HomeMy WebLinkAboutWPO201400094 Review Comments 2015-09-18Short Review Comments Report for:
WPO201400094
SubApplication Type:
Whittington - Phase B - VSMP
Stormwater Management/BMP Plan
Erosion and Sediment Control Plan
Stream Buffer Mitigation Plan
Date Completed:03/13/2015
Reviewer:Glenn Brooks Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:12/11/2014
Reviewer:Justin Deel Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:03/13/2015
Reviewer:Justin Deel Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:07/30/2015
Reviewer:Justin Deel Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:09/10/2015
Reviewer:Justin Deel Engineering
Review Status:Requested Changes
Reviews Comments:Please address the following final comments by sending me the revised sheets via pdf. After
approval I will need 2 signed/stamped copies. I have one untouched copy that you may slip the
revised sheets in to, if you’d like to recycle that one. The other copy I have is marked up. Note that
the mitigation plan will need to be reviewed and approved before ultimate VSMP approval.
SWPPP
1. Incorporate all requested changes, provide two copies.
SWM
1. Please use varying line weights and shading to clear up the Structure 24A detail on sheet
E27. Correct the note referencing the detail on sheet E28, it currently references E33.
E&SC
1. Provide a TSD detail specific to the application being proposed. The provided detail is for a
typical application, which is not what’s being proposed. The provided detail calls for 24:1 slope
entrance section. This does not appear possible. What will prevent the drains from sliding? Also,
there should be a sump at the TSD entrance point, which may help solve the flat entrance section
problem.
2. Ensure SB-6 is sized for its entire drainage area. The drainage area on sheet E21 does not
appear to reflect the diversion dikes and temporary slope drains.
Division:
Date Completed:09/18/2015
Reviewer:Justin Deel EngineeringDivision:
Page: 1 of 2 County of Albemarle Printed On: June 20, 2016
Review Status:Approved
Reviews Comments:
Date Completed:09/29/2015
Reviewer:Justin Deel Engineering
Review Status:See Recommendations
Reviews Comments:SWM and ESC bond estimates sent to Ana Kilmer, 9/29/2015.
Division:
Date Completed:10/27/2015
Reviewer:Ana Kilmer CommDev-Central Ops
Review Status:Approved
Reviews Comments:10/12/2015 - swa was submitted
10/13/2015 - swa approved by CAO
10/14/2015 - swa signed by CE
10/14/2015 - swa will be recorded at the Clerks Office
10/27/2015 - swa recorded at clerks office. deed book 4689, page 120
Division:
Date Completed:
Reviewer:Max Greene Engineering
Review Status:Pending
Reviews Comments:
Division:
Page: 2 of 2 County of Albemarle Printed On: June 20, 2016