HomeMy WebLinkAboutWPO201600004 Bond Estimates 2016-06-24Project Name: Sunset Overlook WPO file number: wpo201600004 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 aggregate base or drainage stone 15.0 in d 70.0 ftL 80.0 ft w 490.0 ton $35.00 $17,150.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitioi 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 trees 12 ea $150.00 $1,800.00 shrubs 52 ea $50.00 $2,600.00 seedlings 0 ea $5.00 $0.00 Mulch 60 cy $30.00 $1,800.00 underdrain (LF) 720 ft $5.00 $3,600.00 biofilter soil mix (CY) 650 cy $38.00 $24,700.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF) 250 ft $50.00 $12,500.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 3 basins 3 $3,000.00 mobilization $500.00 as -built drawings (per facility) 3 ea $2,000.00 $6,000.00 materials testing (per facility) 3 ea $2,000.00 $6,000.00 compaction testing (per dam) 3 ea $5,000.00 $15,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $96,150.00 6/24/2016 Project Name: Sunset Overlook WPO file number: wpo201600004 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) contingency $9,615.00 Total $105,770 6/24/2016