HomeMy WebLinkAboutWPO201600047 Approval - County 2016-07-07COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Faith Christian Center International - amendment
Project file number: W002014000
Plan preparer: Jeremy Fox Ufox@roudabush.com]
Owner or rep.: FAITH CHRISTIAN CENTER INTERNATIONAL INC
Plan received date: 14 June 2016
Date of comments: 6 July 2016
Reviewers: Max Greene
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is Approved. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. This amendment will be added to the existing SWPPP on site.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. This amendment will be added to the existing PPP on site.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. SWM requirements have not changed with this amendment.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. This amendment corrects a problem in the field construction to allow the completion of the site
grading while protecting the stream and downstream properties per VESCH, VESCL, and DEQ.
Engineering Review Comments
Page 2 of 2
Process;
This plan amendment does not require changes to the bonds or process. VSMP inspector will deliver the
set of approved plans to the owner/site. The SWPPP and PPP plans will be updated on site to reflect the
amendment.
File: CDDE1_vsmp_Approval—Faith Christian Center wpo20l600047.doc