Loading...
HomeMy WebLinkAboutWPO201400094 Review Comments 2015-09-18Short Review Comments Report for: WPO201400094 SubApplication Type: Whittington - Phase B - VSMP Stormwater Management/BMP Plan Erosion and Sediment Control Plan Stream Buffer Mitigation Plan Date Completed:03/13/2015 Reviewer:Glenn Brooks Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/11/2014 Reviewer:Justin Deel Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/13/2015 Reviewer:Justin Deel Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:07/30/2015 Reviewer:Justin Deel Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:09/10/2015 Reviewer:Justin Deel Engineering Review Status:Requested Changes Reviews Comments:Please address the following final comments by sending me the revised sheets via pdf. After approval I will need 2 signed/stamped copies. I have one untouched copy that you may slip the revised sheets in to, if you’d like to recycle that one. The other copy I have is marked up. Note that the mitigation plan will need to be reviewed and approved before ultimate VSMP approval. SWPPP 1. Incorporate all requested changes, provide two copies. SWM 1. Please use varying line weights and shading to clear up the Structure 24A detail on sheet E27. Correct the note referencing the detail on sheet E28, it currently references E33. E&SC 1. Provide a TSD detail specific to the application being proposed. The provided detail is for a typical application, which is not what’s being proposed. The provided detail calls for 24:1 slope entrance section. This does not appear possible. What will prevent the drains from sliding? Also, there should be a sump at the TSD entrance point, which may help solve the flat entrance section problem. 2. Ensure SB-6 is sized for its entire drainage area. The drainage area on sheet E21 does not appear to reflect the diversion dikes and temporary slope drains. Division: Date Completed:09/18/2015 Reviewer:Justin Deel EngineeringDivision: Page: 1 of 2 County of Albemarle Printed On: June 20, 2016 Review Status:Approved Reviews Comments: Date Completed:09/29/2015 Reviewer:Justin Deel Engineering Review Status:See Recommendations Reviews Comments:SWM and ESC bond estimates sent to Ana Kilmer, 9/29/2015. Division: Date Completed:10/27/2015 Reviewer:Ana Kilmer CommDev-Central Ops Review Status:Approved Reviews Comments:10/12/2015 - swa was submitted 10/13/2015 - swa approved by CAO 10/14/2015 - swa signed by CE 10/14/2015 - swa will be recorded at the Clerks Office 10/27/2015 - swa recorded at clerks office. deed book 4689, page 120 Division: Date Completed: Reviewer:Max Greene Engineering Review Status:Pending Reviews Comments: Division: Page: 2 of 2 County of Albemarle Printed On: June 20, 2016