HomeMy WebLinkAboutWPO201400092 Bond Estimates WPO VSMP 2016-06-16Foothills Crossing II
WPO file number: WP0201400092
Stormwater Management Plan Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
installed
permanent diversion or ditch
745 ft
$13.00
$9,685.00
standard manhole frame top (not inlet)
2 ea
$500.00
$1,000.00
drop inlet or grate
0 ea
$3,500.00
$0.00
manhole structure (per ft. rise)
17 ft
$450.00
$7,650.00
pipe, rcp, cmp (15 to 48")
15.0 in d
0 ES -1,2
0 EC -1
27.0 ft
$35.00
$945.00
aggregate base or drainage stone
0.0 in d
0.0 ft L
0.0 ft W
0.0 ton
$35.00
$0.00
earthwork for Retention Basin 1 A
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
'Volume anaylsis performed in Civil3D,
top width
ft
width of cut
ft
includes grading necessary to convert
(area above transition)
0 sf
(area below transition,
0 sf
sediment basin to SWM facility.
(total width of dam)
0 ft
(total width of cut)
0 ft
1,584 cy cut, 0 cy fill
(height below transitior
0 ft
(depth below transitioi
0 ft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
JOAL CY estimate)
1584 cy
$13.00
$20,592.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
Basin structure included w/ E&S bond
riser height
ft
riser diameter
in
(riser unit price)
$0.00
$0.00
barrel length
ft
base plate or fdn
$200.00
$0
barrel diameter
in
(barrel unit price)
$0.00
$0.00
barrel collars
0
$200.00
$0
baffle length
0 ft
$50.00
$0
earthwork for Retention Basin 2B
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
`Volume anaylsis performed in Civil3D,
top width
ft
width of cut
ft
includes grading necessary to convert
(area above transition)
0 sf
(area below transition,
0 sf
sediment basin to SWM facility.
(total width of dam)
0 ft
(total width of cut)
0 ft
1,391 cy cut, 0 cy fill
(height below transitior
0 ft
(depth below transitioi
0 ft
(area below transition)
0 sf
(area above transition
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
JOAL CY estimate)
1391 cy
$13.00
$18,083.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
Basin structure included w/ E&S bond
riser height
ft
riser diameter
in
(riser unit price)
$0.00
$0.00
barrel length
ft
base plate or fdn
$200.00
$0
barrel diameter
in
(barrel unit price)
$0.00
$0.00
barrel collars
0
$200.00
$0
baffle length
0 ft
$50.00
$0
6/16/2016
Foothills Crossing II
WPO file number: WPO201400092
Stormwater Management Plan Bond Estimate
Item Item
Number
trees
shrubs
seedlings
underdrain (LF)
biofilter soil mix (C` )
trash rack/ anti vortex devices
maintenance access road (LF)
rip -rap, placed depth
volume (cu. ft.)
survey and layout (price per 0.1 mi.) acres
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
ft length ft
(tons) 0
3.5 basins 2
No. Unit
Unit Cost
Cost
$13,150.00
installed
$144,650
41 ea
$150.00
$6,150.00
66 as
$50.00
$3,300.00
0 as
$5.00
$0.00
59 ft
$5.00
$295.00
0 cy
$38.00
$0.00
2 ea
$1,500.00
$3,000.00
971 ft
$50.00
$48,550.00
$60.00
$0.00
$2,750.00
$500.00
1 ea
$2,000.00
$2,000.00
1 ea
$2,000.00
$2,000.00
1 ea
$5,000.00
$5,000.00
cost sum
$131,500.00
contingency
$13,150.00
Total
$144,650
6/16/2016
Foothills Crossing II
WPO file number: WP0201400092
Erosion and Sediment Control Bond Estimate
Item Item
Number
No. Unit Unit Cost Cost
(installed)
stablization (PS, TS)
30.1 acres
$5,000.00
$150,500.00
silt fence (SF)
3838.0 ft
$5.00
$19,190.00
safety fence (SAF)
1930.0 ft
$5.00
$9,650.00
diversion (DD, FD, RWD)
1533 ft
$13.00
$19,929.00
temporary slope drain (TSD)
pipe length
ft
pipe diameter
in
$0.00
$0.00
earthwork for Sediment Basin #1
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
'Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transition)
0 sf
9,400 cy cut, 4,553 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 sf
(area above transition,
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
10918 cy
$13.00
$141,934.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
structures for Sediment Basin #1
riser height
6.5 ft
riser diameter
48 in
(riser unit price)
$150.00
$975.00
barrel length
646.6 ft
base plate or fdn
1
$200.00
$200
barrel diameter
30 in
(barrel unit price)
$65.00
$42,029.00
barrel collars
2
$200.00
$400
baffle length
69 ft
$50.00
$3,450
earthwork for Sediment Basin #2
height of dam at toe
ft
cut at high side
ft
height of fill at face
ft
cut at face
ft
length of dam
ft
length of cut
ft
top width
ft
width of cut
ft
'Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transition)
0 sf
18,593 cy cut, 702 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 sf
(area above transition,
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
18827 cy
$13.00
$244,751.00
width of spillway
ft
(spillway stone tons)
0 tons
$50.00
$0.00
structures for Sediment Basin #2
riser height
12 ft
riser diameter
36 in
(riser unit price)
$70.00
$840.00
barrel length
166 ft
base plate or fdn
1
$200.00
$200
barrel diameter
30 in
(barrel unit price)
$65.00
$10,790.00
barrel collars
2
$200.00
$400
baffle length
225 ft
$50.00
$11,250
6/16/2016
Foothills Crossing II
WPO file number: WP0201400092
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for Sediment Basin #3
$150.00
$200.00
$200
$1,760.00
height of dam at toe
ft
cut at high side
ft
0 $100.00
height of fill at face
ft
cut at face
ft
$11,700.00
length of dam
ft
length of cut
ft
$2,000.00
top width
ft
width of cut
ft
'Volume analysis performed in Civil3d
(area above transition)
0 sf
(area below transition)
0 sf
3,005 cy cut, 120 cy fill
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 sf
(area above transition,
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
ft
(TOAL CY estimate)
3045 cy
width of spillway
ft
(spillway stone tons)
0 tons
structures for Sediment Basin #3
riser height
3 ft
riser diameter
24 in
(riser unit price)
$50.00
barrel length
44 ft
base plate orfdn
1
barrel diameter
18 in
(barrel unit price)
$40.00
barrel collars
2
baffle length
ft
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP) (8 total)
total area
2600 sf
channel (SCC, matted)
length
ft
width
ft
check dam
depth in channel
ft
channel width
ft
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
depth
ft
length
1.0 ft
width
(tons)
0 tons
survey and layout (price per 0.1 mi.)
acres
30.05
traps and basins
3
mobilization
stream crossing (computed independently)
No. Unit Unit Cost Cost
(installed)
$13.00 $39,585.00
$50.00 $0.00
$16,525.00
$500.00
$0.00
cost sum $745,208.00
contingency $74,520.80
Total $819,730
6/16/2016
$150.00
$200.00
$200
$1,760.00
$200.00
$400
$50.00
$0
0 $100.00
$0.00
62 $200.00
$12,400.00
1 $11,700.00
$11,700.00
$0.00
$0.00
$0.00
$2,000.00
$0.00
1 $2,000.00
$2,000.00
1 $3,500.00
$3,500.00
$60.00
$0.00
$16,525.00
$500.00
$0.00
cost sum $745,208.00
contingency $74,520.80
Total $819,730
6/16/2016