HomeMy WebLinkAboutWPO201600031 Review Comments WPO VSMP 2016-07-06COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Whittington Phase B Amendment
Project file number: WP0201600031
Plan preparer: Dominion Engineering [mmers@dominioneng.com]
Owner or rep.: PIEDMONT NEIGHBORHOODS LP [email]
Plan received date: 21 April 2016
29 June 2016
Date of comments: 10 May 2016
6 July 2016
Reviewers: Max Greene
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
This is an amendment to an approved plan. This plan and information will be added to the site
SWPPP.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
This is an amendment to an approved plan. This plan and information will be added to the site
SWPPP.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Pipe Profiles matching the pipe chart Changes are missing from the submittal.
Comment has been addressed.
2. The Westlake Hills property owner will need to post the Mitigation bond and SWM Agreement for
WP0201500067 prior to final plan approval.
A plat (SUB201600121) has been submitted for review/approval for the mitigation planting
easement on Westlake Hills Subdivision. The plat appeared approvable once the surveyor
signed and sealed the plat. This plan can be approved after the easement plat is recorded and
Engineering Review Comments
Page 2 of 3
the deed book and page number are submitted to the attention of this document/file number.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Amendment to WPO201400094 appears to address the proposed additional land disturbance. The
amendment will be added to the on-site SWPPP once approved.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptfonns.asp?department--cdengmMo
Engineering Review Comments
Page 3 of 3
File: E1 vsmp_review_projectname.doc
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Whittington Phase B Amendment
Project file number: WP0201600031
Plan preparer: Dominion Engineering [mmers@dominioneng.com]
Owner or rep.: PIEDMONT NEIGHBORHOODS LP [email]
Plan received date: 21 April 2016
Date of comments: 10 May 2016
Reviewers: Max Greene
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
This is an amendment to an approved plan. This plan and information will be added to the site
SWPPP.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. This is an amendment to an approved plan. This plan and information will be added to the site
SWPPP.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Pipe Profiles matching the pipe chart Changes are missing from the submittal.
2. The Westlake Hills property owner will need to post the Mitigation bond and SWM Agreement for
WP0201500067 prior to final plan approval.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
Engineering Review Comments
Page 2 of 2
1. Amendment to WPO201400094 appears to address the proposed additional land disturbance. The
amendment will be added to the on-site SWPPP once approved.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hqp://www.albemarle.org/deptforms.asp?department--cdengMTo
File: E1_vsmp_review projectname.doc
141111001 '101111,
fs
Cepvs
4 44"��� Dominion 172 South Pantops Drive
�� ► Engineering Charlottesville, VA 22911
434.979.8121 (p)
°s Ssis,, 434.979.1681 (f)
msS DominionEng.com
June 8, 2016
Max Greene
Albemarle County Community Development
401 McIntire Road
Charlottesville, Virginia 22902
RE: Whittington Phase B—(WPO 2016-00031)Comment-Response Letter
Dear Max,
Enclosed please find four(4) sheet inserts for the VSMP Plan that have been revised based on your comments
in accordance with the following:
A.Stormwater Pollution Prevention Plan(SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1)a
PPP,(2)an ESCP, (3)a SWMP, and(4)any TMDL measures necessary.
1. This is an amendment to an approved plan.This plan and information will be added to the site SWPPP.
RESPONSE: The amendment sheets will be inserted into the SWPPP upon SWMP amendment
approval.
B.Pollution Prevention Plan(PPP)
The PPP content requirements can be found in County Code section 17-404.
1. This is an amendment to an approved plan. This plan and information will be added to the site SWPPP.
RESPONSE: The amendment sheets will be inserted into the SWPPP upon SWMP amendment
approval.
C. Stormwater Management Plan(SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP.This plan
is disapproved,and the reasons are provided in the comments below. The stormwater management plan content
requirements can be found in County Code section 17-403.
1. Pipe Profiles matching the pipe chart Changes are missing from the submittal.
RESPONSE: Sheet E30 has been added to the amendment plan so that the pipe profiles match the
changes in the pipe chart.
2. The Westlake Hills property owner will need to post the Mitigation bond and SWM Agreement for
WPO201500067 prior to final plan approval.
RESPONSE: The owners of Westlake Hills have chosen to create an easement for mitigation on their
property. Mitigation bond and SWM Agreement are no longer necessary.
Page 1 of 2
'`pr
o°o<s
a`46.1 Dominion 172 South Pantops Drive
07
4 l� \ Engineering Charlottesville,VA 22911
111 f 434.979.8121 (p)
•,o *���►� 434.979.1681 (f)
°e,.s s DominionEng.com
We thank you for taking the time to review this revision and please let me know if you have any questions or
require additional information.
Best Regards,
Dustin Greene, EIT.