Loading...
HomeMy WebLinkAboutWPO201600027 Checklist - Project Closeout (Administrative) 2016-05-26 v WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO ao 1 a 7 PROJECT TITLE 1 I dissoc(< V 12 FULL NAME OF ENGINEER 75-.4)V n ,4 e( o \ FINAL ACTION DATE: 5'0)'- ('E, CountyView — 1 n Lim. 'of Disturbance Area(Ac)updated Status/Status Date updated Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item.is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion'to.include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other",lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/n e) of the cument in the space provided. A licati pp (signature copy) San n Saved location Approved &S Plan(signed, or stamped "Approved"with Engineer name) Scan ❑ Saved location ❑ Apoved Miti ation Plan (stamped"Approved'with Engineer name) ❑ can ElSaved location . .. Approve SWM Plan (stamped "Approved"with Engineer.name) 'y -''zpr Scan ❑ Saved location ❑ Army Corp Approval ❑ Scan n Saved location ❑ VDOT Approval ❑ Scan ❑ Saved location ❑ Calculations ❑ S• can`:.', n Saved location ❑ Bond Estimate Request 1-.-;., ❑ Scan '.;n Saved location n Bond Estimate Calculated n S• can H Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location ❑ Other(Please explain) ❑ S• can ❑ Saved location I n At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later (fate If ctv'h nIono oro ;-,-.1„,4-4 +1---... .-.1--..1.1 L_ ■__