COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
Project: Gazebo Plaza WP0201200005
Plan preparer: W.W. Associates [fax 434-978-1444]
Owner or rep.: Neighborhood Investments-GP LLC [fax 434-971-8020]
Plan received date: 15 March 2012
Date of comments: 10 April 2012
Reviewer: Max Greene
The Erosion& Sediment Control Plans (WP0201200005) submitted 15 March 2012 has
received Engineering Review and meets Albemarle County minimum checklist items for
approval. Please submit at least 1 extra copy(more if you'd like extra stamped copies) for
approval and distribution during the pre-construction meeting.
The forms and instructions to request the Water Protection Ordinance Bond amounts can be
found on the Community Development Department Web site at
http://www.albemarle.org/upload/images/forms_center/departments/Community Development/f
orms/bonds/Bond Estimate Request Form.pdf
Please remember to request both the E&SC and SWM bonds on the form.
The forms and instructions to post the Water Protection Ordinance Bonds can be found on the
Community Development Department Web site on
http://www.albemarle.org/deptforms.asp?department=bonds
You may contact Ana Kilmer(Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures and Maintenance Agreements.
Once the Water Protection Bonds have been posted and approved, you may contact the
Department of Community Development to arrange a pre-construction meeting with a County
Erosion& Sediment Control Inspector. Should the County Inspector find the limits of
disturbance increased or the need for additional control measures required to protect the site,
additional fees will be required.
[17-204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a
grading,building or other permit for activities involving land disturbing activities within one(1)year after
the date of the approval.