��1n Wade_ kiav,S State Certification Number: \'l TC\Ct Address 'J1 Sat5 \,,(.1n e— City City -odcx. State U 4 Zip .2,27 Daytime Phone(51D) 7 1 a 3 u 1 E-mail Primary Contractor: \�' Print Name ea.vtr WdwL5 Re- Address L\Ock tc�eke W ODU-. GC.\Oq` City �1 d.•,S I State VA Zip 22 727 Daytime Phone( iO) cl`\% `V1-LV C*G- E-mail VJ, rU;( Y\f,S zo►\ , (5-w) r.- % - t z o Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to he disturbed is contained on the approved plan and application. VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.86\ev‘.0a1( and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised. 8/29/14 Page 1 of3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email \t\.\,ecLvE r nc- 540 - 1.)-00 Weaver 1•101..\(,c, (gq0) \.N1 0-cLue 0- L S - F \-1\ecvm.*11 (RLb \1\\,eave: \fA , N14„e-. st-to) -beAot-o- tax\- C,c'(\ Vro (sq0) zi - 099 The second second part of the application fee is required to be paid with this request. This fee amount is; I-11 A FOR OFFICE USE ONLY Permit Issued Date By who? " 5* • 7/1/14, Revised 8/29/14 Page 2 of 3