Loading...
HomeMy WebLinkAboutWPO201600004 Bond Estimates 2016-06-24 (3)Project Name" Sunset Ovelook WPO file number: WP0201600004 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) stablization (PS, TS) 7.5 acres $5,000.00 $37,500.00 silt fence (SF) 3200.0 ft $5.00 $16,000.00 safety fence (SAF) 0.0 ft $5.00 $0.00 diversion (DD, FD, RWD) 1100 ft $13.00 $14,300.00 temporary slope drain (TSD) pipe length 100 ft pipe diameter 15 in $35.00 $4,000.00 earthwork for basin height of dam at toe 15 ft cut at high side 15 ft height of fill at face 8 ft cut at face 3 ft length of dam 140 ft length of cut 100 ft top width 10 ft width of cut 140 ft (area above transition) 208 sf (area below transition; 438 sf (total width of dam) 30 ft (total width of cut) 176 ft (height below transition) 7 ft (depth below transitior 12 ft (area below transition) 56 sf (area above transition 912 sf (total fill volume) 1368.9 cy (total fill volume) 5000.0 cy length of spillway 40 ft (TOAL CY estimate) 5456 cy $13.00 $70,928.00 width of spillway 40 ft (spillway stone tons) 92 tons $50.00 $4,600.00 structures for basin riser height 12 ft riser diameter 18 in (riser unit price) $40.00 $480.00 barrel length 78 ft base plate or fdn 1 $200.00 $200 barrel diameter 15 in (barrel unit price) $35.00 $2,730.00 barrel collars 2 $200.00 $400 baffle length 0 ft $50.00 $0 earthwork for trap height of dam at toe 8 ft cut at high side 7 ft height of fill at face 4 ft cut at face 0 ft length of dam 50 ft length of cut 70 ft top width 6 ft width of cut 35 ft (area above transition) 56 sf (area below transition; 0 sf (total width of dam) 16 ft (total width of cut) 49 ft (height below transition) 4 ft (depth below transitior 7 ft (area below transition) 16 sf (area above transition 122.5 sf (total fill volume) 133.3 cy (total fill volume) 317.6 cy length of spillway 18 ft (TOAL CY estimate) 362 cy $13.00 $4,706.00 width of spillway 35 ft (spillway stone tons) 36.2 tons $50.00 $1,810.00 silt fence inlet protection (IP) 0 $100.00 $0.00 stone inlet protection (IP) 17 $200.00 $3,400.00 outlet protection (OP) length 12 ft width 8 ft 2 $432.00 $864.W412016 Project Name" Sunset Ovelook WPO file number: WP0201600004 Erosion and Sediment Control Bond Estimate Item Item Number channel (SCC, matted) length check dam depth in channel construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed 0 ft width 0 ft $0.00 0 ft channel width 0 ft 0 $0.00 $0.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 2 ft length 70.0 ft 8.0 (tons) 64.4 tons $60.00 $3,864.00 7.5 traps and basins 2 $4,750.00 $500.00 $0.00 cost sum $176,532.00 contingency $17,653.20 Total $194,190 6/24/2016 Approximate Earthwork computations for sed Assumes all out and fill slopes are 2:1 for simplicty Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h 1) + h 1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut liment traps and basins Width rn point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)