Loading...
HomeMy WebLinkAboutSDP201200032 Review Comments 2014-06-09Short Review Comments Report for: SDP201200032 SubApplication Type: The Miller School - New Entrance Site Plan Waiver Date Completed:06/15/2012 Reviewer:Philip Custer Engineering Review Status:See Recommendations Reviews Comments: Division: Date Completed:06/22/2012 Reviewer:Philip Custer Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/20/2012 Reviewer:Joanne Purtsezova Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/20/2012 Reviewer:Joanne Purtsezova Planning Review Status:See Recommendations Reviews Comments: Division: Date Completed:06/20/2012 Reviewer:Joanne Purtsezova Planning Review Status:See Recommendations Reviews Comments:Curb and gutter waiver request Division: Date Completed:06/20/2012 Reviewer:Joanne Purtsezova Planning Review Status:See Recommendations Reviews Comments:Travelway width waiver request to reduce required travelway width from 20' to 18' Division: Date Completed:06/20/2012 Reviewer:Joel DeNunzio VDOT Review Status:Requested Changes Reviews Comments:SDP-2012-00032 Miller School-New Entrance Joanne, I have reviewed the subject plan and have the following comments: 1. The speed limit on Route 635, Miller School Road, at this proposed entrance is 35 mph. The sight distance needs to be based on the posted speed and is 390 feet. Any speed study that shows an operating speed under the posted speed needs to be submitted to VDOT for review and approval of a lesser sight distance requirement in accordance with 24VAC30-73-80. The speed study should consider approach speeds from either direction. 2. The proposed culvert under the new entrance should be separate from the existing box culvert under Route 635 for maintenance reasons. If it is not possible to separate these structures, hydraulic information needs to be submitted to include the hydraulic grade line. Also, the proposed junction box would need a detail of the design and should be similar to a standard JB-1 VDOT junction box with modifications for the grate top. A maintenance responsibility agreement will be required and the Division: Page: 1 of 2 County of Albemarle Printed On: June 16, 2016 school will be responsible for the maintenance of the junction box. An easement will be required around the junction box for VDOT access. 3. A Land Use Permit will be required for construction within the road easement or connection to existing culverts. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434-589-5871 joel.denunzio@vdot.virginia.gov Date Completed:01/17/2013 Reviewer:Johnathan Newberry Planning Review Status:Pending Reviews Comments: Division: Date Completed:12/13/2012 Reviewer:Michelle Roberge Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/10/2012 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on SDP dated 11/30/12 No objection or comments Division: Date Completed:03/22/2013 Reviewer:Joel DeNunzio VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:12/17/2013 Reviewer:Michelle Roberge Engineering Review Status:Approved Reviews Comments: Division: Date Completed:06/09/2014 Reviewer:Johnathan Newberry Planning Review Status:Approved Reviews Comments:Approved after easements were recorded (reviewed under SUB201300183) and added to the site plan. Division: Page: 2 of 2 County of Albemarle Printed On: June 16, 2016