Loading...
HomeMy WebLinkAboutWPO201500030 Bond Estimates 2015-10-20 **wry Justin Deel From: Justin Deel Sent: Tuesday, October 20, 2015 11:40 AM To: Ana Kilmer Subject: WPO201500030 Bond Estimates Attachments: WPO201500030 ESC_bond_est.xlsx; WPO201500030 SWM-Mitigation Bond.xlsx Ana, Attached are the ESC&SWM/Mitigation bond estimates. The parcel on the request, 60E2-1, is the only parcel affected by this project. Justin Deel, EIT Civil Engineer II Department of Community Development County of Albemarle, Virginia 434.296.5832 ext. 3565 1 '"" 'Noe 4 Project Name: Farmington CC East Nine Improvements WPO file number:WPO201500030 Stormwater ManagementlMitigaton Bond Estimate Item Item No.Unit Unit Cost Cost Number pnstalletl) pees ,8 dNenlon or ditch(gravel dlaplren) 377 It $13.00 $4,901 00 drainage stone 12 0 m d 3770 ft L 1 5 ft W 39 6 ton 535 00 $1.385 48 survey and Swag(pace per 0.1 ru) acres 3377 Maine 0 510,88560 mlegallonheformeadico 358 ao Ig Imes48/ac 172 ea $160.00 $25,775.00 sm trees 193/ac 881 ea $100 00 $89,094 00 samba 435.10 1557 ea $5000 $77085.00 mcblles8on 3500.35 cost sum $196,40848 pro,mgmt $29 480 97 contingency $22,58874 Total 5248,460 10/20/2015 Project Name: Farmington CC East Nine Improvements WPO file number:WP0201500030 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number Onstalledl stabliration(PS.TS) 33.77 acres 9188,850 00 nit fence(SF) 7290 ft $38,45000 safety fence/tree protection ft $0 00 diversion(DO.FD,RWD) 1110 ft $14,43000 temporary slope drain(TSD) pipe length 150 ft pipe diameter 15 in $5 750 00 earthwork fa trap/basin ST 1 height of dam at tae 2 ft cut at high side 7 ft height of fill at face 6 ft cut at face 6 ft length of dam 70 ft length of cut 70 ft tap width 10 ft width of cut 35 ft • length of spillway 25 ft $13 00 $11,713 00 width of sptllway 17 ft $50 00 $1,220 00 earthwork fa trap/basin ST 2 height of dam at toe 5 ft cut at high side 7 ft height of fill at face 6 ft cut at face 0 ft length of dam 70 ft length of cut 70 ft top width 10 ft width of cut 40 ft length ofsptliway 20 ft . $1300 96,13600 width of spillway 10 ft $50 00 $575 00 silt fence inlet protection(IP) $000 stare inlet protection(IP) $0 00 outlet protection(OP) length 16 ft width 6 ft 1 $432 00 channel(SCC.matted) length ft width ft $000 check dam depth in channel ft channel width ft $0 00 construction entrance(CE) 3 $6,00000 wash rack 1 $2,000 CO paved construction entrance $0 00 mudtraps depth 3 ft length 6 ft width 9 5 $2,484 00 survey and layout(once per 0 1 mi) acres 33 77 traps and banns 2 $17.88500 mabilizaean $500 00 stream crossing(computed indepe nden0y) $0 00 cost sum $274,425 00 Prot mgmt $41,16375 contingency $31,55888 Total 5347,150 10/20/2015