Loading...
HomeMy WebLinkAboutSDP201600025 Study 2016-04-27 ',NW? O WATERWAYS Ecological Restoration Design - Civil Engineering - Natural Resource Management Hydrologic and Hydraulic Analysis for Briarwood Development, Charlottesville VA Prepared for Collins Engineering April 27, 2016 BACKGROUND The proposed project is located along the North Fork Rivanna River adjacent to St. Ives Road and approximately 1,100 linear feet upstream of the Route 29 crossing. The proposed project calls for fill within Zone AE of the FEMA Flood Insurance Rate Map(FIRM)for Albemarle County and the City of Charlottesville(Map#: 51003C0145D). The proposed fill area is located outside of the regulatory floodway. Waterways Consulting conducted a basic hydraulic analysis of the North Fork Rivanna River in the vicinity of the project to determine impacts, if any,to the 100- year base flood elevations. HYDROLOGY Table 3 of FEMA Flood Insurance Study(FIS)for Albemarle County and the City of Charlottesville (Study#51003CV000B)states that the 100-year peak discharge for the North Fork Rivanna River is 30,000 cubic feet per second upstream of Preddy Creek. This value was used for the hydraulic analysis. HYDRAULICS A HEC-RAS hydraulic model was developed to compare base flood (100-year) elevations for existing conditions and proposed grading conditions. The following model components were used in this analysis. Cross Sections 2-foot contours, provided by Collins Engineering,were used for the north side of the river. This data was supplemented with 4-foot contours, acquired from the County of Albemarle's on-line GIS website,for the south side of the river. Cross section locations were selected based on channel topography and the proposed project location (See Figure 1). Eight cross sections were used to develop the hydraulic model. The following table shows the model cross sections which correspond with FEMA cross sections. Model Cross Section FEMA Cross Section XS-2 AE XS-6 AF XS-8 AG 509A Swift St,Santa Cruz,CA 95060, Ph:831-421-9291 // 1020 5W Taylor St.,Ste 610,Portland,OR 97205, Ph:503-227-5979 • ON .r sNoao 880H0ro arnvda w *g DNI DtJ1 lflS OJ� 8V1:1IVD 03H DOOM J6 tai SAVM2111VM 1111 Fr !a a ,< I( Fcf / ,/ / // / / / / // / / / / / / / / / — / / / / // / / ! // / / // / :— .-- '' ./ LD , ! 1 7 // / / tr, / 4j // // // / Q / / / / /1 1 // / I / / \ / \ / , \ / // / \ \ 1 1 / WATERWAYS CONSULTING, INC. The Route 29 crossing downstream of the proposed project was not modeled as part of this analysis. Roughness values (Mannings n)for existing conditions were set at 0.06 for within the channel and 0.06 for overbank areas, per Table 4 of the FIS. These roughness values were maintained for proposed conditions; except at fill locations where the roughness was set at 0.03 to match anticipated vegetation conditions (grass). Flows The 100-year flow value of 30,000 cfs was used for the entire reach of the model. Upstream boundary conditions were set based on a channel slope (Normal Depth)equal to 0.3%. Downstream boundary conditions were set as a known water surface of 394.5'. RESULTS The results of this analysis show no appreciable rise in the 100-year base flood elevations due to proposed fill within the floodplain. HEC RAS flood profiles,cross sections, and output table have been provided in Appendix A. Ecological Restoration Design — Civil Engineering — Natural Resource Management ',�► WATERWAYS CONSULTING, INC. APPENDIX A Ecological Restoration Design — Civil Engineering — Natural Resource Management 0) C c60 0 (g ox 'O O W ° cQ . c p) 1 >.. O J T O C7 O 0 r V) O O N • 8-SX 0 0 N L-SX CO N - d- o 0 0 "0 N C O - U X UJ 4 II9-SX F\--1 CD O N CO N • � o 9-SX -Po cm U c N '5 - N a c c i N U c o ., o S 17-SX-SX I T c as - d -a ' C-SX 0 - 0 m o Z-SX I 'n l l-SX o o m m co coo co N co co V co co co co co co co co (j)uopenel3 wNine m C7 U o o ` Es .- o a o ca m U 0 0 o c o u) w w o x 0 x0 o c .- w w w n o CD . `>, ' •� ■a •a � . a •� ■ata J T o c U) c6 J >, o 'C CO ' . _ d O O C C U) O O Y C U) o Cn , m o Y 0 CO (7 o CO 0 05 m > CO 0 m 0 0 ro 0 0 Lo 0 r-0o 0 wc O _ O LU Uj -c-q. (V 0) O) o Es O Oto coo i X - X - QCL ,-- v ,-- v C C 0 0 as up N co 0_ d 0 0 O 0 RS 0 MS CO CO 0 0 o -o NCV r r_,--i- T . , , , , , r 7, , , , , , , r -r0 � � � �-, - , -, I . , ,-r-r-r7-. . T T-r r 0 0 _O 0 0 0 0 0 0 0 00 V V CO CO CO C) V 7 d0' 0) M cn M (4)uoilsna13 (11)uoilenal3 Es 0 13 c o to 0 o 0 0 tf V X U x C7 n d x n U x 0 o_ C o w w w o o c w w o 0 En . ` . •a •■a •to cf• T•a •� •■a ha o J i. O (A J o . j (n -0 N o O - c CO O 0 Y C C/) O O Y C CO(n fir` [6 03 Y m 0 n) m m o ____-_ o p -o op O • O _ -O in O -o co C - C O U 0 X - x W W N N 0 O 0) C C O 1. - N o0 a to Q In 0 X - X CL -o c 0 co ro - � a CL CL 0 - o 0 0 (TS0 0 C _O CO N CO :' O -O N O -O • 1 `f Tr O O O O O O O O O 0 O O O O N OO co O N O Cr) CO 1` CO tt V V co co co co V V V co co co co (II)uoilenO (ii)uoilenal3 a c ) m O c c 0) c U 0 o O ca - U m 0o O c ww W oo w ,- w n C o a adT. •� ,a •o_ rn �i • ' ■ : •d (J 0 >. c w c6 J 0j„ c ' VO 0 7 -O OO C U) O O Y C U) C OU) ,- c0 0 Y 3 m 0 m CO o m o 0 o ---- 0 N L O DC 0Ux W oN O0) 0)Cla 1 M O0 U) coXo CC d Cl)- 0-o17 17 co� 0 -0 v 0 -O N, _ P 'JO -O N I ' ' Ir T - i r T r r---I- r Tr- O nr - � � r, , , i 1 .rT r--r r-r-O O O O O O O O N O CO 00 r•-• c0 N O O O co I. coV V' V co co co co V co co co co (11)uoileneo (11)uoilenal2 Nue 'Ire CI) oC-C -5 a 0 a N CC •'-, NO O 6 O ,_ ON uwx w v o x Oo- 0 0X Oa C Lu 09 iaW W 0_NTo •cu •d •d 0 �4 . N • •d . O `O C C U) o O C "C N (/) N CD O Y (/) 07 oO - m o m 3 m 0 m O ----- ----- ------ O _0 -o N- 00 0 -o N. -o co 'a C C O 0 X - 0 --o LU xo LU N 'n N 0) 0) C C O `5 Ln 12 '��RR o N OO o Q V CL X ,-o co sr X X T v T CL4-..___- C O C O -O O ro 03 CL d 0 0 M "C3 -o O O :0.20. o 0) CO CO O -O N 0 -0 N O -O CO as r 0 -0 f-' -r , i I-1-7T--T -0 1 . TT -- I , I 'T . I , rT T I • O 0 0 0 0 co000 0 0 0 00 0 0 0 0 0 0 N. 0 V V 0) co co co V V V 0) 0) co co (10 uoilenOI (11)uoilenel3 N N O O O ? cp 111 111 11111 on EN in slim lour W p> sidMo p E El r V O M illi O O �Ill fODcO0 fOD M M M M TO � � p � ump � �� � O _O� � p �� M � � a bygv � g egg L' r a w a w a w a w a w a w a w a w f0 � m � O pT p�. p1. p ppp>. >. T O O O O O O O O O O O O $ O O S O {d L � O D d cV N N N N N N N O . M M O O (D c0 U N ltl N N c0 cC �tl N l0 l0 ld c0 W ld = m m m m m m m m m m m m m m m m