Loading...
HomeMy WebLinkAboutWPO201500033 Approval - County 2016-06-29COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review Hillbrook — VSMP amendment WP0201600041 amendment to WP0201500033 Shimp Engineering HILLTOP PARTNERS LLC 7 June 2016 29 June 2016 Max Greene Uustin@shimp-engineering.com] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Existing SWPPP will be updated to reflect this amendment to the original WP0201500033 VSMP plan. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Existing PPP will be updated to reflect this amendment to the original WP0201500033 VSMP plan. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. This amendment to relocate the underground detention facility due to rock in area previously approved under WP0201500033. No adjustments to existing bond or SWM agreement. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. This amendment does not change the E&SC portion of the original plan, other than location of underground detention structure. Field changes to E&SC will be documented on the existing SWPPP. File: CDDE1_vsmp_Approval_Hillbrook wpo20l60004l.doc